Hyderabad Metro

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India.[5][6] It is the second longest operational metro network in India after the Delhi Metro (285 stations) with 57 stations[7][8] and the lines are arranged in a secant model. It is funded by a public–private partnership (PPP),[9][10] with the state government holding a minority equity stake.[11] A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company L&T[12][13] to develop the Hyderabad metro rail project.[14][15] A 30-kilometre (19 mi) stretch from Miyapur to Nagole, with 24 stations, was inaugurated on 28 November 2017 by Prime Minister Narendra Modi.[16][17] This was the longest rapid transit metro line opened in one go in India.[18][19] It is estimated to cost 18,800 crore (US$2.6 billion). As of February 2020, about 490,000 people use the Metro per day.[2] Trains are crowded during the morning and evening rush hours.[20] A ladies only coach was introduced on all the trains from 7 May 2018.[21]

Hyderabad Metro
Overview
OwnerGovernment of Telangana (10%)
Larsen & Toubro (90%)
LocaleHyderabad, Telangana, India
Transit typeRapid Transit
Number of lines3 [1]
Line number3
Number of stations57[1]
Daily ridership490,000 (February 2020) [2]
Chief executiveN.V.S Reddy[3]
HeadquartersMetro Bhawan, Begumpet, Hyderabad
WebsiteL&T Metro
HMRL
Operation
Began operation29 November 2017[4]
Operator(s)Hyderabad Metro Rail Ltd. (HMRL)
Headway3.5 - 7 minutes
Technical
System length72 km (45 mi)
69 km (43 mi) (Operational)
No. of tracks3
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification25 kV, AC Overhead catenary
Average speed35 km/h (22 mph)
Top speed80 km/h (50 mph)
System map

Hyderabad Metro
Phase I
Miyapur
JNTU College
Raidurg
KPHB Colony
Hitec City
Kukatpally
Durgam Cheruvu
Balanagar
Madhapur
Moosapet
Peddamma Gudi
Bharat Nagar
Jubilee Hills
Check Post
Erragadda
Road No 5
Jubilee Hills
ESI Hospital
Yusufguda
S.R. Nagar
Madhura Nagar
Ameerpet
Punjagutta
Begumpet
Irrum Manzil
Prakash Nagar
Khairatabad
Rasoolpura
Lakdi-ka-pul
Paradise
Assembly
JBS Parade Ground
Nampally
Parade Ground
Gandhi Bhavan
Osmania
Medical College
Secunderabad
West | Jn | East
Mettuguda
Gandhi Hospital
Tarnaka
Musheerabad
Habsiguda
R.T.C. X Roads
NGRI
Chikkadpally
Stadium
Narayanaguda
Uppal
Sultan Bazaar
Nagole
MG Bus Station
Malakpet
Salarjung Museum
New Market
Charminar
Musarambagh
Shah-Ali-Banda
Dilsukhnagar
Shamsherganj
Chaitanyapuri
Jungametta
Victoria Memorial
Falaknuma
LB Nagar
Red Line
Green Line
Blue Line
Indian Railways lines

History

The Hyundai Rotem rolling stock of the Hyderabad metro [22]

Metro Rail Project was first initiated by N. Chandrababu Naidu, then-Chief Minister of United Andhra Pradesh state, in 2003.[23] As Hyderabad continued to grow, the MMTS had insufficient capacity for public transport, and the Union Ministry of Urban Development approved construction of the Hyderabad Metro Rail Project, directing the Delhi Metro Rail Corporation to conduct a survey of the proposed lines and to submit a Detailed Project Report (DPR).[24] To meet rising public transport needs and mitigate growing road traffic in the twin cities of Hyderabad and Secunderabad, the State Government of N. Chandrababu Naidu and the South Central Railway jointly launched the Multi-Modal Transport System (MMTS) in August 2003.[25][26] The initial plan was for the Metro to connect with the existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase II were also taken forward.[27]

In 2007, N.V.S Reddy was appointed Managing Director of Hyderabad Metro Rail Limited,[28] and the same year, Central Government approved financial assistance of 1639 crore under a Viability Gap Funding (VGF) scheme.[29] The option of an underground metro system in Hyderabad was ruled out by L&T due to the presence of hard rocks, boulders and the topography of the soil in Hyderabad.[30] On 26 March 2018, the Telangana government announced that it would set up an SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad, under Phase II after the completion of Phase I in 2019.

