List of hydroelectric power stations in Pakistan
This is a list of hydroelectric power stations in Pakistan.
In service
Station | Community | Location | Capacity (MW) | In-Service Date | Notes |
---|---|---|---|---|---|
Tarbela Dam | Tarbela, KPK | 34°05′23″N 72°41′54″E | 4,888 | 1974 | |
Ghazi-Barotha Hydropower Project | Attock, Punjab | 33°46′48″N 72°15′35″E | 1,450 | 2002 | |
Mangla Dam | Mirpur, Azad Kashmir | 33°08′31″N 73°38′42″E | 1,150 | 1967 | Mangla Refurbishment Project is under construction wherein the generating units of Mangla Hydel Power Station will be refurbished by closing down one tunnel (two generating units) at a time. First two units will be refurbished by December 2018, the next two by December 2019 and the other two by December 2020.Refurbishment of all the 10 generating units will be completed by the year 2024. After undergoing refurbishment project is completed capacity will increase by another 310 MW. |
Neelum–Jhelum Hydropower Plant | Muzaffarabad, Azad Kashmir | 34°23′34″N 73°43′08″E | 969 | 2018 | |
Warsak Dam | Peshawar, KPK | 34°09′50″N 71°21′29″E | 243 | 1960 | Extension and rehabilitation is being planned. The total cost of the rehabilitation project €162 million is being co-financed with the KfW (€40 million), EIB (€4.5 million), AFD (€41.5 million) and Pakistan government contributions. |
Chashma Barrage | Chashma, Punjab | 184 | 2001 | ||
Patrind Hydropower Plant | Muzaffarabad, Azad Kashmir | 147 | 2017 | ||
Duber Khwar Hydropower Project | Kohistan, KPK | 130 | 2013 | ||
Allai Khwar Hydropower Project | Mansehra, KPK | 121 | 2013 | ||
Golen Gol Hydropower Project | Chitral, KPK | 108 | 2018 | ||
Gulpur Hydropower Project | Gulpur, Azad Kashmir | Poonch River | 102 | 2020 | |
Jinnah hydropower project | Jinnah Barrage, Punjab | 96 | 2013 | ||
New Bong Escape Hydropower Plant | Mirpur, Azad Kashmir | 84 | 2013 | ||
Malakand-III Hydropower Project | Malakand, KPK | 81 | 2008 | ||
Khan Khwar Hydropower Project | Shangla, KPK | 72 | 2013 | ||
Daral Khwar Hydropower Plant | Swat District, KPK | 36.6 | 2018 | ||
Jagran-I Dam | Neelum, Azad Kashmir | 34°36′1.52″N 73°45′44.20″E | 30.4 | 2000 | |
Rasul Barrage Hydropower Project | Mandi Bahauddin, Punjab | 32°40′49″N 73°31′15″E | 22 | 1952 | |
Jabban Hydropower Plant | Malakand, KPK | 22 | 1935 | ||
Dargai Hydropower Plant | Malakand, KPK | 20 | 1953 | ||
Naltar-IV Hydropower Plant | Naltar Valley, Gilgit-Baltistan | 18 | 2007 | ||
Gomal Zam Dam | South Waziristan | 17.4 | 2013 | ||
Satpara Dam | Skardu | 17.3 | 2012 | ||
Ranolia Hydropower Plant | Kohistan, KPK | 17 | 2016 | ||
Naltar-V Hydropower Project | Naltar Valley, Gilgit-Baltistan | 14.4 | 2016 | ||
Nandipur Hydropower Plant | Gujranwala, Punjab | 13.8 | 1963 | ||
Shadiwal Hydropower Plant | Shadiwal Warriach, Punjab | 13.5 | 1961 | ||
Chichonki Malian Hydropower Plant | Sheikhupura, Punjab | 13.2 | 1959 | ||
Marala Hydropower Project | Sialkot, Punjab | 7.64 | 2018 | ||
Reshun Dam | Chitral | 4.5 | 1991 | ||
Kurram Garhi Hydropower Plant | Kurram Garhi, KPK | 4 | 1958 | ||
Nalter-II Hydropower Project | Naltar Valley, Gilgit-Baltistan | 2.28 | |||
Renala Khurd Hydropower Plant | Renala Khurd, Punjab | 1.1 | 1925 | ||
Darawat Dam | Jamshoro, Sindh | 0.5 | 2014 | ||
