This page lists the largest offshore wind farms that are currently operational rated by nameplate capacity. It also lists the largest offshore wind farms currently under construction, the largest proposed offshore wind farms, and offshore wind farms with notability other than size.

Four offshore wind farms are in the Thames Estuary area: Kentish Flats, Gunfleet Sands, Thanet and London Array. The latter was largest in the world.

As of January 2020 the Hornsea 1 in the United Kingdom is the largest offshore wind farm in the world at 1,218 MW.

Largest operational offshore wind farms

This is a list of offshore wind farms with at least 200 MW nameplate capacity that are currently operational.

Wind farm Location Site coordinates Capacity
(MW)
Turbines & model Commissioning
date
Refs
Hornsea 1  United Kingdom 53.885°N 1.791°E / 53.885; 1.791 (Hornsea 1) 1,218 174 x Siemens Gamesa SWT-7.0-154 2019 [1][2]
Borssele 1&2  Netherlands 752 94 x Siemens Gamesa 8MW 2020 [3][4]
Borssele 3&4  Netherlands 731.5 77 x MHI Vestas V164 9.5MW 2021 [5][6]
East Anglia ONE  United Kingdom 52°14′53.8573″N 2°30′23.4094″E 714 102 x Siemens Gamesa SWT-7.0-154 2020 [7][8]
Walney Extension United Kingdom54°5′17″N 3°44′17″W65940 x MHI-Vestas 8.25 MW
47 x Siemens Gamesa 7 MW
2018[9]
London Array United Kingdom51°38′38″N 01°33′13″E630175 × Siemens Gamesa SWT-3.6-1202013[10][11][12]
Gemini Wind Farm Netherlands54°2′10″N 05°57′47″E600150 × Siemens Gamesa SWT-4.02017[13][14][15][16]
Beatrice United Kingdom58°7′48″N 3°4′12″W58884 × Siemens Gamesa SWT-7.0-1542019[17]
Gode Wind (phases 1+2) Germany54°04′N 7°02′E58297 x Siemens Gamesa SWT-6.0-1542017[18][19]
Gwynt y Môr United Kingdom53°27′00″N 03°35′00″W576160 × Siemens Gamesa SWT-3.6-1072015[20]
Race Bank United Kingdom53°16′N 0°50′E57391 x Siemens Gamesa SWT-6.0-1542018[21][22]
Greater Gabbard United Kingdom51°52′48″N 1°56′24″E504140 × Siemens Gamesa SWT-3.6-1072012[23][24][25]
Hohe See  Germany 54°26′N 6°19′E 497 71 x Siemens Gamesa SWT-7.0-154 2019 [26]
Borkum Riffgrund 2  Germany 53°57′7″N 6°29′17″E 450 56 x MHI Vestas V164-8.0 MW 2019 [27]
Horns Rev 3 Denmark55°49′N 7°42′E40749 x MHI Vestas V164-8.3 MW2019[28]
Dudgeon United Kingdom53°14′56″N 1°23′24″E40267 × Siemens Gamesa SWT-6.0-1542017[29]
Veja Mate Germany54°19′1″N 5°52′15″E40267 × Siemens Gamesa SWT-6.0-1542017[30][31]
Anholt Denmark56°36′00″N 11°12′36″E400111 × Siemens Gamesa SWT-3.6-1202013[32][33][34][35]
BARD Offshore 1 Germany54°22′0″N 5°59′0″E40080 × BARD 5.0MW2013[36][37][38]
Global Tech I Germany54°30′00″N 6°21′30″E40080 × Areva Multibrid M5000 5.0MW2015[39]
Rampion United Kingdom50°40′N 0°06′W400116 x MHI Vestas V112-3.45 MW2018[40]
Binhai North H2 China34°30′00″N 120°20′00″E400100 x Siemens Gamesa SWT-4.0-1202018[41]
CGN Yangjiang Nanpeng Island  China 400 75 x Mingyang MY-5.5 MW 2020 [42][43]
Merkur  Germany 54°2′N 6°33′E 396 66 x GE Haliade 150-6 MW 2019 [44]
West of Duddon Sands United Kingdom53°59′02″N 3°27′50″W389108 × Siemens Gamesa SWT-3.6-1202014[45][46]
Arkona  Germany 54°46′55.200″N 14°7′15.600″E 385 60 x Siemens Gamesa SWT-6.0-154 2019 [47][48]
Norther Offshore Wind Farm  Belgium 51°31′40″N 3°1′55″E 370 44 × Vestas V164-8.4 MW 2019
Walney
(phases 1&2)
 United Kingdom54°02′38″N 3°31′19″W367102 × Siemens Gamesa SWT-3.6-1072011 (phase 1)
2012 (phase 2)
[49][50]
Galloper United Kingdom51°52′48″N 1°56′24″E35356 x Siemens Gamesa SWT-6.0-1542018[51][52]
Wikinger Germany54°50′2″N 14°4′5″E35070 × Adwen AD 5-1352018[53]
Nordsee One Germany53°58′0″N 06°48′00″E33254 × Senvion 6.2M1262017[54]
Thorntonbank
(phases 1–3)
 Belgium51°33′00″N 2°56′00″E3256 × Senvion 5MW
48 × Senvion 6.15MW
2009 (phase 1)
2012 (phase 2)
2013 (phase 3)
[55][56][57][58]
Sheringham Shoal United Kingdom53°7′0″N 1°8′0″E31588 × Siemens Gamesa SWT-3.6-1072012[59][60][61][62]
Borkum Riffgrund 1 Germany53°58′0″N 06°33′00″E31278 × Siemens Gamesa SWT-4.0-1202015[63]
Rentel  Belgium 51°35′27.6″N 2°56′38.4″E 308.7 42 x Siemens Gamesa SWT-7.0-154 2019 [64]
SPIC Jiangsu Dafeng  China 33.514°N 121.105°E / 33.514; 121.105 302.4 72 × Envision 4.2MW 2018 [65]
Dongtai Four  China 302.4 63 x Siemens Gamesa SWT-4.0-130