Initial bidding

The bidding process was completed by July 2008 and awarded to Maytas,[31] which failed to achieve financial closure for the project as per schedule by March 2009.

Re-bidding

The Nallari Kiran Kumar Reddy government cancelled the contract and called for a fresh rebidding for the project. In the July 2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the 121.32 billion (US$1.7 billion) project.[32] L&T came forward to take up the work for about 14.58 billion (US$200 million) as viability gap funding as against the sanctioned 48.53 billion (US$680 million). Kiran's government proactively pursued the project, but it was delayed due to separate state agitation and later due to the apprehensions of the new government.

Mascot

Prime Minister Narendra Modi taking a ride in the Hyderabad Metro in 2017

The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.[33]

Awards and nominations

The HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.[34][35]

L&T Metro Rail Hyderabad Limited (LTMRHL) was conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management'[36] category.

In 2018 the Rasoolpura, Paradise and Prakash Nagar Metro stations were awarded the Indian Green Building Council's (IGBC) Green MRTS Platinum Award.[37]

Hyderabad Metro was adjudged as the Best Urban Mass Transit Project by the Government of India in November 2018.[38]

Construction milestones

A view of the Hyderabad metro towards HITEC City
  • Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012[39] the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II.[40] The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets.[41] If the recent bill proposed in Parliament which allows construction within a 100-metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.[42]
  • The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015[43][44]
  • In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.[45]
  • The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015.[46] The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.
  • CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016.[47]
  • The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.[48][49]
  • In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.[50]
  • 16-km Ameerpet - LB Nagar Metro stretch was opened for commercial operations from 24 September 2018.[51]
  • The Ameerpet - HITEC City route was opened on conditional basis on 20 March 2019. The reversal facility after HITEC City metro station was started on 20 August 2019.[52]
  • On 19 May 2019, the construction of all the 2,599 pillars for the 66-km Hyderabad Metro rail (except the 6-km stretch in old city) was completed.[53][54]
  • The Green Line Corridor from Jubilee Bus Station to Mahatma Gandhi bus station was issued the Safety Certificate by the Commissioner of Metro Rail Safety and inauguration of services on the section was done on 7 February 2020 by Hon'ble Chief Minister of Telangana, Sri K. Chandrasekhar Rao.[55]

Network

Proposed lines of the Hyderabad Metro Rail (Note: JBS is not a Phase one station as shown. it is a Phase 2 station)

Currently, the Hyderabad Metro has 56 stations. Phase I of the Hyderabad metro has 64 stations; they have escalators and elevators to reach the stations, announcement boards and electronic display systems. The stations also have service roads underneath them to for other public transportation systems to drop-off and pick-up passengers.[56] The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.[57]

Otis Elevator Company supplied and maintains the 670 elevators in use on the system.[58]

In May 2018, L&T Metro Rail signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations.[59][60] L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.[61][62] Metro Rail Phase II expansion plan is for about 85 km.[63] In April 2019, K. T. Rama Rao said that 200 kilometres (120 mi) of metro rail was planned for Hyderabad, with metro along entire Outer Ring Road.[64] All metro corridors are scheduled to terminate at Shamshabad, near Rajiv Gandhi International Airport, as planned in Hyderabad Metro Rail Phase-II.[65] In August 2019, KT Rama Rao said that state cabinet has approved the Hyderabad Metro Airport Express Link from Raidurg to the airport.[66]

Current status

Line First operational Last extension Stations Length Terminals Rolling stock Track gauge
(mm)
Power Average Frequency (Minutes)
Red 29 November 2017 24 September 2018 2729 km (18 mi)MiyapurLB Nagar 1435 25 kV OHE 2
Blue 29 November 2017 29 November 2019 2327 km (17 mi)RaidurgNagole 1435 25 kV OHE 2
Green 7 February 2020 10 11 km (6.8 mi) JBS PG MGBS 1435 25 kV OHE
5767 km (42 mi)

Construction phases

The construction work was undertaken in two phases. There are six stages of completion in Phase I.[67]

Phase I

Phase I of the project includes 3 lines covering a distance of around 72 kilometres (45 mi). The metro rail line between Nagole and Secunderabad was originally scheduled open by December 2015; it was partly opened on 29 November 2017 with a new completion date of December 2019.[68] A 5.5 kilometres (3.4 mi)-long green line in the old city will pass through Dar-ul-Shifa, Purani Haweli, Eitebar Chowk, Volta Hotel, Sultan Shahi, Syed Ali Chabutra, Shamsheer Gunj, Moghalpura, Hari Bowli, Shah-Ali-Banda and ends at Falaknuma.[69][70] This stretch is scheduled to be completed by 2022.