Machai Hydropower Plant | Mardan, KPK | 2.6 | 2017 | ||
Chashma Dam | Chashma, Punjab | 1.2 | 2000 | ||
Kathai Dam | Muzaffarabad, Azad Kashmir | 3.2 | 1995 | ||
Kundal Shahi Hydropower Project | Neelam Valley, Gilgit-Baltistan | 2 | 1992 | ||
Kel Htdropower Project | Muzaffarabad, Azad Kashmir | 0.45 | |||
Leepa Dam | Muzaffarabad, Azad Kashmir | 2 | |||
Pehur Dam | Pehur, KPK | 18 | 2012 | ||
Sishi Dam | Chitral, KPK | 2 | |||
Singul Dam | Gilgit-Baltistan | 1.2 | |||
Bubind Dam | Astore | 0.64 | |||
Gilgit Dam | Gilgit-Baltistan | 10.63 | |||
Skardu-I Dam | Skardu | 6.96 | |||
Skardu-II, III Dams | Skardu | 1.64 | |||
Chilas-I Dam | Chilas | 5.62 | |||
Hunza Dam | Hunza Valley, Gilgit-Baltistan | 5.13 | |||
Shyok Dam | Shyok Valley, Gilgit-Baltistan | 4.85 | |||
Astore Dam | Astore | 3.11 | |||
Kachura-II Dam | Skardu | 3 | |||
Pakpatan Hydropower Project | Pakpatan, Punjab | 2.82 | 2019 | ||
Ghizar Dam | Gilgit-Baltistan | 2 | |||
Thak Dam | Chilas | 2.00 | |||
Phandar Dam | Gupis-Yasin District, Gilgit-Baltistan | 2 | |||
Bordas Dam | Ghanche | 2 | |||
Kharmang Dam | Kharmang Valley, Gilgit-Baltistan | 1.89 | |||
Yasin Dam | Gupis-Yasin District, Gilgit-Baltistan | 1.61 | |||
Bunnar Chilas Dam | Diamer District, Gilgit-Baltistan | 1.5 | |||
Roundu Dam | Roundu Valley, Gilgit-Baltistan | 1.52 | |||
Kar Gah-I, II, III, IV, V, VI, VII Hydropower Project | Gilgit-Baltistan | 13.34 | |||
Jaglot-I, II Hydodropower Project | Jaglot | 1.32 | |||
Darel-I, II Dams | Ghanche | 1.2 | |||
Dunsam power station | Ghanche, Gilgit-Baltistan | ||||
Boladas-I Dam | Hunza Valley, Gilgit-Baltistan | 0.64 | |||
Khunjerab Dam | Gujrab River | 0.59 | |||
Gol Dam | Skardu | 0.4 | |||
Harpo-I, Harchu, Dainyor, Gurikot, Kayo, Dango Das Hydropower Project | Gilgit-Baltistan | 2 | |||
Manthoka, Astore, Gulmit, Tolti-I, Khaplu-I, Kachura-I, Darel Hydropower Project | Gilgit-Baltistan | 1.5 | |||
Khaibar-I, II, Mushki, Rattu, Misgar, Ghandus, Kiris-I, Thally-I, Mendi, Stak Hydropower Project | Gilgit-Baltistan | 4.85 | |||
Tangir-I, Chillas-II, Hayul, Khaplu-I, Sumayar-I, Mehdabad, Nomal, Pari Hydropower Project | Gilgit-Baltistan | 1.5 | |||
[[Jaglot Sai, Sermik-I, Olding-I, Thore, Minapin-I, Ahmadabad-I, II, Chalt-I, Sosat Hydropower, Jalalabad, Tangir Dam, Bunner, Parishing/Louse, Shirting, Sher Qila, Shigar , Khyber-I, Khyber-II, Chalt, Naz Bar, Hisper-I, Haramosh, Tormik-I, Basho-I, Sermik, Pion, Chitral Hydel, Jari, Machai]] | Gilgit-Baltistan | 1 | |||
Hasanabad-I, II, III, IV, V Dams | Hunza Valley | 2 | |||
Dumsum Dam | Gah | 1.5 | |||
Balagond Dam | Gah | 1.5 | |||
Ishkuman-I, II Dams | Ishkuman | 2.38 | |||
Ashuran Dam | 1.2 | ||||
Thall Dam | 0.4 | ||||
Bumborat, Rashang HPP, Matta HPP, Shishi, Karora, Kalam HPP, Keyal, Kaghan, Duber, Jalkot, Gram Chashma, Damori, Keel, Pattika, Chinari, Serai, Kumrat HPPs | Various Locations in KPK | 2.2 | |||
Total In-Service Generation | 10132.53 | ||||
Under construction
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Jagran-II Hydropower Project | Neelum, Azad Kashmir | Neelum River | 48 | Under construction. To be operational by Feb 2020.[1] |
Kurram Tangi Dam- Stage I | North Waziristan, FATA | Kurram River | 83.4 | Under construction. To be operational by Apr 2020.[2] |
