Line 3 (Changchun Subway)
Line 3 of the Changchun Rail Transit network (Chinese: 长春轨道交通3号线; pinyin: Chángchūn Guǐdào Jiāotōng Sān Hào Xiàn) is a light rail line running from northwest to southeast Changchun. It was opened on 30 October 2002. Line 3 was later extended on 26 December 2006. This line is currently 31.9 km long with 33 stations.[1] Line 3 is currently upgrading sections of the line into a light metro line.
Line 3 | |
---|---|
3 | |
Overview | |
Status | Operational |
Owner | Changchun |
Locale | Changchun, Jilin, China |
Termini | Changchun Railway Station Changchun Movie Wonderland |
Stations | 33 |
Service | |
Type | Light Rail |
System | Changchun Subway |
Services | 2 |
Operator(s) | Changchun Rail Transit Corporation |
History | |
Opened | 30 October 2002 |
Technical | |
Line length | 31.9 km (19.82 mi) |
Number of tracks | 2 |
Character | At-grade and elevated |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Changchun Railway Station — Weiguang Street | 30 October 2002 | 14.9 km (9.26 mi) | 17 | Phase 1 |
Weiguang Street — Changchun Movie Wonderland | 26 December 2006 | 17.0 km (10.56 mi) | 16 | phase 2 |
Service routes
- Changchun Railway Station — Changchun Movie Wonderland
- Changchun Railway Station — Shiji Square
Stations
Service routes |
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
● | ● | Changchun Railway Station | 长春站 | CJ ~ JH CB ~ BA CCT 1 [lower-alpha 1] |
0.00 | 0.00 | Kuancheng |
at-grade crossing | |||||||
● | ● | Liaoning Road | 辽宁路 | 0.55 | 0.55 | ||
❘ | ❘ | Furong Bridge (Closed) | 芙蓉桥 | 1.20 | 1.75 | ||
● | ● | Xi'an Bridge | 西安桥 | 0.80 | 2.55 | Luyuan / Chaoyang | |
● | ● | Nanchang Road | 南昌路 | 0.65 | 3.20 | ||
● | ● | Chaoyang Bridge | 朝阳桥 | 0.65 | 3.85 | ||
● | ● | Jiefang Overpass | 解放桥 | 2 [lower-alpha 2] | 1.00 | 4.85 | |
● | ● | Huxi Bridge | 湖西桥 | 0.90 | 5.75 | ||
● | ● | Kuanping Bridge | 宽平桥 | Trams 54 and 55 | 0.95 | 6.70 | |
● | ● | Fusong Road | 抚松路 | 1.05 | 7.75 | ||
● | ● | Mengjiatun | 孟家屯 | CET | 0.60 | 8.35 | Chaoyang |
at-grade crossing | |||||||
● | ● | Huguang Road | 湖光路 | 0.85 | 9.20 | ||
● | ● | Diantai Street | 电台街 | 1.60 | 10.80 | ||
● | ● | Qianjinxi | 前进西 | 0.70 | 11.50 | ||
● | ● | Qianjin Street | 前进大街 | 0.50 | 12.00 | ||
at-grade crossing | |||||||
● | ● | Weiming Street | 卫明街 | 0.75 | 12.75 | ||
at-grade crossing | |||||||
● | ● | Weiguang Street | 卫光街 | 1.05 | 13.80 | ||
at-grade crossing | |||||||
● | ● | Weixing Square | 卫星广场 | 1 | 0.65 | 14.45 | Chaoyang / Nanguan |
● | ● | Yatai Overpass | 亚泰立交桥 | 1.25 | 15.70 | Nanguan | |
● | ● | Yitong River | 伊通河 | 0.85 | 16.55 | ||
● | ● | Vocational Institute of Technology | 职业学院 | 4 | 1.35 | 17.90 | Erdao |
● | ● | Jilin TV & Radio Center | 吉林广电 | 1.05 | 18.95 | ||
● | ● | Conference & Exhibition Center | 会展中心 | 0.90 | 19.85 | ||
● | ● | Shiji Square | 世纪广场 | 1.10 | 20.95 | ||
● | Jinxin Street | 金鑫街 | 1.55 | 22.50 | Nanguan | ||
● | Boshuo Road | 博硕路 | 0.85 | 23.35 | |||
● | Jinhe Street | 金河街 | 1.20 | 24.55 | |||
● | Agricultural Expo Garden | 农博园 | 0.95 | 25.50 | |||
● | Jingyuetan National Park | 净月潭公园 | 1.30 | 26.80 | |||
● | Zishan Road | 紫杉路 | 1.50 | 28.30 | |||
● | Baoxiang Street | 宝相街 | 1.00 | 29.30 | |||
● | Ski Resort | 滑雪场 | 1.25 | 30.55 | |||
at-grade crossing | |||||||
● | Changchun Movie Wonderland | 长影世纪城 | 0.55 | 31.10 | |||
See also
Notes
- Out of station transfer.
- Out of station transfer before May 30, 2020.
References
- "12月26日长春轻轨二期将运行 可能采用阶梯票价". 搜狐. Retrieved 2012-10-04.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.