  • Line 1 - Red Line - Miyapur – LB Nagar - 29 km (18 mi) 27 stations
  • Line 2 - Green Line - JBS - Falaknuma 15 km (9.3 mi) 15 stations
  • Line 3 - Blue Line - Nagole – Raidurg - 28 km (17 mi) 24 stations

Construction schedule

Stage Target Section Distance Line Line Colour Status Opened
Stage 1NagoleAmeerpet16.8 km (10.4 mi)Line IIIBlue Operational29 November 2017
Stage 1MiyapurAmeerpet11.3 km (7.0 mi)Line IRed Operational29 November 2017
Stage 2AmeerpetL B Nagar16.8 km (10.4 mi)Line IRed Operational24 September 2018
Stage 3/1AmeerpetHITEC City8.5 km (5.3 mi)Line IIIBlue Operational20 March 2019
Stage 3/2HITEC CityRaidurg1.5 km (0.93 mi)Line IIIBlue Operational29 November 2019[71]
Stage 4/1JBSMGBS11 km (6.8 mi)Line IIGreen Operational7 February 2020 [72]
Stage 4/2MGBSFalaknuma5.2 km (3.2 mi)Line IIGreen Yet to start ConstructionN/A
Total72 km (45 mi)

Note: Stage 4/2 MGBS - Falaknuma section (5.36 km) is also part of the initial phase - I, but has been rumored that the state government might take up this section instead of L&T, but will be completed along with the phase - I work. The Stage 3/2 Hitec City - Raidurg section (1.3 km) of Corridor III was not initial part of phase - I, it was later on added by the newly elected state government. This section is opened on 29 November 2019.

Phase II

The Government is planning second phase of metro rail extending further.[73] The construction of Phase II will be taken up solely by the state government, instead of Public Private Partnership (PPP) mode in Phase I.[74] Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II.[75] Metro Rail Phase II expansion plan is for about 62 km,[76] which includes providing link to Shamshabad RGI Airport.[77] In February 2020, Hyderabad Metro MD NVS Reddy said that three corridors are considered for phase 2. The DPR has been submitted to state government.[78][79] The proposed routes are as following:

Target Section Distance (in km) Line Line Colour Status
RaidurgGachibowli Shamshabad RGI Airport31 km (19 mi)Line IVTBADPR submitted
NagoleLB Nagar5 km (3.1 mi)Line III extensionBlueDPR submitted
Lakdi ka pulBHEL20 km (12 mi)Line VTBADPR submitted

Hyderabad Airport Metro Express

In August 2019, TRS Working President, Minister for Municipal Administration & Urban Development, Industries and IT&C K. T. Rama Rao said that the work on Hyderabad Metro Airport Express from Raheja Mindspace to Shamshabad RGI Airport will start soon.[80] The 31 km long Hyderabad Metro Airport Express link will cost around ₹ 5000 crore.[81] The 31-km Airport Express Metro Corridor is proposed to have 27-km elevated, 1 km on ground and a 2.5-km underground section to connect to the airport terminal.[82] The airport route will have 9 elevated stations and one underground station.[83]

# Station Name
1Bio-Diversity junction
2Nanakramguda
3Narsingi
4TS Police Academy
5Rajendranagar
6Shamshabad
7Airport Cargo station
8RGIA Terminal

Lines


Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color.[84] Ameerpet- LB Nagar metro stretch opened on 24 September 2018.[85] HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is opened on 29 November 2019,[86][87] as it involves construction of 49 pillars and the Raidurg terminal station.[88]

Red Line: Miyapur – L.B. Nagar

Route Length29.21 km (18.15 mi)
Number of Stations (All elevated) — 27
Link to other Corridors