10 x Envision EN136/4.2 MW

2019 [66]
Amrumbank West Germany54°30′0″N 07°48′00″E30280 × Siemens Gamesa SWT-3.6-1202015[67][68]
Datang Jiangsu Binhai  China 34.259°N 120.576°E / 34.259; 120.576 (Datang Jiangsu Binhai) 301.8 50 x Mingyang MySE3.0-135

46 x Jinfeng 3.3 MW

2019 [69][70]
Thanet United Kingdom51°26′0″N 01°38′0″E300100 × Vestas V90-3.0MW2010[71][72]
Huaneng Rudong China32.680°N 121.323°E / 32.680; 121.323 (Huaneng Rudong)30038 x Siemens Gamesa 4.0MW

19 x Haizhuang 5MW (H154)

1 x Haizhuang 5MW (H171)

12 x Envision 4.2MW (EN-136)

2017[73]
Jiangsu Longyuan Chiang Sand  China 32.816°N 121.516°E / 32.816; 121.516 (Jiangsu Longyuan Chiang Sand) 300 75 x Envision EN136/4.0 MW 2018 [74]
Laoting Bodhi Island  China 38.986°N 118.804°E / 38.986; 118.804 (Laoting Bodhi Island) 300 75 x Siemens Gamesa SWT-4.0-130 2020 [75]
Nordsee Ost Germany54°26′00″N 7°41′00″E29548 × Senvion 6.15MW2015[76][77]
Butendiek Germany54°54′0″N 07°45′00″E28880 × Siemens Gamesa SWT-3.6-1202015[78][79]
DanTysk Germany55°9′00″N 7°10′30″E28880 × Siemens Gamesa SWT-3.6-1202015[80]
Baltic 2 Germany54°58′24″N 13°10′40″E28880 × Siemens Gamesa SWT-3.6-1202015[81][82]
Meerwind Süd / Ost Germany54°23′00″N 7°42′00″E28880 × Siemens Gamesa SWT-3.6-1202015[83]
Sandbank (Phase 1) Germany55°11′0″N 06°51′00″E28872 × Siemens Gamesa SWT-4.0-1302017[84][85]
Lincs United Kingdom53°11′00″N 00°29′00″E27075 × Siemens Gamesa SWT-3.6-1202013[86]
Burbo Bank Extension United Kingdom53°28′48″N 3°15′36″W25832 × Vestas V164-8.0MW2017[87]
Liuheng (Guodian Zhoushan Putuo) China25263 × Siemens Gamesa SWT-4.0-130 2019[88][89]
Humber Gateway United Kingdom53°38′38″N 0°17′35″E21973 × Vestas V112-3.0MW2015[90]
Northwind Belgium51°37′08″N 02°54′03″E21672 × Vestas V112-3.0MW2014[91]
Westermost Rough United Kingdom53°48′0″N 0°9′0″E210 35 × Siemens Gamesa SWT-6.0-1542015[92][93]
Horns Rev 2 Denmark55°36′00″N 7°35′24″E20991 × Siemens Gamesa SWT-2.3-932009[94]
Rødsand II Denmark54°33′0″N 11°42′36″E20790 × Siemens Gamesa SWT-2.3-932010[95][96]
Chenjiagang (Jiangsu) Xiangshui China34°29′00″N 119°52′00″E201134 × FD77-1500 Dongfang Electric2010[97][98]
Trianel Borkum West II (Phase 1) Germany54°2′30″N 6°28′0″E20040 × Areva Multibrid M5000 5.0MW2015[99]
Jiangsu Luneng Dongtai China32°55′16″N 121°10′55″E20050 × Siemens Gamesa SWT-4.0-1302017[100][101]

Largest under construction

This is a list of wind farms with a nameplate capacity of more than 300MW currently under construction.