Koto Hydropower Plant | Upper Dir, KPK | Panjkora River | 40.8 | Under construction. To be operational by Jun 2020.[3] |
Karora Hydropower Plant | Shangla, KPK | Khan Khwar River | 11.8 | Under construction. To be operational by Jun 2020.[4] |
Jabori Hydropower Project | Mansehra, KPK | Siran River | 10.8 | Under construction. To be operational by Jun 2020.[4] |
Naltar-III Hydropower Project | Naltar, Gilgit-Baltistan | 16 | Under construction. To be operational by Jul 2020.[5] | |
Keyal Khwar Hydropower Project | Kohistan, KPK | Keyal Khwar River | 128 | Under construction. To be operational by Aug 2020.[6] |
Nara Hydropower Project | Nara, Sindh | 13.6 | Under construction. To be operational by Mar 2021.[7] | |
Karot Hydropower Project | Rawalpindi, Punjab | 720 | Under construction. To be operational by Apr 2021.[8] | |
Lawi Hydropower Plant | Chitral, KPK | 69 | Under construction. To be operational by Nov 2021.[9] | |
Matiltan Hydropower Project | Swat, KPK | 84 | Under construction. To be operational by 2021.[10] | |
Suki Kinari Hydropower Project | Mansehra, KPK | 884 | Under construction. To be operational by Dec 2022.[11] | |
Naulong Dam | Jhal Magsi, Balochistan | 4.4 | Under construction. To be operational by 2022.[12] | |
Sharmai Hydropower Project | Upper Dir, KPK | 150 | Under construction. To be operational by 2022.[13] | |
Shagarthang Hydropower Project | Skardu, Gilgit-Baltistan | 26 | Under construction. To be operational by 2022.[14][15] | |
Shingo Kas Hydropower Project | Dir, KPK | 102 | Under construction. To be operational by Mar 2024.[16] | |
Mohmand Dam | Mohmand Agency, KPK | 34°21′11″N 71°31′58″E | 800 | Under construction. To be operational by May 2025.[17] |
Dasu Dam (Stage I) | Dasu, KPK | 4,320[18] | Under construction. To be operational by 2026.[19] | |
Tangir Hydropower Project | Chilas, Gilgit-Baltistan | 21[20] | Under construction.[21] To be operational by 2028 [22] | |
Diamer-Bhasha Dam | Chilas, Gilgit-Baltistan | 4,500 | Under construction.[23] To be operational by 2028.[24] | |
Total Under-Construction Generation | 12,032.8 | |||
Proposed
Station | Community | Location | Capacity (MW) | Status |
---|---|---|---|---|
Kohala Hydropower Project | Muzaffarabad, Azad Kashmir | 1,124 | Ready to be constructed in 2020.[25] | |
Azad Pattan Hydropower Project | Sudhanoti, Azad Kashmir | 700 | Ready to be constructed in 2020.[26] | |
Balakot Hydropower Project | Mansehra, Khyber Pakhtunkhwa | 300 | Ready to be constructed in 2020.[27] | |
Athmuqam Dam | Athmuqam, Azad Kashmir | 350 | Ready to be constructed. Korea Hydro & Nuclear Power Corporation won the contract for construction.[28] | |
Toren More Project | KPK | 35 | Ready to be constructed. Sinohydro Corporation China and Sichuan Energy Industry Investment Group Co. Ltd. China won the contract for construction.[29] | |
Turtonus-Uzghor Dam | Chitral, KPK | 58 | Ready to be constructed. Sinohydro Corp Ltd and Sachal Engineering Works Private Ltd won the contract for construction. | |
Lower Spat Gah hydropower project | Kohistan, KPK | 496 | Ready to be constructed.[30] | |
Arkari Gol Hydropower Project | Chitral, KPK | 99 | Ready to be constructed.[31] | |
Taunsa Barrage Hydropower Plant | Muzaffargarh, Punjab | 120 | Ready to be constructed.[32] | |