# Station Name Connections
1MiyapurNone
2J.N.T.U CollegeNone
3K.P.H.B. ColonyNone
4KukatpallyNone
5BalanagarNone
6MoosapetNone
7BharatnagarNone
8ErragaddaNone
9ESI HospitalNone
10S.R NagarNone
11AmeerpetBlue Line
12PunjaguttaNone
13Errum ManzilNone
14KhairatabadNone
15Lakdi-ka-pulNone
16AssemblyNone
17NampallyNone
18Gandhi BhavanNone
19Osmania Medical CollegeNone
20M.G. Bus StationGreen Line
21MalakpetNone
22New MarketNone
23MusarambaghNone
24DilsukhnagarNone
25ChaitanyapuriNone
26Victoria MemorialNone
27L.B. NagarNone

Green Line: JBS – Falaknuma

Route Length15 km (9.3 mi)
Number of Stations (All elevated) — 16
Link to other Corridors

# Station Name Connections
1JBS Parade GroundNone
2Parade GroundBlue Line
3Secunderabad WestNone
4Gandhi HospitalNone
5MusheerabadNone
6R.T.C. Cross RoadsNone
7ChikkadpallyNone
8NarayangudaNone
9Sultan BazaarNone
10M.G. Bus StationRed Line
11Salarjung MuseumNone
12CharminarNone
13Shah-Ali-BandaNone
14ShamsherganjNone
15JungamettaNone
16FalaknumaNone

Blue Line: Nagole - Raidurg

Route Length27 km (17 mi)
Number of Stations (All elevated) — 23
Link to other Corridors

# Station Name Connections
1NagoleNone
2UppalNone
3StadiumNone
4NGRINone
5HabsigudaNone
6TarnakaNone
7MettugudaNone
8Secunderabad EastNone
9Parade GroundGreen Line
10ParadiseNone
11RasoolpuraNone
12Prakash NagarNone
13BegumpetNone
14AmeerpetRed Line
15Madhura NagarNone
16YousufgudaNone
17Jubilee Hills Road No. 5None
18Jubilee Hills Check PostNone
19Peddamma TempleNone
20MadhapurNone
21Durgam CheruvuNone
22Hitec CityNone
23RaidurgNone

Depots

Hyderabad Metro currently has 2 operational depots.[89] Miyapur and Uppal depot land is 100 acres each.[90][91] The proposed Falaknuma depot will be constructed in 17 acres.

Hyderabad Metro
Depots
Line No. Line Name Number of Depots Location Opening Date
1 Red Line 1
Miyapur Depot, Near Calvary Temple, Nadigada Tanda, Miyapur, Hyderabad, Telangana 28 November 2017
2 Blue Line 1 Uppal Metro Depot, Nagole Rd, Laxmi Narayan Nagar Colony, Uppal, Hyderabad, Telangana 28 November 2017
3 Green Line 1 Falaknuma TBD

Reception

JBS Parade ground metro station

The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1.[92] On the first Sunday of operations, the Metro was used by 240,000 people.[93] As of October 2019, the daily ridership is about 400,000. Although there was hiccups in the beginning of operations in 2017 with meager ridership of less than 100,000 per day, opening the new lines to LB Nagar and Hi-Tech city in 2018–19, ridership has surged and reached milestones from 2 to 4 lakhs in very short duration.

Trains are initially being operated at a frequency of 3 minutes in very peak hours and every 5 minutes in peak hours (between Miyapur-LB Nagar) and 4 minutes in peak hours (between Hi-Tec City/ Ameerpet-Nagole),[94] though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.[95]

In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari.[96][97] Hyderabad Metro timings are available on T-Savari app.[98] Ola Cabs and Uber tied up its services with app.[99]

Hyderabad Metro Rail crossed 100 million cumulative ridership milestone in just 671 days.

Cost

The initial official estimated cost of the 72 km long Metro project stood at 14,132 crore (US$2.0 billion). The State Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost.[100][101] The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to 15,957 crore (US$2.2 billion).[102] This has been further revised upwards to 18,800 crore (US$2.6 billion) (as of November 2017).[20]

Infrastructure

Hyderabad Metro Rail Bhavan

The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25 kV AC 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).[103] L&TMRHL built real- estate projects like Next Galleria malls in Panjagutta, Irrum Manzil, Hitech City and Musarambagh with skywalks,[104] for generating non-fare revenues under Transit Oriented Development (TOD).[15][105][106] In 2019, Hyderabad Metro started a semi-naming policy of metro stations, awarded through an open e-tendering process, to generate non-fare revenues.