Wind farm Location Site coordinates Capacity
(MW)
Turbines & model Completion Refs
Hornsea Project 2  United Kingdom 1,386 165 Siemens Gamesa 8MW SG 8.0-167 DD 2022-2023 [102]
Seagreen (Alpha & Bravo)  United Kingdom 1,075 114 x MHI Vestas V164-10 MW 2024 [103][104][105]
Moray East  United Kingdom 950 100 x MHI Vestas V164 9.5 MW 2021 [106][107]
Greater Changhua  Taiwan 900 111 x Siemens Gamesa 8MW-167 DD 2022 [108]
Triton Knoll  United Kingdom 855 90 x MHI Vestas 9.5 MW 2021[109] [110]
Kriegers Flak  Denmark 55°01′00″N 12°56′00″E 605 72 x Siemens Gamesa SG 8.4MW 2021 [111]
The Neart na Gaoithe (NnG)  United Kingdom 450 54 SG 8.0-167 DD 2023 [112][113]
CTGNE Yangjiang Shapa - phase II  China 400 Mingyang MySE6.45-180 2021 [114][115]
Rudong H6  China 400 100 x G4-146 2021 [116][114]
Rudong H10  China 400 100 x ?? 2021 [117][114]
Formosa II  Taiwan 376 47 × Siemens Gamesa 8MW-167 DD 2021 [118]
Dogger Bank A  United Kingdom 1200 190 x GE Haliade-X 13MW 2023 [119]
Dogger Bank B  United Kingdom 1200 190 x GE Haliade-X 13MW 2023-2026 [119]

Largest proposed

The following table lists largest offshore wind farm areas (by nameplate capacity) that are only at a proposal stage, and have achieved at least some of the formal consents required before construction can begin.

Wind farm Location Site coordinates Capacity
(MW)
Consents Refs
Sinan Korea Offshore  South Korea 8,200 Project approved in 2021. Expected to be completed by 2030 and help create around 120,000 jobs. Estimated cost: 36 billion €. [120][121][122]
IJmuiden Ver Netherlands52.918970°N 3.567385°E / 52.918970; 3.5673854,000Has been in the spatial planning since (at least) 2014. Research on ecological impact of grid connection started in 2019. Tenders are planned for 2023 (phase 1&2) and 2025 (phase 3&4)[123][124][125]
Coastal Virginia Offshore Wind  United States 36.8878333°N 75.4973333°W / 36.8878333; -75.4973333 2,640 Phase 1 (880 MW), Phase 2 (880 MW), Phase 3 (880 MW) [126][127][128][129][130]
Korea Offshore South Korea2,500Korean government approved[131]
Hornsea Project Three  United Kingdom 2,400 Crown Estate Round 3 [132]
Formosa III Taiwan2,000Undergoing environmental impact assessment and approvals which are expected to be completed between 2021 and 2025[133]
Hollandse Kust Zuid Holland (phases 1-4)  Netherlands 1,400 Phase I & II (76 × 10MW Siemens-193m) to be built by Vattenfall/Nuon by 2023[134]

Phase III & IV (760MW) to be built by Vattenfall

[135][136]
Moray Firth United Kingdom1,866Moray East (1,116MW), Moray West (750 MW)[137][138]
East Anglia (formerly Norfolk Bank) United Kingdom3,100East Anglia TWO - Development Phase (up to 900MW), East Anglia THREE - Consent Given (up to 1,400MW), East Anglia ONE North - Development Phase (up to 800MW)[139][140][141]
Dogger Bank C ( Formely Teesside A ) United Kingdom1,20014MW GE Haliade-X Turbines ( 1,200 MW ). Government support is on offer[142][143]
Sofia Offshore (formerly Teesside B) United Kingdom1,400Subsea survey of cable corridor and project site commenced on 21st February 2020[142][143]
Ocean Wind United States39.366111°N 74.414167°W / 39.366111; -74.4141671,100Bureau of Ocean Energy Management
New Jersey Board of Public Utilities
[144][145][146][147]
Berwick Bank ( Formerly Seagreen phase 2)  United Kingdom 1,400 - 2,300 Phase 2: Charlie, Delta and Echo - Crown Estate Round 3 [148][149][150][151]
Norfolk Vanguard  United Kingdom 1,800 Approved for construction by the UK government. The project will also lay the cabling for the sister project Boreas if the project is approved. Construction is expected to start in the mid to late 2020's. [152][153]
Norfolk Boreas  United Kingdom 1,800 The project is in the examination phase of gaining a development consent order. the project if constructed is expected to be completed in the late 2020's [154][155]
Marr Bank (Formerly Seagreen phase 3)  United Kingdom 900 - 1,850 Phase 3: Foxtrot, Golf - Crown Estate Round 3 [156]

Other notable offshore wind farms

Wind Farm Country Coordinates Year Notability Refs
VindebyDenmark1991First offshore wind farm; 11 × Bonus 450 kW. Decommissioned in 2017.[157][158][159][160][161][162][163]
BeatriceUnited Kingdom58°7′48″N 3°4′12″W20072 × Senvion 5MW prototype turbines, deepest fixed-foundation at 45-metre water depth[164][165][166]
Yttre StengrundSweden2001First offshore wind farm to be decommissioned (in November 2015)
HywindNorway2009First full-scale, deep-water floating turbine: Siemens 2.3 MW turbine in 220 meter-deep water[167][168]
WindFloat 1Portugal2011First full-scale, semi-submersible platform with a Vestas V80-2MW turbine installed in a dry-dock[169]
Block Island United States 41°06′52.96″N 71°31′16.18″W 2016 First and only offshore wind farm in the United States, 5 x 6 MW Haliade 150 turbines totaling 30 MW. [170]
Hywind ScotlandUnited Kingdom2017First full-scale, deep-water floating wind farm, at 30 MW capacity[171]