Chianwali Hydropower Project | Gujranwala, Punjab | 5.38 | Ready to be constructed.[33] | |
Deg Outfall Hydropower Project | Gujranwala, Punjab | 4.04 | Ready to be constructed.[33] | |
Okara Hydropower Project | Gujranwala, Punjab | 4.16 | Ready to be constructed.[33] | |
Chashma Hydel Power Project | Mianwali, Punjab | 5.0 | Ready to be constructed.[34] | |
Mahl Hydropower Project | Azad Kashmir | 34°55′N 73°34′E | 590 | Ready to be constructed. China Three Gorges Corporation won the contract for construction.[35] |
Nekherdim-Paur Dam | Chitral, KPK | 80 | Ready to be constructed. CTG won the contract for construction.[36] | |
Chakothi-Hattian Hydropower Project | Muzaffarabad, Azad Kashmir | 500 | Ready to be constructed. Chinese firm won the contract for construction. | |
Hanzel Hydropower Project | Hanzel, Gilgit | 20 | Ready to be constructed. Cost estimate $63 million.[37] | |
Kalam Asrit | Kalam, KPK | 197 | Ready to be constructed. KPK government signed MOU with Korea’s state-owned M/S Korea South East Power Company. Cost estimate $500 million.[38] | |
Nai Gaj Dam | Dadu, Sindh | 4.2 | Ready to be constructed. | |
Ghowari Hydropower Project | Gilgit-Baltistan | 30 | Ready to be constructed. Cost estimate $80 million.[39] | |
Tarbela Dam Extension-V | Tarbela, KPK | 34°05′23″N 72°41′54″E | 1,410 | Ready to be constructed. Cost estimate $796 million.[40][41] |
Bara Dam | Tirah, Khyber Agency | 5.8 | Ready to be constructed.[42][43][44][45] | |
Bunji Hydropower Project | Astore District, Gilgit-Baltistan | 35°39′N 74°36′E | 7,100 | Ready to be constructed. MOU signed with China’s National Energy Administration.[46] Cost estimate $6.8 billion.[47] |
Patan hydropower Project | Patan Village, Indus River | 2,400 | Ready to be constructed. MOU signed with China’s National Energy Administration.[43][44][45][48] Cost estimate $6 billion.[49] | |
Harpo Hydropower Project | Skardu, Gilgit-Baltistan | 34.5 | Ready to be constructed.[50] | |
Thakot Hydropower Project | Battagram District, KPK | 34°45′N 72°55′E | 4,000 | Feasibility studies to be completed by Dec 2017. MOU signed with China’s National Energy Administration[43][44][45] Cost estimate $6 billion.[49] |
Phandar Hydropower Project | Gupis-Yasin District, Gilgit-Baltistan | 81 | Detailed engineering design or tender of documents under process.[42][45] Cost estimate $128 million .[49] | |
Basho Hydropower Station | Skardu, GB, Indus River | 28 | Detailed engineering design or tender of documents under process.[42][43] Cost estimate $40 million.[49] | |
Tank Zam Dam | Hinis Tangi, KPK, Tank Zam River | 25.5 | Feasibility studies completed.[43] Cost estimate $234 million.[47] | |
Hingol Dam | Lasbela District, Hingol River, Balochistan | 3.5 | Feasibility studies completed. Cost estimate $311 million.[47] | |
Akhori Dam | Akhori, Punjab, Haro River | 600 | Feasibility studies ongoing. Cost estimate $1.6 billion.[49] | |
Middle Palas hydropower project | Kohistan, KPK | 373 | Feasibility studies ongoing.[43][44][45] Cost estimate $763 million.[47] | |
Upper Palas hydropower project | Kohistan, KPK | 160 | Feasibility studies ongoing.[43][44][45] Cost estimate $763 million.[47] | |