CBTC Technology

At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales Group supplied its SelTrac Communications-based train control (CBTC) technology,[107] and trains initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).[108]

Hyderabad metro ticket online booking through MakeMyTrip and Goibibo.

Rolling stock

On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem.[109][110] The 18 billion (US$250 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage.[111][112] On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad.[113] The trains will be 3.2m wide and 4m high.[114] There will be 4 doors on each side of each coach.[114]

On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014.[115] On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.[116]

Ticketing and recharge

The L&T Hyderabad project has an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues.[117] Hyderabad Metro Rail smart card acts as a virtual wallet that facilitates seamless travel. A smart card can be purchased from a ticketing office at any Hyderabad Metro station or through TSavaari App. A smart card can be recharged for a minimum amount of 50 and maximum amount of 3000. The smart card can be recharged through TSavaari App, HMR Passenger website (www.ltmetro.com), or Paytm App. There is 10% discount on all trips made through smart card.[118] In December 2019, Hyderabad Metro started cashless QR (Quick Response) code payment option for e-tickets through MakeMyTrip and Goibibo.[119][120]

Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.[117][121] Official Ticket prices were announced on 25 November 2017. The base fare is 10 for up to 2 km.

Hyderabad metro nebula smart card
Slab Distance (km) Metro Fare ()
1 0 - 2 10
2 2 - 4 15
3 4 - 6 25
4 6 - 8 30
5 8 - 10 35
6 10 - 14 40
7 14 - 18 45
8 18 - 22 50
9 22 - 26 55
10 > 26 60