See also

References

  1. "DONG Tables Hornsea Project One Offshore Construction Schedule". Offshore Wind. Archived from the original on 2018-04-20. Retrieved 2018-04-20.
  2. "World's Largest Offshore Wind Farm Fully Up and Running". Offshore Wind. 2020-01-30. Retrieved 2020-02-03.
  3. "Borssele 1&2". Ørsted. Archived from the original on 2018-11-19. Retrieved 2018-11-19.
  4. "Ørsted fully commissions Borssele 1 & 2 offshore wind farm in Netherlands". www.power-technology.com. Retrieved 13 January 2021.
  5. "Borssele 3 and 4 - Blauwwind - Under Construction Offshore Wind Farm - Netherlands | 4C Offshore". www.4coffshore.com. Retrieved 2020-04-01.
  6. "Borssele III and IV Offshore Wind Farm, the Netherlands". Power Technology | Energy News and Market Analysis. Retrieved 2020-04-01.
  7. "Seajacks, Van Oord to Install East Anglia ONE Foundations". Offshore Wind. Archived from the original on 2018-04-20. Retrieved 2018-04-20.
  8. "East Anglia One Now Officially Fully Operational". Offshore Wind. 2020-07-03. Retrieved 2020-08-01.
  9. "Archived copy". Archived from the original on 2018-09-06. Retrieved 2018-09-06.CS1 maint: archived copy as title (link)
  10. "London Array's own website announcement of commencement of offshore works" (PDF). londonarray.com. Archived from the original (PDF) on 2011-07-22. Retrieved 2011-03-08.
  11. Wittrup, Sanne. First foundation Archived 2011-03-09 at the Wayback Machine Ing.dk, 8 March 2011. Accessed: 8 March 2011.
  12. "London Array - The Project". londonarray.com. Archived from the original on 21 February 2014. Retrieved 10 June 2015.
  13. "Archived copy". Archived from the original on 2018-04-10. Retrieved 2017-05-08.CS1 maint: archived copy as title (link)
  14. "The 600-MW Gemini offshore wind farm is successfully up & running". Windpower Engineering & Development. Archived from the original on 2019-01-21. Retrieved 2019-02-12.
  15. "Archived copy". Archived from the original on 2019-01-21. Retrieved 2017-05-08.CS1 maint: archived copy as title (link)
  16. "Gemini". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 4 September 2015.
  17. "Oleg Strashnov Installs First Beatrice Jacket Foundation". Offshore Wind. Archived from the original on 2017-10-07. Retrieved 2017-10-18.
  18. "Gode Wind foundation installed successfully". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 4 September 2015.
  19. "DONG Energy Inaugurates 582 Megawatt Gode Wind I & 2 Offshore Wind Farms". CleanTechnica. Archived from the original on 16 September 2017. Retrieved 3 July 2017.
  20. "World's second largest offshore wind farm opens off coast of Wales". Wales Online. Archived from the original on 19 June 2015. Retrieved 18 June 2015.
  21. "Full power at Race Bank Offshore Wind Farm". orsted.com. Archived from the original on 2018-10-12. Retrieved 2018-02-02.
  22. "Innovation Installs First Foundation at Race Bank". offshorewind.biz/. Archived from the original on 2 July 2016. Retrieved 2 July 2016.
  23. "UK: Greater Gabbard Offshore Wind Farm Generates Power". Archived from the original on 2012-10-11. Retrieved 2012-09-07.
  24. "Offshore Wind Farms 2008" (PDF). EWEA. 2009-02-02. Archived from the original (PDF) on 2009-04-19. Retrieved 2009-02-04.
  25. "SSE plc - The UK's broadest-based energy company". scottish-southern.co.uk. Archived from the original on 11 January 2011. Retrieved 10 June 2015.
  26. "Foundation first at Hohe See". reNEWS - Renewable Energy News. 2018-04-17. Archived from the original on 2018-04-19. Retrieved 2018-04-20.
  27. "MHI Vestas Sets Up Borkum Riffgrund 2 Base in Emden". Offshore Wind. Archived from the original on 2018-04-20. Retrieved 2018-04-20.
  28. "Horns Rev 3 offshore wind farm Archived 2016-10-22 at the Wayback Machine" Vattenfall, 27 June 2016. Accessed: 29 October 2016.
  29. Ltd, Renews (4 October 2017). "Dudgeon hits CfD milestone". reNEWS - Renewable Energy News.
  30. "World's Largest OW Jack-Up Vessel Installs World's Heaviest Monopile at Veja Mate OWF". Archived from the original on 17 June 2016. Retrieved 6 June 2016.
  31. "Construction complete for 402-MW Veja Mate offshore wind park". Renewables Now. Archived from the original on 21 January 2019. Retrieved 31 May 2017.
  32. "VIPs cut ribbon at 400MW Anholt Archived 2013-09-07 at the Wayback Machine" Recharge News, 4 September 2013. Accessed: 4 September 2013.
