Guiyang–Nanning high-speed railway
The Guiyang–Nanning high speed railway is a high speed line between Guiyang and Nanning in China. The line will be 512 km long, of which 482 km is new track. Travel time between the two cities will be cut from 10 hours to 2.5 when the line opens in 2023.[1]
Guiyang–Nanning high-speed railway 贵南高速铁路 | |
---|---|
Overview | |
Status | Under construction |
Locale | Guiyang Nanning |
Service | |
Services | 1 |
Operator(s) | China Railway High-speed |
History | |
Opened | 2023 |
Technical | |
Line length | 512 km (318 mi) |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Operating speed | 350 km/h (217 mph) |
History
Construction on the railway began in 2018.
Route
The line diverges from the existing Guiyang–Guangzhou high-speed railway after Duyun East railway station.
Station Name | Chinese | Metro transfers/connections |
Location | |||||||
---|---|---|---|---|---|---|---|---|---|---|
Guiyang North | 贵阳北 | 1 | Guizhou | |||||||
Guiyang East | 贵阳东 | |||||||||
Longdongbao | 龙洞堡 | Guiyang Longdongbao International Airport | ||||||||
Longli North | 龙里北 | |||||||||
Guidingxian | 贵定县 | |||||||||
Duyun East | 都匀东 | |||||||||
Dushan East | 独山东 | |||||||||
Libo | 荔波 | |||||||||
Huanjiang | 环江 | |||||||||
Hechi | 河池 | Guangxi | ||||||||
Yonganzhen | 永安镇 | |||||||||
Du'an | 都安 | |||||||||
Mashan | 马山 | |||||||||
Nanning North | 南宁北 | |||||||||
Nanning East | 南宁东 | 1 |
References
- "Construction site of Guiyang-Nanning high-speed railway - People's Daily Online". en.people.cn. Retrieved 2020-06-22.
- "贵阳至南宁高铁全面开建 全程运行时间不到2小时-中新网". www.chinanews.com. Retrieved 2020-06-22.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.