Wuzi Xueyuan Lu station

Wuzi Xueyuan Lu[1] (simplified Chinese: 物资学院路站; traditional Chinese: 物資學院路站; pinyin: Wùzīxuéyuànlù Zhàn) is a station on Line 6 of the Beijing Subway.[2] The construction of this station began on September 20, 2012,[2] and was completed in 2014.[3] This station is the first in Tongzhou District, Beijing when travelling eastbound towards Lucheng.

Wuzi Xueyuan Lu

物资学院路
Platform
LocationWuzixueyuan Road (物资学院路) and North Chaoyang Road (朝阳北路)
Tongzhou District, Beijing
China
Coordinates39.9269°N 116.6393°E / 39.9269; 116.6393
Operated byBeijing Mass Transit Railway Operation Corporation Limited
Line(s)     Line 6
Platforms2 (1 island platform)
Tracks2
Construction
Structure typeUnderground
Disabled accessYes
History
OpenedDecember 28, 2014
Services
Preceding station   Beijing Subway   Following station
towards Jin'an Qiao
Line 6
towards Lucheng
Location
Wuzi Xueyuan Lu
Location in Beijing

Station Layout

The station has an underground island platform.

Exits

There are 3 exits, lettered A, B, and D. Exits A and D are accessible.

References

  1. https://www.bjsubway.com/jpg.html
  2. (Chinese) 北京地铁6号线二期东小营站工程正式开工. 北京市政建设集团有限责任公司第三工程处. Retrieved 26 December 2012.
  3. (Chinese) 北京地铁6号线二期3站一体开发. QQ News. Retrieved 26 December 2012.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.