  33. Jan Bjerre Lauridsen & Søren Andersen. "Queen says Good Wind to giant turbines Archived 2013-09-13 at the Wayback Machine" Berlingske, 4 September 2013. Accessed: 4 September 2013.
  34. "All turbines at Anholt Offshore wind farm now operational" (Press release). DONG Energy. 20 June 2013. Archived from the original on 6 October 2013. Retrieved 27 August 2013.
  35. Anholf Offshore wind farm in 4C Offshore Archived 2012-06-27 at the Wayback Machine Retrieved 2013-08-27
  36. "BARD 1 (4c)". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 10 June 2015.
  37. Rösler eröffnet Offshore-Windpark Bard 1 Archived 2013-08-28 at the Wayback Machine Retrieved 2013-08-26
  38. German Federal Minister Inaugurates BARD Offshore 1 Archived 2013-08-30 at the Wayback Machine Retrieved 2013-08-26
  39. "Global Tech I officially inaugurated". sunwindenergy.com/. Archived from the original on 11 September 2015. Retrieved 4 September 2015.
  40. "Rampion Offshore Wind Farm Hits Full Stride". Offshore Wind. Archived from the original on 2018-04-18. Retrieved 2018-05-03.
  41. "SPIC Binhai North H2 400MW". www.4coffshore.com. Archived from the original on 2018-07-30. Retrieved 2018-11-26.
  42. "Construction under way at China's largest offshore wind farm". 4c Offshore. Archived from the original on 2019-05-09. Retrieved 2019-05-09.
  43. "CGN Yangjiang Nanpeng Island - Fully Commissioned Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 13 January 2021.
  44. "Global Wind Service to Install Merkur Wind Turbines". Offshore Wind. Archived from the original on 2018-04-20. Retrieved 2018-04-20.
  45. "West of Duddon Sands reaches foundation installation halfway point". Archived from the original on 2014-11-12. Retrieved 2013-08-27.
  46. "West of Duddon Sands". Archived from the original on 2012-05-23. Retrieved 2013-08-27.
  47. "All Monopiles Installed at Arkona Offshore Wind Farm, TPs Next". Offshore Wind. Archived from the original on 2018-07-17. Retrieved 2018-04-20.
  48. Welle (www.dw.com), Deutsche. "Baltic Sea's largest wind farm officially opened | DW | 16.04.2019". DW.COM. Archived from the original on 1 May 2019. Retrieved 1 May 2019.
  49. Datasheet for site: Walney 1 Offshore wind farm Archived 2011-03-26 at the Wayback Machine. LORC Knowledge, 2011
  50. "UK: Walney Offshore Wind Farm Fully Operational". 2012-06-14. Archived from the original on 2016-03-04. Retrieved 2012-06-15.
  51. "24 Turbines Up at Galloper Offshore Wind Farm". Offshore Wind. Archived from the original on 2017-11-09. Retrieved 2017-11-07.
  52. Shields, Mark. "Blow me! Galloper wind farm off East Anglian coast hits full throttle 18 months after building started". East Anglian Daily Times. Archived from the original on 2 May 2018. Retrieved 2 May 2018.
  53. "Construction is starting on the offshore wind farm Wikinger". Archived from the original on 4 April 2016. Retrieved 23 March 2016.
  54. http://www.offshorewindindustry.com/news/first-foundation-nordsee-one-successfully Archived 2016-03-09 at the Wayback Machine First foundation for Nordsee One successfully installed
  55. C-Power: General Informations Archived 2012-04-23 at the Wayback Machine
  56. "RWE Innogy - Press release 09 July 2013 Export cables in at Gwynt y Môr Offshore Wind Farm". rwe.com. Archived from the original on 21 September 2013. Retrieved 10 June 2015.
  57. Phase 2 completed Archived 2012-07-30 at the Wayback Machine
  58. "Belgium: Thornton Bank Offshore Wind Farm Officially Inaugurated". Offshore Wind. Archived from the original on 5 July 2015. Retrieved 10 June 2015.
  59. "SWT-3.6-107 Wind Turbine". Siemens. Archived from the original on 2008-07-25. Retrieved 2009-07-19.
  60. "Sheringham Shoal Offshore Wind Farm" (PDF). StatoilHydro. Retrieved 2009-07-19.
  61. Trickyweb. "Sheringham Shoal Operated by Statkraft". scira.co.uk. Archived from the original on 25 April 2015. Retrieved 10 June 2015.
  62. "Norway's Crown Prince Opens Sheringham Shoal Offshore Wind Farm (UK)". Offshore Wind. Archived from the original on 14 July 2015. Retrieved 10 June 2015.
  63. "Borkum Riffgrund I". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 4 September 2015.
  64. "Rentel Offshore Wind Farm, North Sea - Power Technology". Power Technology. Archived from the original on 2018-04-20. Retrieved 2018-04-20.
  65. "SPIC Jiangsu Dafeng H3 300MW - 4C Offshore". www.4coffshore.com. Archived from the original on 2019-03-23. Retrieved 2019-03-23.
