Chegongzhuang Xi (W) station
Chegongzhuang Xi (W)[1] (simplified Chinese: 车公庄西站; traditional Chinese: 車公莊西站; pinyin: Chēgōngzhuāng Xī Zhàn) is a station on Line 6 of the Beijing Subway.[2] This station opened on December 30, 2012.[3][4]
Platform | |||||||||||
Location | Chegongzhuang Street (车公庄大街) and Zhanlanguan Road Xicheng District, Beijing China | ||||||||||
Operated by | Beijing Mass Transit Railway Operation Corporation Limited | ||||||||||
Line(s) | Line 6 | ||||||||||
Platforms | 2 (1 split island platform) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Disabled access | Yes | ||||||||||
History | |||||||||||
Opened | December 30, 2012 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Chegongzhuang Xi (W) Location in central Beijing |
Station Layout
The station has an underground split island platform.
Exits
There are 4 exits, lettered A, B, C, and D. Exits A and C are accessible.
Gallery
- Concourse
References
- https://www.bjsubway.com/jpg.html
- 耿诺 (November 12, 2010). 地铁6号线一期沿线站名确定. Beijing.cn (in Chinese). Archived from the original on December 24, 2013.
- Beijing Municipal Commission of Transport (September 26, 2012). 轨道交通6号线预计年底试运营 五项第一彰显北京地铁新奇迹 [Rail transit line 6 is expected by the end of the trial operation five first highlight the new miracle of the Beijing subway] (Press release) (in Chinese). Archived from the original on 2012-11-11.
- 北京四地铁线30日开通 首末车时间确定 (in Chinese). 新京报. Retrieved December 26, 2012.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.