Line 5 (Mumbai Metro)

Orange Line 5 of the Mumbai Metro, or the Thane-Bhiwandi-Kalyan Line, is part of the metro system for the city of Mumbai, India. This line is fully elevated.

Mumbai Metro Orange Line 5
Overview
StatusUnder Construction
OwnerMumbai Metropolitan Region Development Authority (MMRDA)
LocaleThane, Mumbai, Maharashtra, India
TerminiThane
Stations17
WebsiteLine 5
Service
TypeMetro
SystemMumbai Metro
History
Commenced18 October 2019 (2019-10-18)
Planned opening2022 (2022)
Technical
Line length24.9 km (15.5 mi)
CharacterElevated
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Route map

Line 5
to Line 12
towards CSMT
Kalyan APMC Depot
0.0000
Kalyan APMC
0.7000
Kalyan Railway Station on Central line
towards Khopoli and towards Kasara
1.4640
Sahajanand Chowk
2.0980
Durgadi Fort
Ulhas River
3.8940
Kongaon
Kongaon MIDC Depot
6.1950
Govegaon MIDC
7.1980
Rajnouli Village
8.9840
Temghar
10.7640
Gopal Nagar
11.4850
Bhiwandi
12.4020
Dhamankar Naka
14.2420
Anjur Phata
Vasai Road–Roha line
15.7190
Purna
17.7960
Kalher
19.2370
Kasheli
Vasai Creek
22.9100
Balkum Naka
23.7860
Kapurbawdi (Thane)
on Line 4

The 24.9 km-long Thane-Bhiwandi-Kalyan Metro-V corridor will have 17 stations and will cost Rs. 8,416 crore. It will be totally an elevated corridor. It will connect Thane to Bhiwandi and Kalyan in the eastern suburbs. The stations include Kapurbawdi in Thane (West), Balkum Naka, Kasheli, Kalher, Purna, Anjur Phata, Dhamankar Naka, Bhiwandi, Gopal Nagar, Temghar, Rajnouli Village, Govegaon MIDC, Kongaon, Durgadi Fort, Sahajanand Chowk,Kalyan Railway Station. The line was approved by the Maharashtra Cabinet on 24 October 2017.[1]

The MMRDA began carrying out survey work for the line by December 2017.[2] Survey work was interrupted due to protests by some shopkeepers and residents of Bhiwandi.[3]

Stations

There will be 17 stations on Line 5.

Orange Line 5
# Station Name Status Connections Layout
EnglishMarathi
1KapurbawdiकापूरबावडीUnder Construction Green Line 4  (Under Construction)Elevated
2Balkum Nakaबाळकुम नाकाUnder ConstructionNoneElevated
3KasheliकशेळीUnder ConstructionNoneElevated
4Kalherकाल्हेरUnder ConstructionNoneElevated
5Purnaपूर्णाUnder ConstructionNoneElevated
6Anjur Phataअंजूर फाटाUnder ConstructionIndian RailwaysElevated
7Dhamankar Nakaधामणकर नाकाUnder ConstructionNoneElevated
8BhiwandiभिवंडीUnder ConstructionNoneElevated
9Gopal Nagarगोपाल नगरUnder ConstructionNoneElevated
10TemgharटेमघरUnder ConstructionNoneElevated
11Rajnouli Villageराजनौली गावUnder ConstructionNoneElevated
12Govegaon MIDCगोवेगाव एमआयडीसीUnder ConstructionNoneElevated
13KongaonकोणगावUnder ConstructionNoneElevated
14Durgadi Fortदुर्गाडी किल्लाUnder ConstructionNoneElevated
15Sahajanand Chowkसहजानंद चौकUnder ConstructionNoneElevated
16Kalyan Railway Stationकल्याण रेल्वे स्थानकUnder ConstructionCentral line, Indian RailwaysElevated
17Kalyan APMCकल्याण एपीएमसीUnder Construction Orange Line 12  (Proposed)Elevated

References

  1. "Mumbai Metro's corridor 5 and 6 gets Maharashtra cabinet approval". Livemint. 24 October 2017. Retrieved 9 October 2018.
  2. "Mumbai Metro-5 to move through crowded areas of Thane". The Asian Age. 28 December 2017. Retrieved 9 October 2018.
  3. "Bhiwandi residents oppose Metro 5". The Asian Age. 1 August 2018. Retrieved 9 October 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.