Line 2 of the Changchun Subway (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun. It started operation on 30 August 2018. This line is 20.5 km long with 18 stations.[1]
Line 2 | |
---|---|
2 | |
Dongfang Square Station | |
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | Shuangfeng Dongfang Square |
Stations | 18 |
Service | |
Type | Rapid transit |
System | Changchun Subway |
Services | 1 |
Operator(s) | Changchun Rail Transit Corporation |
History | |
Opened | 30 August 2018 |
Technical | |
Line length | 20.5 km (12.74 mi)[1] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Shuangfeng — Dongfang Square | 30 August 2018 | 20.5 km (12.74 mi)[1] | 18 | Phase 1 |
Service routes
- Shuangfeng — Dongfang Square
Stations
Station name | Connections | Distance km |
Location | ||||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
Qiche Park | 汽车公园 | Luyuan | |||||
Jieda Avenue | 捷达大路 | ||||||
West Lake | 西湖 | 0.00 | 0.00 | ||||
Shuangfeng | 双丰 | 2.18 | 2.18 | ||||
Changchun West Railway Station | 长春西站 | CJ ~ JH Trams 55 CRT | 1.52 | 3.70 | |||
Xinglongpu | 兴隆堡 | 2.09 | 5.79 | ||||
West Ring Road | 西环城路 | 1.41 | 7.20 | ||||
Heping Street | 和平大街 | 1.14 | 8.34 | ||||
Wanfu Street | 万福街 | Trams 54 | 0.82 | 9.16 | |||
Jingyang Square | 景阳广场 | 0.86 | 10.02 | ||||
Jiefang Overpass | 解放桥 | 3 [lower-alpha 1] | 1.07 | 11.09 | Luyuan / Chaoyang | ||
Jianshe Square | 建设广场 | 0.80 | 11.89 | Chaoyang | |||
Wenhua Square | 文化广场 | 0.75 | 12.64 | ||||
Jiefang Avenue | 解放大路 | 1 | 1.36 | 14.00 | Chaoyang / Nanguan | ||
Pingyang Street | 平阳街 | 0.78 | 14.78 | Nanguan | |||
Nanguan | 南关 | 1.12 | 15.90 | ||||
Jilin Avenue | 吉林大路 | 4 | 1.31 | 17.21 | Erdao | ||
Dongsheng Street | 东盛大街 | 0.99 | 18.20 | ||||
East Ring Road | 东环城路 | 1.46 | 19.66 | ||||
Changqing | 长青 | 1.27 | 20.93 | Erdao / Nanguan | |||
Dongfang Square | 东方广场 | 1.38 | 22.31 | Erdao | |||
- Out-of-system transfer before May 30, 2020.
Future Development
- Western extension
A western extension to Qiche Park is under construction. The extension is 4.362 km in length.[2] It is scheduled to open in September 2021.[3]
- Eastern extension
An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.[4]
References
- "长春地铁进入换乘时代 2号线8月30日通车". 2018-08-30.
- "轻轨到地铁 看长春轨道交通发展". 2019-06-30.
- "地铁2号线向西延伸两站预计2021年实现试运营". 2018-03-31.
- "长春地铁2号线东延工程项目正式开工". 2019-11-27.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.