The Pazhassi Dam also called Kulur Barrage is a stone masonry diversion structure in Kannur district, Kerala, India. It is named after king Pazhassi Raja, a patriot who died a heroic death in the war. The dam is constructed across the west flowing Valapattanam River near VELIYAMBRA. It was commissioned by Prime Minister Morarji Desai in 1979. It mainly functions as an irrigation dam, serving a command area of 11,525 hectares (28,480 acres) in Thalassery and Thaliparambra taluks of the Kannur District. The water from this dam also meets the drinking water requirement of Kannur district. The dam site and the reservoir are famous for their scenic beauty.[1][2][3][4]

Pazhassi Dam
Kuyilur Barrage
Location of Pazhassi Dam
Kuyilur Barrage in India
Pazhassi Dam (Kerala)
Pazhassi Dam (Karnataka)
LocationKannur District, Kerala, India
Coordinates11°58′42″N 75°36′43″E
PurposeIrrigation and drinking water supply
StatusOperational
Opening date1979
Dam and spillways
Height18.99 metres (62.3 ft)
Length245 metres (804 ft)
Spillways16
Spillway typeRadial gates
Spillway capacity3,510 cubic metres (124,000 cu ft) per second
Reservoir
Total capacity97,500,000 m3 (79,045 acre⋅ft)
Active capacity97,500,000 m3 (79,045 acre⋅ft)
Surface area6.5 km2 (3 sq mi)
Normal elevation26.52 metres (87.0 ft)

Topography

The dam is built at Kuyiloor across the Valapattanam River, in the basin of the West flowing rivers from Tadri to Kanyakumari. It rises in the Coorg (in Karnataka) at 2,500 feet (760 m) and drains a catchment area of 1,028 square kilometres (397 sq mi). The mean annual rainfall in the catchment is 3,622 millimetres (142.6 in). The nearest towns to the dam site are Mattanur and Iritty.[1][2]

Features

Pazhassi Dam and its 16 gates in operation

The diversion dam or barrage, built with stone masonry to function as a major irrigation project, is 18.99 metres (62.3 ft) in height and has a length of 245 metres (804 ft). At the Full Reservoir Level of 26.52 metres (87.0 ft), with a water spread area of 650 hectares (1,600 acres), the dam has a gross storage capacity of 97,500,000 m3 (79,045 acre⋅ft). The spillway designed to rout a design flood discharge of 3,510 cubic metres (124,000 cu ft) per second is fitted with 16 radial gates over a length of 138 metres (453 ft).[1][2][3]

While the dam was completed in 1978, its irrigation component was completed in 1979. The water stored in the reservoir is diverted for irrigation through a control structure on the left bank of the barrage to the main canal of 46.26 kilometres (28.74 mi) length, designed to carry a discharge of 20 cubic metres (710 cu ft) per second. The gross command area under the canal system is 23,650 hectares (58,400 acres) with a net command area of 11,525 hectares (28,480 acres) (as against the earlier planned figure of 16,110 hectares (39,800 acres)) to mainly raise three crops of paddy every year in the Iritty and Taliparamba taluks of Kannur district; other crops grown in the command are coconut, arecanut, cashew nut, tapioca, pepper, ginger, turmeric and vegetables. The network of canals includes six branch canals of 76.35 kilometres (47.44 mi) total length and 32 distributaries of 136.4 kilometres (84.8 mi) total length. The entire command is covered under the Command Area Development Programme (CADP) of the Ministry of Water Resources, Government of India and is being monitored since 2003.[1][2]

Failure of gates

On 7 August 2012, some of the gates of the barrage failed to open, causing the flood waters to overflow the barrage for 20 hours.[5] There was no damage to life or the dam structure, but minor property and crop loss occurred. The gates were repaired at a cost of Rs 70 million.[5]

Pazhassi Dam Gardens

See also

References

  1. "Pazhassi Irrigation Project JI02676". Central Water Commission. Archived from the original on 28 September 2013.
  2. "Pazhassi (Kulur Barrage) B00479". Central Water Commission.
  3. "National Register of Large Dams" (PDF). Central Water Commission. Archived from the original (pdf) on 19 February 2018. Retrieved 11 December 2012.
  4. "Pazhassi project gets a rusting place". New Indian Express. Retrieved 27 May 2015.
  5. "Pazhassi dam is now safe". The Hindu. 8 August 2012. Retrieved 27 May 2015.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.