Madian Hydropower Project | Swat, KPK, Swat River | 157 | Feasibility studies ongoing.[51] | |
Shushai-Zhendoli Hydropower Project | Chitral, KPK | 144 | Financing is being arranged for these projects by selling shares in the existing projects.[52] | |
Shogosin Hydropower Project | Chitral, KPK | 132 | Financing is being arranged for these projects by selling shares in the existing projects.[52] | |
Latambar Dam | Karak District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Mairoobi Dam | Nowshera District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Jaroba Dam | Nowshera District, Khyber Pukhtunkhwa | ? | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Naran Dam | Mansehra District, Khyber Pukhtunkhwa | 188 | EOI invited.[53] | |
Gorband Hydropower Project | Shangla District, KPK | 14 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53][54] | |
Nand Bahar Dam | Battagram District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Mojigram Shagoor Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Astar Rabooni Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Arkari Gol Dam | Chitral District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Shringal Dam | Upper Dir District, Khyber Pukhtunkhwa | 50 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Patrak Barikot Dam | Swat District, Khyber Pukhtunkhwa | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Segokatch Dam | Chitral District, KPK | 60 | The preliminary feasibility study of the project has been completed and process of site selection completed.[53] | |
Taunsa Hydropower Project | 135 | IPP, RFP has been accepted.[55] | ||
Shigo Kas Hydropower Project | 102 | EOI invited.[55] | ||
Bata Kundi Hydropower Project | 96 | EOI invited.[55] | ||
Ghorband Khwar Hydropower Project | 21 | EOI Iinvited.[55] | ||
Nandihar Khwar Hydropower Project | 12 | EOI invited.[55] | ||
Winder Dam | Lasbela District, Winder River, Balochistan | 0.3 | Proposed. Cost estimate $148 million.[47] | |
Daraban Zam Dam | Dera Ismail Khan, KPK, Khora River | 0.75 | Proposed. Cost estimate $69 million.[47] | |
Ghabir Dam | Ghabir River | 0.15 | Proposed. Cost estimate $121 million.[47] | |
Papin Dam | Rawalpindi District, Wadala Kas | 0.3 | Proposed. Cost estimate $101 million.[47] | |
Rajhdani Dam | Kotli District, AJK Poonch River | 132 | EOI invited.[36] | |
Gabral Kalam | Kalam, Khyber Pakhtunkhwa | 101 | LoS issued. | |
Bhadi Dhoba Hydropower Project | Haveli District | 1 | Proposed. | |
Galeter Hydropower Project | Kotli District | 1 | Proposed.[56] | |
Saridoa Cross Hydropower Project | Bhimber District | 1.7 | Proposed. | |
Chamfall Hydropower Project | Hattian District | 6.4 | Proposed.[56] | |
Guddu Hydropower Station | Kashmore, Sindh | 33 | Proposed. | |
Harighel Hydropower Project | 53 | Proposed. | ||
Sehra Hydropower Project | Azad Kashmir, Poonch River | 130 | Proposed. | |
Nagdar Hydropower Project | Neelum, AJK, Jagran River | 25 | Proposed.[57] | |
Duwarian Hydropower Project | Hattian Bala, AJK, Jagran River | 29 | Proposed.[57] | |
Asrit-Kedam Hydropower Project | Kalam, KPK, Swat River | 215 | Proposed. | |
Karang Hydropower Project | 458 | Proposed. | ||
Shogo-Sin Hydel Dam | 132 | Proposed. | ||
Shushgai Zhendoll | 144 | Proposed. | ||