See also

References

  1. "Stations | Hyderabad Metro | L&T India". ltmetro.in.
  2. "Metro rail gets closer to 5-lakh ridership mark". The Hindu. 11 February 2020. Retrieved 11 February 2020.
  3. "N. V. S. REDDY | Hyderabad Metro | L&T India". ltmetro.in.
  4. "Hyderabad Metro rail flagged off today: See fares, timings, routes and other features". The Indian Express. 28 November 2017. Retrieved 28 November 2017.
  5. "Project Description". Archived from the original on 11 June 2012. Retrieved 19 June 2012.
  6. Geetanathhyderabad, V. (11 January 2020). "Course corrections put metro rail on track" via www.thehindu.com.
  7. "Jubilee Hills Check Post metro station opening today". 18 May 2019 via www.thehindu.com.
  8. "Tryst with Metro history as 2nd longest corridor opens | Hyderabad News - Times of India". The Times of India.
  9. "Skywalks to connect Metro with schools & malls: NVS Reddy | Hyderabad News - Times of India". The Times of India.
  10. Sood, Jyotika (26 July 2017). "How metro rail networks are spreading across India". Livemint.
  11. "EPC vs PPP in metro rail". Projectsmonitor.com. 2 December 2007. Archived from the original on 2 December 2007. Retrieved 18 April 2013.
  12. "The Next Station Is... | Outlook India Magazine". outlookindia.com/.
  13. Kumar, V. Rishi. "Eyeing non-fare revenues, L&T Metro Hyderabad takes up transit oriented development". @businessline.
  14. Bureau, Our. "N.V.S. Reddy to be AP Govt nominee on L&T Metro Rail board". @businessline.
  15. "Hyderabad metro on tricky track, running on losses | Hyderabad News - Times of India". The Times of India.
  16. "Hyderabad Metro: PM Modi inaugurates Hyderabad Metro Rail | Hyderabad News - Times of India". The Times of India.
  17. "PM Narendra Modi flags off Hyderabad Metro". Archived from the original on 12 June 2018. Retrieved 31 December 2017.
  18. "Metro: SR Nagar-Mettuguda was missing link in 30-km Metro rail corridor | Hyderabad News - Times of India". The Times of India.
  19. "Metro Rail to get lease of life in November | Hyderabad News - Times of India". The Times of India.
  20. "Hyderabad Metro project delay by L&T pushes up cost by over 30 per cent". India Today. 26 November 2017.
  21. ""Ladies only" coach in Hyderabad metro rail". Deccan Chronicle. 6 May 2018. Retrieved 10 June 2018.
  22. "Rolling Stock | Hyderabad Metro | L&T India". www.ltmetro.in. Retrieved 4 October 2020.
  23. Correspondent, Our Special (27 October 2003). "Nod for metro rail project in hyderabad CM Chandrababu Naidu". The Hindu. ISSN 0971-751X. Retrieved 28 February 2020.
  24. Network, BD News (17 August 2018). "Vajpayee-era a great chapter, recalls Chandrababu Naidu". Bengal Daily. Retrieved 28 February 2020.
  25. "Advani flags off first MMTS train". The Hindu. Hyderabad. 10 August 2003. Retrieved 18 April 2015.
  26. "Advani flags off Hyderabad MMTS". The Times of India. 9 August 2003. Retrieved 29 February 2020.
  27. "Rs 4,500-crore MMTS project report under way". Business Standard. Hyderabad. 15 February 2004. Retrieved 18 May 2015.
  28. Sharma, Swati (20 August 2016). "Hum Tum: Bonding over work". Deccan Chronicle.
  29. "Centre approves Hyderabad Metro Rail Project". 3 May 2007 via The Economic Times.
  30. Garari, Kaniza (15 June 2014). "Hyderabad Metro runs into hard rocks". Deccan Chronicle.
  31. "Maytas-Nava consortium wins bid for Hyderabad Metro Rail". The Financial Express. 29 July 2008.
  32. "2010 concessionaire agreement between L&T and AP Govt" (PDF).
  33. "Niz is Hyderabad Metro Rail's mascot". The Hindu. 12 September 2014. Retrieved 3 October 2016.
  34. "TheHindu.com Metro in best 100 global projects". www.thehindubusinessline.com.
  35. "DeccanChronicle.com metro-among-100-global-projects". metro-among-100-global-projects. Archived from the original on 17 December 2012.
  36. "L&T Metro Rail Hyd bags SAP award". 10 December 2015. Retrieved 29 November 2017 via www.thehindu.com.
  37. "Metro stations get Green Platinum Award". 1 November 2018 via www.thehindu.com.
  38. "Hyderabad Metro Rail gets 'Best Urban Mass Transit Project' award". United News of India. 5 November 2018. Retrieved 11 January 2019.
  39. "L&T performs Bhoomi Puja for Hyderabad metro". The Hindu. 26 April 2012.
  40. "L&T metro rail schedule on track". The Hindu. Chennai, India. 7 June 2012.
  41. "Metro Rail works picking up speed". The Deccan Chronicle. 31 August 2011. Archived from the original on 12 October 2012. Retrieved 31 August 2011.
  42. "Old City: Monument law amendment buoys Metro dream in Old City, but political will needed | Hyderabad News - Times of India". The Times of India.
