Kampung Selamat MRT station

The Kampung Selamat station is a mass rapid transit (MRT) station serving the areas of Kampung Selamat and Kampung Baru Sungai Buloh in Sungai Buloh, Selangor, Malaysia. The station is one of the stations on the MRT Sungai Buloh-Kajang Line and was opened on 16 December 2016 under Phase One operations of the line.[1]

 SBK02   SSP03 
Kampung Selamat
Rapid transit station
Platform level of the station.
Other names甘榜士拉玛 (Chinese)
கம்புங் சேலாபாய் (Tamil)
LocationSungai Buloh, Selangor
Malaysia
Coordinates3°11′50.53″N 101°34′42.33″E
Owned byMRT Corp
Operated byRapid Rail
Line(s)9 Kajang Line
12 Putrajaya Line (Future)
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
ParkingNot available
Bicycle facilitiesNot available
Other information
Station code SBK02   SSP03 
History
Opened16 December 2016
Services
Preceding station     Following station
Terminus
Sungai Buloh-Kajang Line
towards Kajang
Terminus
Sungai Buloh-Serdang-Putrajaya MRT Line
(under construction)
towards Putrajaya Sentral (under construction)

The station name is taken from the nearby Kampung Selamat (English: Safe Village) which lies on the east side of Jalan Sungai Buloh.

Although currently a station on the MRT Sungai Buloh-Kajang Line, the station will be one of three which will be transferred to the MRT Sungai Buloh-Serdang-Putrajaya Line when it begins operations in 2021.[2]

Station features

Station location

The station is an elevated station located on the east side of Jalan Sungai Buloh. The design of the station is the standard elevated station design comprising two levels above the ground level. The first level is the concourse level, the two side platforms flanking the double tracks above.

The station features a long pedestrian bridge over Jalan Sungai Buloh and Jalan Welfare, linking the stations to its two entrances as well as the future link bridges directly into the SqWhere and D'sara Sentral developments.

Station layout

L2 Platform Level Side platform
Platform 1 9 Kajang Line towards Kajang  SBK35  (→)
Platform 2 9 Kajang Line towards Sungai Buloh  SBK01  (←)
Side platform
L1 Concourse Faregates to paid area, ticketing machines, customer service office, station control, shops, entrance A escalator down to ground level, pedestrian bridge across Jalan Sungai Buloh linking SqWhere and D'sara Sentral developments as well as entrance C staircase down to Jalan Welfare and entrance B escalators/lifts/stairs down to feeder bus terminal
G Ground Level Taxi lay-by, Kiss and ride lay-by, staff parking, feeder bus terminal across Jalan Sungai Buloh at Entrance B

Exits and entrances

The station has three entrances, with Entrance A on the same side of Jalan Sungai Buloh as the station, and Entrances B and C as well as the future link bridges to the SqWhere SOVO, a mixed development project by Selangor Dredging Berhad which is currently under construction, and D'sara Sentral developments, a soon to be completed mixed development project by the Mah Sing Group, on the other side of Jalan Sungai Buloh from the station and linked via a long pedestrian bridge.

Kajang Line station
Entrance Location Destination Picture
A East side of Jalan Sungai Buloh Feeder bus stop, taxi and private vehicle lay-by
B West side of Jalan Sungai Buloh Feeder bus stop, taxi and private vehicle lay-by
C South side of Jalan Welfare Taxi and private vehicle lay-by
Pedestrian bridge to D'sara Sentral (not opened) D'sara Sentral
Pedestrian bridge to SqWhere (future) SqWhere SOVO

Feeder Bus Services

With the opening of the MRT Sungai Buloh-Kajang Line, feeder buses also began operating linking the station with Kampung Baru Sungai Buloh. The feeder buses operate from the station's feeder bus hub accessed via Entrance B across Jalan Sungai Buloh from the station via a pedestrian bridge.

Route No. Origin Desitination Via
T104[3]  SBK02  Kampung Selamat station
Entrance B
Kampung Baru Sungai Buloh Jalan Welfare

Jalan Perkhidmatan
Jalan Besar

Sungai Buloh District Police Headquarters
Jalan Kati U19/F

References

  1. "Prime Minister Launches Phase One of the MRT Sungai Buloh-Kajang Line" (PDF). Mass Rapid Transit Corporation Sdn Bhd. 15 December 2016. Archived from the original (PDF) on 5 March 2017. Retrieved 19 December 2016.
  2. Project information from "Route Map". mymrt.com.my. Archived from the original (PDF) on 27 June 2017. Retrieved 6 December 2017.
  3. RapidKL Route T104
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.