Line 4 (Changchun Subway)
Line 4 of the Changchun Subway (Chinese: 长春轨道交通4号线; pinyin: Chángchūn Guǐdào Jiāotōng Sì Hào Xiàn) is a light metro line running from north to south Changchun. It was opened on 30 June 2011. It is currently 16.33 km long with 15 stations.[1][2] Although it uses extended low floor LRVs, the line operates more like a metro, being entirely separate from traffic.[3] This is similar to U6 of the Vienna U-Bahn.
Line 4 | |
---|---|
4 | |
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | Changchun Railway Station (North) Tiangong Road |
Service | |
Type | Rapid transit |
System | Changchun Subway |
Services | 1 |
Operator(s) | Changchun Rail Transit Corporation |
History | |
Opened | 30 June 2011 |
Technical | |
Line length | 16.33 km (10.15 mi)[1] |
Number of tracks | 2 |
Character | elevated and underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Dongdaqiao Bridge — Tiangong Road | 30 June 2011 | 13.0 km (8.08 mi) | 11 | (initial phase) |
Changchun Railway Station (North) — Dongdaqiao Bridge | 7 May 2012 | 3.3 km (2.05 mi) | 3 | Northern extension |
Gongping Road | 17 December 2012 | Infill station | 1 |
Stations
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Changchun Railway Station (North) | 长春站北 | CJ ~ JH CB ~ BA CCT 1 |
0.00 | 0.00 | Kuancheng |
Beiyatai Street | 北亚泰大街 | 1.25 | 1.25 | ||
Puppet Regime Palace Museum | 伪满皇宫 | 1.60 | 2.85 | ||
Dongdaqiao Bridge | 东大桥 | 0.60 | 3.45 | Nanguan | |
Dongxin Road | 东新路 | 1.25 | 4.70 | Erdao | |
Jilin Avenue | 吉林大路 | 2 | 1.25 | 5.95 | |
Gongping Road | 公平路 | 1.00 | 6.95 | ||
Haikou Road | 海口路 | 0.95 | 7.90 | ||
Pudong Road | 浦东路 | 0.75 | 8.65 | ||
Weihai Road | 威海路 | 0.70 | 9.35 | ||
Beihai Road | 北海路 | 0.95 | 10.30 | ||
Vocational Institute of Technology | 职业学院 | 3 | 1.05 | 11.35 | |
Shirong Road | 世荣路 | 0.80 | 12.15 | Nanguan | |
South Ring Road | 南环城路 | 0.90 | 13.05 | ||
Yisheng Street | 宜盛街 | 1.15 | 14.20 | ||
Tiangong Road | 天工路 | 1.30 | 15.50 | ||
See also
References
- "轻轨4号线3日起试运营 全程16.33公里". 2013-02-05.
- "长春轻轨4号线 9月末或10月初开始售票运行". 中国吉林网. Archived from the original on 2012-12-26. Retrieved 2012-10-04.
- Moore, Craig (September 2017). "Urban Rail in Changchun" (PDF). Urban Rail.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.