  43. "Hyderabad Metro Rail phase-I to be completed by 2014". NDTV.com. 21 January 2013. Retrieved 18 April 2013.
  44. Our Bureau. "Hyderabad Metro rail stage I to be flagged off by June 2014 - Business Line". Thehindubusinessline.com. Retrieved 18 April 2013.
  45. Kumar, V. Rishi (20 November 2013). "L&T Hyderabad Metro begins laying of rails". Retrieved 29 November 2017.
  46. Kumar, V.Rishi (7 November 2013). "L&T Hyderabad Metro phase I to be ready by March 2015". Retrieved 29 November 2017.
  47. "CMRS completes 1 day inspection for Hyderabad Metro Stage-II, Miyapur to S.R. Nagar". metrorailnews.info. Archived from the original on 15 September 2016.
  48. "Hyderabad Metro ROB placed at Oliphant Bridge". telanganatoday.com.
  49. "Metro steel bridge crosses Oliphenta railway bridge". thehindu.com.
  50. Kumar, V. Rishi. "L&T Hyderabad Metro Rail gets safety approval". @businessline.
  51. "Hyderabad Metro chugs on Ameerpet-LB Nagar route".
  52. Geetanath, V. (20 August 2019). "Hyderabad Metro to run trains to HiTec City at 3 minute frequency" via www.thehindu.com.
  53. "Metro rail's last pier built after seven years of work". 19 May 2019 via www.thehindu.com.
  54. "'2599 metro pillars erected in 2599 days': Work on 66-km stretch of Hyd metro finished".
  55. "Hyderabad Metro: JBS-MGBS Green Line Gets CMRS Approval". railpost.in.com.
  56. "Hyderabad Metro to get service lanes". 22 May 2015. Retrieved 29 November 2017.
  57. "No Language Wars Here, Hyderabad Metro to Use 4 Languages". News18.
  58. Bureau, Our (14 April 2011). "Fare structure for Hyderabad metro notified". Retrieved 29 November 2017.
  59. "Hyderabad Metro stations to have electric vehicle charging points". The Economic Times. 19 May 2018. Retrieved 20 May 2018.
  60. Ghanate, Naveena (25 October 2018). "Hyderabad Metro stations do not reflect exact locations". Deccan Chronicle.
  61. "Watch videos with free Wi-Fi at Hyderabad metro". Deccan Chronicle. 11 October 2018.
  62. "Hyderabad metro rail celebrates its first anniversary | Hyderabad Traffic".
  63. "Metro connectivity to airport may take three more years, says L&T official | Hyderabad News - Times of India". The Times of India.
  64. "200km of metro rail planned for Hyderabad: KT Rama Rao | Hyderabad News - Times of India". The Times of India.
  65. "All metro corridors to terminate at Shamshabad". 7 April 2019 via www.thehindu.com.
  66. Kumar, V. Rishi. "Metro link work on IT Hub to Hyderabad airport will begin soon, says KT Rama Rao". @businessline.
  67. "PROJECT DESCRIPTION - Hyderabad Metro Rail". hmrl.telangana.gov.in.
  68. "Metro rail line to Raidurg another two years away". The Hindu. Retrieved 29 November 2017.
  69. "Work in Old City to start in '19, will take three years | Hyderabad News - Times of India". The Times of India.
  70. "After much delay work to begin".
  71. Mayabrahma, Roja (22 November 2019). "Hyderabad metro operations to be extended to Mindspace on Nov 29". thehansindia.com.
  72. "K Chandrasekhar Rao: Telangana CM to inaugurate 11-km stretch of Hyderabad Metro on February 7 | Hyderabad News - Times of India". The Times of India.
  73. "State to seek Japanese help for Phase II works of Metro Rail Project". 9 August 2017. Retrieved 9 August 2017.
  74. "Hyderabad Metro: Metro corridors to crisscross Hyderabad for airport link | Hyderabad News - Times of India". The Times of India.
  75. "raidurg: SPV formed to extend Metro from Raidurg to Hyderabad airport | Hyderabad News - Times of India". The Times of India.
  76. Kumar, V. Rishi. "L&T secures extension of repayment deadline from lenders for Hyderabad metro project". @businessline.
  77. Geetanath, V. (27 January 2018). "Metro line to RGIA under study" via www.thehindu.com.
  78. "Hyderabad Metro News: Three new corridors in phase 2 of Hyderabad Metro | Hyderabad News - Times of India". The Times of India.
  79. "'Hyderabad Metro was not given extra land, fares are bare minimum'". 27 February 2020 via www.thehindu.com.
  80. "Work on Airport Express metro to begin soon: KTR | Hyderabad News - Times of India". The Times of India.
  81. "Hyderabad: Airport Metro line to cost Rs 5,000 crore". The New Indian Express.
  82. "Hyderabad: Metro's airport service to have underground stretch | Hyderabad News - Times of India". The Times of India.
  83. Geetanath, V. (2 September 2019). "Airport Metro to have underground section connecting to passenger terminal" via www.thehindu.com.
  84. "Archived copy". Archived from the original on 11 January 2014. Retrieved 18 August 2013.CS1 maint: archived copy as title (link)
  85. "Telangana Governor To Flag Off New Metro Line On September 24". NDTV.com.
