Kolkata Metro Rail Corporation

Kolkata Metro Rail Corporation (KMRC) is a Government of India enterprise formed in 2008. The agency was formed to oversee the implementing Kolkata Metro Line 2, also known as East West Metro, connecting the twin cities Kolkata and Howrah. The under construction metro rail route will be partly underground including the part that will be under the river Ganges. The 16.6 km route will have six station each in underground and elevated portions. The terminal stations will be Salt Lake Sector V and the Howrah Maidan.[1] The elevated stretch started operations on 13 February 2020.

Kolkata Metro Rail Corporation
(KMRC)
Native name
কলকাতা মেট্রো রেল নিগম
TypePublic transport
Founded2008
HeadquartersKMRCL Bhawan, HRBC Complex, 2nd & 3rd Floor, Munsi Premchand Sarani, ,
Area served
Kolkata, Howrah
Key people
  • Shri Manas Sarkar (managing director)
  • Smt. Chandrima Roy (chief vigilance officer)
ServicesMetro transportation services
OwnerGovernment of India
Websitehttp://www.kmrc.in/

Ownership

History

KMRC was formed as a joint venture company between two govt bodies, i.e. Government of West Bengal and Government of India on a 50-50 partnership basis. Ministry of Urban Development (now renamed as Ministry of Housing and Urban Affairs) holds the shares on behalf of Govt. of India.

On 29 September 2010, it was decided that Govt. of West Bengal will withdraw all its shares from KMRC, and Govt. of India will be the shareholder of KMRC along with JICA. Thus Govt. of West Bengal gave all its shares to the Ministry of Railways, and making Kolkata Metro a central govt. entity again.[1]

Current status

The current shareholders are given below-

  • Ministry of Railways 74% (including the shares of Govt. of West Bengal)
  • Ministry of Housing and Urban Affairs 26%

As of 31 March 2017, equity holding details-

  • Ministry of Railways721.50 crore (US$100 million) (68.03%)
  • Ministry of Housing and Urban Affairs339 crore (US$48 million) (31.97%)[1][2]

Hurdles faced

The main problem that were faced by KMRC was regarding land. Most of the places, non-availability of land led to delay in the project multiple times. Some of them are mentioned below-

  • Land issue for construction of a new Central station for Line 2, thus leading to route realignment.
  • Land issue in Duttabad for erection of piers of elevated stretch, and leading to resurveying of the stretch by RITES
  • Land and rehabilitation issues in construction of Mahakaran station and so shifting the station location.

Other issues were-

  • Delay in finalisation of the newly aligned route from Sealdah to Howrah.
  • Improper and irregular flow of funds
  • Traffic diversion related problems also led to delays[2]

See also

References

  1. "Annual Report" (PDF). Kolkata Metro Rail Corporation Ltd. 2017.
  2. "KMRC Annual Report" (PDF).


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.