Muhibbah LRT station
Muhibbah LRT station is a Light Rapid Transit station at Kampung Muhibbah, a village about 21 km south of Kuala Lumpur, the capital of Malaysia.[1][2]
SP20 Muhibbah | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Light Rapid Transit station | |||||||||||
Other names | 亲善 (Chinese) நல்லெண்ண (Tamil) | ||||||||||
Location | Kampung Muhibbah, Kuala Lumpur, Malaysia. | ||||||||||
Owned by | Prasarana Malaysia; operated by Rapid Rail. | ||||||||||
Line(s) | 4 Sri Petaling Line | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Available with payment. 230 total parking bays. | ||||||||||
Bicycle facilities | Available, oBike provided in future | ||||||||||
Other information | |||||||||||
Station code | SP20 | ||||||||||
History | |||||||||||
Opened | 31 October 2015 | ||||||||||
Services | |||||||||||
|
Muhibbah station is the nearest station for PPR Kampung Muhibbah and Parklane OUG Service Apartments, although it is a 1.0 km walking distance thru PPR Kampung Muhibbah Block D. It is possible to walk from Muhibbah station to the next station, which is Awan Besar LRT station.
It is operated under the Sri Petaling Line. Like most other LRT stations operating in Klang Valley, this station is elevated.
Design and layout
L2 | ||
Side platform, doors will open on the left | ||
Platform 1 | Sri Petaling Line towards AG1 SP1 Sentul Timur and AG18 Ampang via AG11 SP11 Chan Sow Lin (→) | |
Platform 2 | Sri Petaling Line towards SP31 Putra Heights (←) | |
Side platform, doors will open on the left | ||
L1 | Concourse | Faregates, ticketing machines, station control, escalators and elevators to street levels and car park. |
G | Street Level | Handicapped friendly ramp available. Street entrances are available from both directions of Jalan 4/155, PPR Kampung Muhibbah. |
Bus Services
Route
No. |
Operator | Origin | Destination | Via | Frequency
(Minutes) |
Operating
Hours |
---|---|---|---|---|---|---|
651 | Rapid KL | Muhibbah LRT station | Pasar Seni | Taman OUG | 20 | 6.00am - 11.30pm |
References
- "New Ampang LRT line to begin operations in 2015". Astro Awani. February 27, 2014.
- "Month-long free ride at four new LRT stations - Prasarana". Astro Awani. October 28, 2015.
External links
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.