  86. "Metro extension to Raidurg by July-end | Hyderabad News - Times of India". The Times of India.
  87. Geetanath, V. (21 May 2019). "Metro 'Blue Line' likely by July" via www.thehindu.com.
  88. Geetanath, V. (30 October 2018). "Metro may go the extra mile soon" via www.thehindu.com.
  89. "Depots | Hyderabad Metro | L&T India". ltmetro.in.
  90. "Depot lands continue to dog metro rail project". 23 December 2011 via www.thehindu.com.
  91. "Marsh land transformed into state-of-the-art Uppal depot | Hyderabad News - Times of India". The Times of India.
  92. "Over 2 lakh passengers travel by Hyderabad metro rail on day 1". The Indian Express. 30 October 2017. Retrieved 30 November 2017.
  93. "Record 2.4 lakh commuters travel by Hyderabad Metro on Sunday". Zee Business. 4 December 2017.
  94. "Metro: Mania peaks: 2.1 lakh riders send Metro in tizzy | Hyderabad News - Times of India". The Times of India.
  95. Geetanath, V. (9 September 2017). "Full metro service from launch day" via www.thehindu.com.
  96. Geetanath, V. (25 November 2017). "'TSavaari' app for Hyderabad metro rail passengers" via www.thehindu.com.
  97. "Hyderabad Metro Rail app update includes latest timings". Deccan Chronicle. 29 September 2018.
  98. Ghanate, Naveena (15 January 2018). "Hyderabad Metro timings available on T-Savari app, L&T website". Deccan Chronicle.
  99. "Ola integrates services with Hyderabad Metro Rail's TSavaari app". 13 December 2017 via The Economic Times.
  100. "Hyderabad Metro Rail Project will be completed by 2017: Andhra Pradesh government". NDTV.com. 8 August 2012. Retrieved 18 April 2013.
  101. "Hyd Metro Rail Project will be completed on schedule: AP govt, IBN Live News". Ibnlive.in.com. 8 August 2012. Retrieved 18 April 2013.
  102. "Metro rail cost overshoots estimates". The Times Of India. 8 March 2012.
  103. Ghanate, Naveena (12 October 2018). "Hyderabad: Women safety is key objective for metro". Deccan Chronicle.
  104. "Hyderabad metro news: Swanky malls to help L&T mop up revenue | Hyderabad News - Times of India". The Times of India.
  105. Geetanath, V. (18 September 2018). "L&TMRH to open two more malls" via www.thehindu.com.
  106. "L&T plans 3 malls-cum-multiplexes along metro rail corridors in Hyderabad | Hyderabad News - Times of India". The Times of India.
  107. Geetanathhyderabad, V. (13 June 2019). "Metro glitches may lead to CBTC tweak" via www.thehindu.com.
  108. "L&T Hyderabad Metro awards contracts to Thales". thehindubusinessline.com. 16 November 2012. Retrieved 28 November 2017.
  109. "L&T Metro Rail grants Rs 1,800 cr contract to Hyundai Rotem". Zeenews.india.com. Retrieved 18 April 2013.
  110. "City metro rail to run on Korean wheels | Deccan Chronicle". 11 September 2012. Archived from the original on 11 September 2012.
  111. "Hyundai Rotem cars to run on metro tracks". The Times Of India. 12 September 2012. Retrieved 15 September 2012.
  112. "L&T awards rolling stock contract to Hyundai Rotem". Ibnlive.in.com. 14 September 2012. Retrieved 18 April 2013.
  113. "Larsen and Tourbo Hyderabad Metro unveils train car". Retrieved 29 November 2017.
  114. "Archived copy". Archived from the original on 20 August 2013. Retrieved 23 October 2013.CS1 maint: archived copy as title (link)
  115. "First train for Hyderabad Metro rolls out of Korean factory". IANS. news.biharprabha.com. Retrieved 10 April 2014.
  116. "Metro rail goes on first automatic trial run". 31 December 2014. Retrieved 29 November 2017 via www.thehindu.com.
  117. Our Bureau (18 February 2013). "Samsung bags fare collection system contract for Hyderabad Metro | Business Line". Thehindubusinessline.com. Retrieved 28 September 2013.
  118. "10% off on metro rail smart cards". 7 December 2017 via www.thehindu.com.
  119. Kumar, V. Rishi. "MakeMyTrip, Hyderabad Metro launch QR-code based e-tickets for easy mobility". @businessline.
  120. Gandhi, Forum. "MakeMyTrip deploys AI to make bookings easier". @businessline.
  121. Udgirkar, Trushna. "Hyderabad Metro in ticketing deal with Samsung". mydigitalfc.com. Retrieved 28 September 2013.
  122. "Nani- Akkineni Nagarjuna starrer is the first film to be shot in Hyderabad Metro". Hindustan Times. 28 March 2018.
  123. "Nagarjuna-Nani starrer becomes first film to shoot in Hyd metro".
  124. "Watch: Pawan Kalyan's 'Vakeel Saab' teaser shows glimpses of courtroom drama".
  125. "Pawan Kalyan travels in Hyderabad Metro for Vakeel Saab shoot. Trending pics and videos".

Sources

  • The Hindu Business Line, Hyderabad 23 January 2018
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.