Coastal Virginia Offshore Wind

The Coastal Virginia Offshore Wind (CVOW) is offshore wind energy project located about 43 km (27 mi) off the coast of Virginia Beach, Virginia, U.S. The initial phase, a two-turbine, 12-MW pilot project constructed in 2020, is the second utility scale offshore wind farm operating in the United States (after Block Island Wind Farm). Dominion Energy and Ørsted US Offshore Wind collaborated on the project, which is estimated to have cost $300 million and is expected to generate enough electricity to power up to 3,000 homes. It is the first utility scale wind farm serving Virginia and the first built in U.S. federal waters, in a wind lease area that covers about 2,135-acre (3.3-sq mi).[3]

Coastal Virginia Offshore Wind
CountryUnited States
LocationOCS-A 0497[1]
Outer Continental Shelf
Offshore Virginia
Coordinates36°53′30″N 75°29′30″W
Statuspilot
Owner(s)Dominion Energy
Wind farm
Typeoffshore
Distance from shore27 miles (43 km)
Power generation
Nameplate capacity12 MW[2]
External links
WebsiteDominion CVOW

Pilot project

The Virginia Offshore Wind Technology Advancement Project (VOWTAP) was a program to explore offshore wind farms in the Atlantic Ocean off the coast of Virginia.[4][5] Dominion Virginia Power was awarded $4 million in 2012 and $47 million in 2014 from the United States Department of Energy (DOE) to help fund the construction of a 12-megawatt demonstration project, consisting of two 6-megawatt offshore wind turbines.[6][7][8] It intended to have them in full operation in 2017, but the project was withdrawn from the DOE project since the single bid for construction was too high and other funding requirements were not met.[9] Some exploratory boring off the coast had taken place.[10]

The eventual pilot project was to built by Ørsted US Offshore Wind for Dominion Energy to explore potential for expansion of a wind farm off the coast with a potential of up to 2,000MW.[3][11][12] Construction began in May 2020.[13] Bluewater Wind handled port logistics for the projct.[14][15] Power from the turbines, built by Siemens Gamesa, is cabled to a substation near Camp Pendleton.[3]

Wind farm Offshore BOEM wind energy lease area States Coordinates Capacity
(MW)
Completion
year
Turbines Developer/Utility Regulatory agency Refs
Coastal Virginia Offshore Wind - Pilot ProjectOffshore Virginia
OCS-A 0497[1]
25 nautical miles east of Cape Henry (VA)2,135 acres (864 ha)VA36°53′30″N 75°29′30″W1220202 x 6MW
Siemens Gamesa SWT-6.0-154
Ørsted
Dominion Energy
Virginia Department of Mines Minerals and Energy (DMME)
BOEM
[3]

Proposed project

Wind farm Offshore BOEM wind energy lease area States Coordinates Capacity
(MW)
Completion year Turbines Developer/Utility Regulatory agency Refs
Coastal Virginia Offshore WindOffshore Virginia
OCS-A 0483[16]
25 to 35 nautical miles east of Cape Henry (VA)112,799 acres (45,648 ha)VA36.9°N 75.38°W / 36.9; -75.382,6402026TBADominion EnergyBOEM[17]

See also

References

  1. "Coastal Virginia Offshore Wind Project (CVOW) | Bureau of Ocean Energy Management". www.boem.gov.
  2. "Coastal Virginia Offshore Wind - CVOW - Fully Commissioned Offshore Wind Farm - United States; 4C Offshore". www.4coffshore.com.
  3. "Virginia's Offshore Wind Turbines Now Generating Power". Offshore Wind. September 29, 2020.
  4. "EA-1985: Virginia Offshore Wind Technology Advancement Project (VOWTAP), 24 nautical miles offshore of Virginia Beach, Virginia". Energy.gov.
  5. "Virginia Offshore Wind Technology Advancement Project". dom.com. Retrieved May 10, 2015.
  6. "Dominion Awarded $47 Million by DOE for Offshore Wind Turbine Demonstration Project". mediaroom.com. Retrieved 20 May 2015.
  7. Davidson, Ros. "VOWTAP shelved 'indefinitely'". www.windpowermonthly.com.
  8. "Dominion Virginia to be first U.S. utility in offshore wind". Utility Dive. 14 May 2014.
  9. "USA: 12MW VOWTAP to be delayed". windpowerintelligence.com. Retrieved May 10, 2015.
  10. "Dominion Virginia Power starting test borings for offshore wind energy project". Richmond.com.
  11. Geuss, Megan (13 July 2017). "Virginia utility agrees to install two offshore wind turbines for study". Ars Technica. Retrieved 13 July 2017.
  12. Vogelsong, Sarah. "Virginia's first offshore wind project gets underway". Retrieved Apr 20, 2020.
  13. "'Hats off to the team': steel in water at first US federal water wind farm | Recharge". Recharge news. 28 May 2020. Archived from the original on 7 June 2020.
  14. "Blue Water Handles Offshore Wind Turbines for Siemens Gamesa". June 11, 2020.
  15. "Blue Water wins four projects".
  16. "Commercial Lease for Wind Energy Offshore Virginia | Bureau of Ocean Energy Management". www.boem.gov.
  17. "Dominion Energy | Coastal Virginia Offshore Wind". coastalvawind.com.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.