Kolkata Metro Line 6

Line 6 of the Kolkata Metro is an under-construction rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. There will be total of 24 stations. The line is targeted to open from Kavi Subhash to Hemanta Mukherjee in 2021.[3] This stretch will be one the most important stretches of metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. Total distance of this route will be 29.87 km (18.56 mi).[1]

Kolkata Metro Line 6

Kavi Subhash-Biman Bandar
Overview
Other name(s)
  • New Town metro
  • Airport Metro
  • Bypass Metro
StatusUnder Construction
OwnerMetro Railway, Kolkata
Line number6
LocaleKolkata Metropolitan Area, India
TerminiKavi Subhash (south)
Biman Bandar (north)
Connecting lines Line 1   Line 2   Line 4 
Stations24
Websitehttps://mtp.indianrailways.gov.in
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
Depot(s)
  • NSCBI Airport (underconstruction)
  • New Garia (underconstruction)
  • New Town
Daily ridership500,000 (projected)
History
Commenced2012
Planned opening2021 (Kavi Subhash-Hemanta Mukhopadhay)
Technical
Line length29.87 kilometres (18.56 mi)[1]
Number of tracks2
Character
  • Surface – 1
  • Underground – 1
  • Elevated – 22
Track gauge1,676 mm (5 ft 6 in) Broad gauge
Electrification750 V DC[2] using third rail
Operating speed80 km/h (designed)
SignallingCommunications-based train control
Route map

Kavi Subhash  Line 1 
Satyajit Ray
Jyotirindra Nath Nandi
Panchanangram Canal
Kavi Sukanta
Hemanta Mukherjee
VIP Bazaar
Ritwik Ghatak
Storm Water Outlet Canal
Barun Sengupta
Beliaghata
Captain Bhery
Gour Kishore Ghosh
Nicco Park
3rd Avenue
Salt Lake Sector-V  Line 2 
Technopolis
Keshtopur Canal
Bidhannagar
Sub CBD 1
CBD 1
Keshtopur Canal
CBD 2
Newtown
Convention Centre
Sub CBD 2
Titumir
Rajarhat Road
Rabindra Tirtha
VIP Road
Biman Bandar  Line 4 
Airport Depot

History

This project was sanctioned in the budget of 2010-11 by Mamata Banerjee with a project deadline of six years.[4] The execution of this project has been entrusted to RVNL at a cost of Rs 3951.98 crore. It will help to reduce travel time between the southern fringes of Kolkata to Netaji Subhas Chandra Bose International Airport and will have 23 elevated stations, 1 underground station and 1 at-grade. The terminal Airport station being the underground one.

Work for construction of the terminal station at New Garia for the 29.87-km Kavi Subhash-Biman Bandar (via Rajarhat) metro project finally resumed on 14 February 2017 with Rail Vikas Nigam Ltd (RVNL) demarcating the plot they require for the purpose.

The work has been delayed for years due to multiple issues. At first AAI objected the station above the ground, stating that this could be a threat for air traffic. Many underground utilities, power sub-station and water treatment plant had to be shifted. Encroachments and Land acquisition problems held up the project for multiple times.

The 5 km stretch from New Garia to Ruby Hospital was expected to start from 2018.[5] On 12 February 2018 Mr Ajay Vijayvargiya, General Manager Metro Railways announced a delay in inauguration of New Garia to Ruby stretch.

Stations

The stations, as declared of now, will be named after eminent personalities.[4][6][7] and will have 23 elevated stations, 1 underground station and 1 at-grade. The terminal Airport station will be the underground one. This station will also have a yard and it will be the largest underground facility of India and city's first. It will be 550m long and 41.6m wide and will facilitate stabling and reversal of rakes, but it will not be a carshed. One can interchange to Line 4 at Dum Dum Airport, Line 2 at VIP Road (Haldiram) and Salt Lake Sector V and Line 1 at Kavi Subhash. At Kavi Subhash, Rail Interchange will be also available (SDAH-NMKA Line).

On 4th January 2021 the state government decided to rename 9 metro stations in New Town area to their more prevailing names rather than using the old ones which were given during the planning phase. The state transport department has informed Housing Infrastructure Development Corporation (HIDCO) of the new names of the proposed nine metro stations between Nazrul Tirtha at the entry of New Town from Salt Lake Sector 5 till Chinar Park, the last station on the line before it turns right on VIP road towards Kolkata Airport.[8]

Line 6
No. Station Name Location Phase Opening Connections Layout Notes
EnglishBengali
1Biman Bandarবিমান বন্দরNSCB International Airport 4Under construction Line 4  (Under construction)

Netaji Subhash Chandra Bose International Airport

Airport AC Bus Stand

Airport Gate No. 1 Bus Stop

Airport Gate No. 2 Bus Stop

Airport Gate No. 2.5 Bus Stop

Airport Gate No. 3 Bus Stop

Underground
2VIP Road / Haldiramভি আই পি রোড / হলদিরামTeghoria Line 2  (Planned)

Minibus Stand

Haldiram Bus Stop

Elevated
3Chinar Parkচিনার পার্কNew Town
4City Centre IIসিটি সেন্টার ২
5Mangal Deepমঙ্গল দীপ Also known as Akanksha 5-point crossing
6Eco Parkইকো পার্ক Also known as Nawabpur
7Mother's Wax Museumমাদার্স ওয়াক্স মিউজিয়াম
8Siksha Tirthaশিক্ষা তীর্থ Also known as Kala Kshetra
9Biswa Bangla Convention Centreবিশ্ব বাংলা কনভেনশন সেন্টার Also known as Narkelbagan / Rabindra Tirtha
10Swapno Bhorস্বপ্ন ভোর
11Nazrul Tirthaনজরুল তীর্থ Also known as Newtown Bus Stand
12TechnopolisটেকনোপোলিসSalt LakeAlso known as Bidhannagar Limit
13Salt Lake Sector Vসল্টলেক সেক্টর ৫ 3 Line 2  (Operational)

Wipro Bus Stop

Saltlake Bus Depot

Karunamoyee Bus Station(WBTC,CTC,SBSTC,NBSTC)

Located near IT Hub of Kolkata
14Nicco Parkনিক্কো পার্কServing Nicco Park
15Gour Kishore Ghoshগৌর কিশোর ঘোষAlso known as Chingrighata / Sukanta Nagar
16BeliaghataবেলেঘাটাBeliaghataAlso known as Tangra Metropolitan Township
17Barun Senguptaবরুণ সেনগুপ্তDhapa/Mathpukur 2Also known as Metropolitan
18Ritwik Ghatakঋত্বিক ঘটকScience CityAlso known as Parama Island
19VIP Bazarভি আই পি বাজারVIP Bazar
20Hemanta Mukherjeeহেমন্ত মুখার্জিRuby Island 1Also known as Kasba Golpark / East Kolkata Township
21Kavi Sukantaকবি সুকান্তKalikapur
22Jyotirindra Nath Nandiজ্যোতিরীন্দ্র নাথ নন্দীMukundapurAlso known as Singhbari
23Satyajit Rayসত্যজিৎ রায়SRFTI / Hiland Park Bengal Ambuja Bus Stop

Hiland Park Bus Stop

Peerless Hospital Bus Stop

Also known as Chak Garia
24Kavi Subhashকবি সুভাষNew Garia7 October 2010 Line 1  (Operational)

New Garia Station

New Garia Station Bus Stand

At Grade

See also

Line 2 and 6 under construction at Salt Lake Sector V, November 2017

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.