  66. "Dongtai Four (H2) 300MW - 4C Offshore". www.4coffshore.com. Archived from the original on 2019-05-09. Retrieved 2019-05-09.
  67. "Amrumbank West Offshore Wind Farm". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 10 June 2015.
  68. "E.ON's Amrumbank West offshore wind farm is fully operational". www.yourrenewablenews.com. 22 October 2015. Archived from the original on 25 October 2015. Retrieved 22 October 2015.
  69. "Datang Jiangsu Binhai 300MW offshore wind farm - 4C Offshore". www.4coffshore.com. Archived from the original on 2019-03-23. Retrieved 2019-05-09.
  70. "Ming Yang Reaches Turbine Milestone at Chinese OWF". Offshore Wind. 2019-06-17. Retrieved 2020-08-31.
  71. "Thanet". The Engineer Online. 2008-07-25. Archived from the original on 2012-05-27. Retrieved 2008-11-26.
  72. "Thanet offshore wind farm starts electricity production". BBC News. 2010-09-23. Archived from the original on 2010-09-30. Retrieved 2010-09-30.
  73. "China's Largest Offshore Wind Farm Goes Online". Offshore Wind. Archived from the original on 16 January 2018. Retrieved 16 January 2018.
  74. "Jiangsu Longyuan Chiang Sand H1 300MW - 4C Offshore". www.4coffshore.com. Archived from the original on 2018-07-30. Retrieved 2018-11-26.
  75. "Laoting Bodhi Island 300MW Demonstration - 4C Offshore". www.4coffshore.com. Archived from the original on 2019-03-23. Retrieved 2018-11-26.
  76. "Cable-laying begins at Nordsee Ost". Archived from the original on 2013-09-23. Retrieved 2013-08-13.
  77. "Offshore wind farm Nordsee Ost". Archived from the original on 2013-08-28. Retrieved 2013-08-13.
  78. "Butendiek Offshore Wind Farm". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 10 June 2015.
  79. "Butendiek Fully Operational". Archived from the original on 2015-08-11. Retrieved 2015-08-07.
  80. "DanTysk". Archived from the original on 2015-01-15. Retrieved 2015-01-10.
  81. "EnBW lines up Hohe See deals as Baltic 2 opens". Archived from the original on 2015-09-26. Retrieved 2015-09-21.
  82. "4C Offshore - Baltic 2 Wind Farm". Archived from the original on 2012-07-23. Retrieved 2013-08-27.
  83. "Germany's 288MW Meerwind inaugurated in North Sea". Archived from the original on 2014-11-15. Retrieved 2014-11-14.
  84. http://www.offshorewind.biz/2015/07/08/sandbank-owf-construction-kicks-off/ Archived 2015-07-14 at the Wayback Machine Sandbank OWF Construction Kicks Off
  85. "Sandbank fully commissioned". 4c Offshore. 27 January 2017. Archived from the original on 24 February 2017. Retrieved 23 February 2017.
  86. "Lincs Wind Farm Now Fully Operational". Archived from the original on 2013-09-06. Retrieved 2013-08-27.
  87. "Showtime at Burbo 2". reNEWS - Renewable Energy News. 27 April 2017. Archived from the original on 4 November 2017. Retrieved 7 November 2017.
  88. "China's Liuheng Offshore Wind Farm Goes Into Operation". Archived from the original on 26 April 2019. Retrieved 1 May 2019.
  89. "Key project dates for Guodian Zhoushan Putuo District 6 Zone 2 - 4C Offshore". www.4coffshore.com. Archived from the original on 2019-05-09. Retrieved 2019-05-09.
  90. "Eon energy project sees every turbine generating - Grimsby Telegraph". Grimsby Telegraph. Archived from the original on 19 June 2015. Retrieved 15 June 2015.
  91. "4C Offshore - Northwind Offshore wind farm". Archived from the original on 2014-07-07. Retrieved 2013-08-27.
  92. "Westermost Rough Offshore Wind Farm". 4coffshore.com. Archived from the original on 24 January 2016. Retrieved 10 June 2015.
  93. "Westermost Rough hits full power". reNEWS - Renewable Energy News. Archived from the original on 30 May 2015. Retrieved 9 June 2015.
  94. Horns Rev 2 turbines Archived 2012-05-27 at Archive.today
  95. E.ON finishes Rødsand II Archived 2012-05-27 at Archive.today Business Week, 14 July 2010. Retrieved: 11 September 2010.
  96. Datasheet for site: Roedsand 2 offshore wind farm Archived 2012-03-24 at the Wayback Machine. LORC Knowledge, 2011
  97. "Jiangsu Xiangshui 201MW wind farm all turbines connected to the grid (Modern Han Chinese language publication)". Archived from the original on 2012-05-22. Retrieved 2012-08-26.
  98. "Chenjiagang Xiangshui Project Offshore Wind Farm". archive.is. 16 January 2013. Archived from the original on 16 January 2013.
  99. "Borkum West II Commissioned". Enerdata. Archived from the original on 24 September 2015. Retrieved 20 July 2015.