Yogo, Pakistan | 500 | Proposed. | ||
Thor Hydropower Project | 3.6 | Proposed.[47] | ||
Yulbo Hydropower Project | 3000 | Proposed.[49] | ||
Shyok Hydropower Project | 520 | Proposed.[49] | ||
Tungus Hydropower Project | 2200 | Proposed.[49] | ||
Skardu Dam | Skardu | 1600 | Proposed.[49] | |
Dudhnial Hydropower Project | 960 | Proposed.[49] | ||
Kundal Shahi Hydropower Project | 960 | Proposed.[49] | ||
Trappi Hydropower Project | 32 | Proposed.[49] | ||
Nandihar Hydropower Project | Battagram, Khyber Pukhtunkhwa | 10 | Proposed.[54] | |
Mujigaram Shagore Hydropower Project | Chitral, Khyber Pukhtunkhwa | 51 | Proposed.[54] | |
Istaro Booni Hydropower Project | Chitral, Khyber Pukhtunkhwa | 52 | Proposed.[54] | |
Katzarah dam | Skardu, Gilgit-Baltistan | 15000 | Proposed.[58] | |
Arkari Gol Hydropower Project | Chitral, Khyber Pukhtunkhwa | 79 | Proposed.[54] |
References
- "48 MW Jagran- II HPP". Fwo.com.pk.
- "Minister Discusses Issues Of Water And Hydro-power With WAPDA - UrduPoint". Urdupoint.com.
- "KP Govt completes 255 mini hydropower projects". The Nation. October 1, 2018.
- "KP Govt completes 255 mini hydropower projects, proposes 7 projects for inclusion in CPEC". www.thenews.com.pk.
- {https://www.suchtv.pk/pakistan/gilgit-baltistan/item/92310-federal-govt-vows-for-early-completion-of-hydro-power-projects-in-gilgit-baltistan.html
- "Archived copy". Archived from the original on 2017-02-19. Retrieved 2017-02-18.CS1 maint: archived copy as title (link)
- "Sindh's first run-of-the-river power plant seeks generation licence". Thenews.com.pk.
- "Chinese firm to complete Pakistan hydropower project by April 2021". May 8, 2019.
- "Unpaid Chinese contractor threatens to stop work on KP project". www.thenews.com.pk.
- "KP spends Rs10b on 252MW hydropower generation projects". Thenews.com.pk.
- "Suki Kinari Hydropower Project to produce 870MW". www.thenews.com.pk.
- "Work on Naulong Dam to be started soon, Senate body told". www.radio.gov.pk.
- "Sharmai hydropower project". Nation.com.pk. 10 September 2017.
- "Shagarthang Hydropower Project approved – PAMIR TIMES". Pamirtimes.net. Retrieved 2018-07-17.
- "(ECNEC) Friday approved the 26 MW Shagarthang Hydropower Project for Skardu : ResultDon - - Results, Exams, Education, Jobs". Resultdon.blogspot.com.
- "SaifCo Hydropower Limited (SCHPL) Seeks Power Generation License For 102 MW Hydropower Project - UrduPoint". Urdupoint.com.
- "Mohmand Dam to be completed by December 2025: Wapda chief". The Nation. February 17, 2020.
- Abduhu, Salman (21 November 2019). "Dasu dam to generate 4,320MW electricity, Senate panel told". The Express Tribune. Retrieved 25 June 2020.
- "GE Renewable Energy to supply equipment for 2,160-MW Dasu hydropower in Pakistan". Renewable Energy World. May 19, 2020.
- Ghumman, BR Web Desk | Mushtaq (2020-05-14). "21MW Tangir Hydropower Project: Wapda, JV of Power China-FWO ink agreement". Brecorder. Retrieved 2020-06-25.
- "Contractors moving to Diamer-Bhasha Dam site". The Express Tribune. 25 June 2020. Retrieved 25 June 2020.
- "Govt plans Tangir Dam to power Bhasha Dam construction". The Nation. 2018-07-18. Retrieved 2020-06-25.
- "Contractors moving to Diamer-Bhasha Dam site". The Express Tribune. 25 June 2020. Retrieved 25 June 2020.