  100. "Jiangsu Luneng Dongtai 200MW Concession - 4C Offshore". www.4coffshore.com. Archived from the original on 2017-10-19. Retrieved 2017-10-18.
  101. "Key project dates for Jiangsu Luneng Dongtai 200MW Concession - 4C Offshore". www.4coffshore.com. Archived from the original on 13 February 2018. Retrieved 13 February 2018.
  102. "About the project". Hornsea Project Two. Orsted. Retrieved 2 August 2020.
  103. "Seagreen Wind Energy - Home". SeagreenWindEnergy. Retrieved 2020-11-18.
  104. #TeamSeagreen (2020-06-03). "Turbine supply contract for Seagreen finalised". SeagreenWindEnergy. Retrieved 2020-11-18.
  105. "Seagreen Offshore Wind Farm, North Sea, Scotland". www.power-technology.com. Retrieved 2020-11-18.
  106. "Moray East - Under Construction Offshore Wind Farm - United Kingdom | 4C Offshore". www.4coffshore.com. Retrieved 2020-04-01.
  107. Fruergaard, Wadia (2018-12-06). "Moray East Signs Firm Order with MHI Vestas Offshore Wind". MHI Vestas Offshore. Retrieved 2020-04-01.
  108. 陳映璇. "離岸風電是未來趨勢產業!沃旭帶來上兆元投資,創造彰化在地就業機會". 社企流 (in Chinese).
  109. "First foundation Installed at Triton Knoll". Offshore Engineer Magazine. 2020-01-22. Retrieved 2020-01-28.
  110. "Triton Knoll". Triton Knoll. Retrieved 2020-01-28.
  111. "Kriegers Flak Offshore Wind Farm - Power Technology". Power Technology. Archived from the original on 2018-04-20. Retrieved 2018-04-20.
  112. "Siemens Gamesa celebrates 'the Strength of the Wind' with firm 448 MW Scottish offshore order". www.siemensgamesa.com. Retrieved 2020-12-10.
  113. "Neart na Gaoithe enters first phase of offshore construction – NnG Offshore Wind". Retrieved 2020-12-10.
  114. "Construction Starts on Chinese Offshore Wind Super Projects". Offshore Wind. 2020-02-24. Retrieved 2020-04-01.
  115. "CTGNE Yangjiang Shapa - phase II - Under Construction Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 2020-04-01.
  116. "Rudong H6 - Under Construction Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 2020-04-01.
  117. "Rudong H10 - Under Construction Offshore Wind Farm - China | 4C Offshore". www.4coffshore.com. Retrieved 2020-04-01.
  118. "綠能推動" (in Chinese). 上緯國際投資控股股份有限公司.
  119. "Offshore". Dogger Bank Wind Farm. Retrieved 2021-01-28.
  120. "South Korea Launches EUR 36 Billion Offshore Wind Project".
  121. "S. Korea Fast-Tracks Plan to Build World's Largest Offshore Wind Farm".
  122. "South Korea plans 8.2-GW offshore wind power complex".
  123. "offshorewind.rvo.nl". Retrieved 15 April 2020.
  124. "Rijksstructuurvisie Windenergie op Zee" (PDF). Retrieved 15 April 2020.
  125. "Notitie Reikwijdte en Detailniveau Net op zee IJmuiden Ver Alpha vastgesteld". Retrieved 15 April 2020.
  126. "Virginia Dominion - Phase one - Concept/Early Planning Offshore Wind Farm - United States | 4C Offshore". www.4coffshore.com. Retrieved 2020-08-31.
  127. "Virginia Dominion - Phase two - Concept/Early Planning Offshore Wind Farm - United States | 4C Offshore". www.4coffshore.com. Retrieved 2020-08-31.
  128. "About the project". Dominion Energy. Dominion Energy. Retrieved 30 August 2020.
  129. "About the project". Washington Post. Washington Post. Retrieved 30 August 2020.
  130. "Virginia Dominion - Phase three - Concept/Early Planning Offshore Wind Farm - United States | 4C Offshore". www.4coffshore.com. Retrieved 2020-08-31.
  131. Deo Maglaya. "South Korea to build $9 billion offshore wind farm by 2019". ecoseed.org. Archived from the original on 2015-02-27. Retrieved 10 June 2015.
  132. "Hornsea Project Three - 4C Offshore". www.4coffshore.com. Archived from the original on 2018-04-21. Retrieved 2018-04-20.
  133. 彭暄貽 (2018-12-12). "上緯旗下海能風電與台電簽定風力發電離岸系統電能購售契約". 中時電子報 (in Chinese).
  134. "Newest and largest turbines for Vattenfall's Hollandse Kust Zuid wind farm". www.windtech-international.com. 15 April 2019. Archived from the original on 15 April 2019. Retrieved 15 April 2019.
  135. "Hollandse Kust Zuid Holland I and II - Chinook - (Tender 2017) - 4C Offshore". www.4coffshore.com. Archived from the original on 2018-04-21. Retrieved 2018-04-20.
  136. "Hollandse Kust Zuid Holland III and IV (Tender 2018) - 4C Offshore". www.4coffshore.com. Archived from the original on 2018-04-21. Retrieved 2018-04-20.
  137. "Moray East - 4C Offshore". www.4coffshore.com. Archived from the original on 2018-04-21. Retrieved 2018-04-20.
  138. "Moray West - 4C Offshore". www.4coffshore.com. Archived from the original on 2018-04-21. Retrieved 2018-04-20.