- "WAPDA signs agreement to advance 4,500-MW Diamer Basha Dam". Hydro Review. 2020-05-14. Retrieved 2020-06-25.
- Hasnain, Khalid (August 26, 2018). "Kohala project land acquisition may complete by December". DAWN.COM.
- https://www.geo.tv/latest/296598-pakistan-china-to-ink-agreement-for-azad-pattan-hydel-power-projects-construction-today
- "300 MW Balakot Hydro Power Project To Be Started This Year". UrduPoint.
- http://tribune.com.pk/story/679362/power-board-approves-projects-of-2630mw-capacity/
- "Sinohydro Corporation China, Sichuan Energy Industry Investment Group C.Ltd To Execute Toren More Hydropower Project". UrduPoint.
- "KHNP wins deal to build 496-megawatt hydropower plant in Pakistan'". www.ajudaily.com. November 6, 2018.
- Report, Monitoring (October 24, 2018). "Master group wins bid to setup 99MW hydropower project".
- "Hydro Power: Electricity project on Taunsa barrage - The Express Tribune". Tribune.com.pk. 24 April 2011.
- "Power crisis: Punjab earmarks Rs10b for energy projects - The Express Tribune". Tribune.com.pk. 10 June 2012.
- "Infrastructure Development in Pakistan". Defence.pk.
- "Timely Completion Of Cpec Projects, Our Priority: Sardar Masood Khan". KashmirWatch. Retrieved 2018-07-17.
- "Power board approves projects of 2,630 MW capacity - The Express Tribune". Tribune.com.pk. 6 March 2014.
- Reporter, The Newspaper's (2 October 2015). "Ecnec approves Rs102bn projects". Dawn.com.
- "KP govt, Korean company ink MoU for building hydropower project". Thenews.com.pk.
- "CDWP approves Rs130b development projects - Daily Pakistan Observer -Daily Pakistan Observer –". pakobserver.net.
- "Another $51m to expedite Tarbela project completion - Newspaper". Dawn.Com. Retrieved 2018-07-17.
- "Tarbela fifth extension project gets CDWP's nod - The Express Tribune". Tribune.com.pk. 2 October 2015.
- "Archived copy". Archived from the original on 2012-02-22. Retrieved 2010-08-02.CS1 maint: archived copy as title (link)
- "Archived copy". Archived from the original on 2014-07-22. Retrieved 2014-08-27.CS1 maint: archived copy as title (link)
- "Archived copy". Archived from the original on 2010-12-01. Retrieved 2010-08-17.CS1 maint: archived copy as title (link)
- "High Commission for Pakistan, London" (PDF). www.pakmission-uk.gov.pk.
- "Experts express satisfaction on NJHP progress". Nation.com.pk. 2 November 2016.
- "Archived copy" (PDF). Archived from the original (PDF) on 2013-03-03. Retrieved 2014-04-16.CS1 maint: archived copy as title (link)
- "32,701mw power projects to be completed in 7 years". Nation.com.pk. 2 December 2013.
- "Archived copy" (PDF). Archived from the original (PDF) on 2012-05-11. Retrieved 2014-03-24.CS1 maint: archived copy as title (link)
- "Tractebel to lead JV for Harpo River hydro project, Pakistan - International Water Power". www.waterpowermagazine.com.
- "Private Power & Infrastructure Board". Ppib.gov.pk. 2014-10-16. Retrieved 2018-07-17.
- "Ranolia HPP - The Progress of PTI in KPK". kpkprogress.wordpress.com.
- "KP Govt to construct three small dams in Karak, Nowshera". Samaa.tv.
- "Power Sector - The Progress of PTI in KPK". kpkprogress.wordpress.com.
- "Hydroelectric power: Investor that quotes lowest tariff will win project bid - The Express Tribune". Tribune.com.pk. 29 October 2016.
- "PakistanIndependentNewsAgency-PakistanPressInternational". ppinewsagency.com. Archived from the original on 2014-03-17. Retrieved 2014-03-17.
- Naqash, Tariq (31 January 2016). "AJK, Wapda to sign Neelum power accord". Dawn.com.
- "Water Vision 2016 ignores Katzarah". www.thenews.com.pk.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.