  139. https://www.scottishpowerrenewables.com/pages/east_anglia_one.aspx
  140. New UK offshore wind farm licences are announced Archived 2011-03-20 at the Wayback Machine, BBC News, 2010-01-08
  141. "East Anglia ONE". ScottishPower Renewables. Archived from the original on 2019-02-17. Retrieved 2019-02-12.
  142. "Forewind finalises first four Dogger Bank boundaries". rechargenews.com. Archived from the original on 19 November 2012. Retrieved 10 June 2015.
  143. "Region's MPs lobbied over Dogger Bank wind farm" Archived 2017-05-28 at the Wayback Machine BBC, 12 October 2011. Retrieved 30 March 2012. Quote: "proposed offshore wind farm"
  144. Warren, Michael Sol (June 21, 2019). "N.J. just gave the green light to build the nation's largest offshore wind farm". nj.
  145. https://www.bloomberg.com/news/articles/2019-06-21/denmark-s-orsted-wins-bid-to-supply-offshore-wind-to-new-jersey
  146. "NJ OKs biggest US wind farm off Jersey Shore; will power 500K homes". Asbury Park Press.
  147. "PSEG Looks to Become Active Player in Offshore Wind Development". NJ Spotlight. October 30, 2019.
  148. "Nexans to Supply Seagreen Phase 1 Export Cables". Offshore Wind. 2019-11-04. Retrieved 2020-01-10.
  149. "Seagreen Wind Energy - Home". SeagreenWindEnergy. Retrieved 2020-01-10.
  150. "Round 3 Wind Farms | Offshore Renewable Energy Developments | Knowledge & Advice | RYA - Royal Yachting Association". www.rya.org.uk. Retrieved 2020-01-10.
  151. "Seagreen 2 and 3 Get New Names". Offshore Wind. 2020-07-07. Retrieved 2020-11-19.
  152. "Norfolk vanguard development consent order". Infrastructure planning inspectorate. Infrastructure planning inspectorate. Retrieved 21 September 2020.
  153. "Norfolk Vanguard". Vattenfall. Vattenfall. Retrieved 21 September 2020.
  154. "Norfolk Boreas". Infrastructure planning inspectorate. Infrastructure planning inspectorate. Retrieved 21 September 2020.
  155. "Norfolk Boreas". Vattenfall. Vattenfall. Retrieved 21 September 2020.
  156. "Seagreen 2 and 3 Get New Names". Offshore Wind. 2020-07-07. Retrieved 2020-11-19.
  157. Operational offshore wind farms in Europe, end 2009 Archived 2010-11-21 at the Wayback Machine EWEA. Retrieved: 23 October 2010.
  158. Christensen, Allan S. & Madsen, Morten. Supply Chain study on the Danish offshore wind industry Archived 2016-05-15 at the Portuguese Web Archive page 33-42 Offshore Center Denmark, 29. August 2005. Retrieved: 23 October 2010.
  159. "Introduction to the (Nysted offshore) park". Archived from the original on 2012-07-30. Retrieved 2010-08-19.
  160. "Data on operating and decommissioned wind turbines (as at end of June 2010)". ENS. 2010-07-16. Archived from the original on 2011-07-19. Retrieved 2010-08-09.
  161. "4cOffshore listing for Vindeby". 4coffshore.com. Archived from the original on 2011-01-27. Retrieved 2010-09-01.
  162. Stenstrop, Georg. Vindeby Archived 2016-04-23 at the Wayback Machine Kulturarv. Retrieved: 1 September 2010.
  163. Prinds, Karsten. "Where offshore wind was invented" Archived 2012-03-11 at the Wayback Machine. OceanWise, 2011
  164. Sharp, Stephen. Scotland shares excellence in renewable energy at World Investment Congress Scottish Enterprise, 15 June 2007. Retrieved: 18 October 2010. "subsea jacket structure which enables the turbines to sit in 45m of water" .. "deepest water depth"
  165. Kempton et al. Supporting Information Archived 2015-09-24 at the Wayback Machine page 3 Proceedings of the National Academy of Sciences, 14 August 2009. Retrieved: 17 October 2010.
  166. "beatricewind.co.uk". Archived from the original on 22 July 2015. Retrieved 10 June 2015.
  167. Patel, Prachi (2009-06-22). "Floating Wind Turbines to Be Tested". IEEE Spectrum. Archived from the original on 2009-06-28. Retrieved 2009-06-25. will test how the 2.3-megawatt turbine holds up in 220-meter-deep water.
  168. Madslien, Jorn (8 September 2009). "Floating challenge for offshore wind turbine". BBC News. BBC. Archived from the original on 11 September 2009. Retrieved 2009-09-16. world's first full-scale floating wind turbine
  169. "WindFloat®". PPI. 19 June 2019. Archived from the original on 19 June 2019. Retrieved 19 June 2019.
  170. "Our offshore wind projects in the U.S." us.orsted.com. Retrieved 2020-11-13.
  171. "Floating turbines deliver first electricity". BBC. 18 October 2017. Archived from the original on 29 March 2019. Retrieved 5 March 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.