Titiwangsa station

Titiwangsa station is a rapid transit interchange station Kuala Lumpur, Malaysia, The station is served by the LRT Ampang and Sri Petaling Lines and the KL Monorail Line. The station allows seamless physical and fare integration between the three train lines.

 AG3   SP3   MR11   SSP17 
Titiwangsa
Light rapid transit and Monorail station
Future Rapid transit station
The exterior of the Ampang and Sri Petaling Line's Titiwangsa station's eastern facade.
Other names蒂蒂旺沙 (Chinese)
திடிவன்க்ச(Tamil)
LocationJalan Tun Razak, Titiwangsa, Kuala Lumpur
Malaysia
Coordinates3°10′23″N 101°41′43″E
Owned byPrasarana Malaysia (LRT & Monorail) MRT Corp (MRT)
Operated byRapid Rail
Line(s)3 Ampang Line
4 Sri Petaling Line
8 KL Monorail
12 Putrajaya Line (Under construction)
Platforms2 side platforms (LRT)
2 side platforms (Spanish solution) (Monorail)
1 island platform (MRT)
Tracks2 (LRT)
1 (Monorail)
2 (MRT)
ConnectionsIntegrative station between  AG3   SP3   MR11  and  SSP17  (future) via paid-to-paid linkway.
Construction
Structure type AG3   SP3   MR11  Elevated
 SSP17  Underground
Platform levels4
ParkingNot available
Other information
Station code AG3   SP3   MR11   SSP17 
History
Opened16 December 1996 (LRT)
31 August 2003 (Monorail)
OpeningJuly 2022 {MRT}
Services
Preceding station     Following station
toward Sentul Timur
Ampang Line
toward Ampang
toward Sentul Timur
Sri Petaling Line
towards KL Sentral
KL MonorailTerminus
Sungai Buloh-Serdang-Putrajaya Line
towards Putrajaya Sentral (under construction)

Situated on Jalan Tun Razak (English: Tun Razak Road) in Pekeliling serving district of Titiwangsa. the station is also located beside the Gombak River and an adjoining bus station.

In the future, it will be integrated with the MRT Sungai Buloh-Serdang-Putrajaya Line.[1]

History

Opened in 1998 as part of the former STAR LRT line's second phase of development, the station was intended to connect Titiwangsa to other parts of the city and surrounding areas. Under Phase 2 of the STAR line, a 15 km track with 11 stations was built to serve the northern and southern areas of Kuala Lumpur to cater for the Commonwealth Village and the National Sports Complex in Bukit Jalil, during the 1998 Commonwealth Games in Kuala Lumpur.

Titiwangsa LRT station

The Titiwangsa LRT station is a light rapid transit (LRT) station along the common route of the Ampang Line and Sri Petaling Line for trains travelling south towards Ampang or Putra Heights, or north towards Sentul Timur. Opened in 1998 as part of the former STAR LRT line's second phase of development, the station was intended to connect Titiwangsa to other parts of the city and surrounding areas. The station, like all stations along the northern stretch of the LRT line, is elevated, with platforms located on the top floor and ticketing facilities located on the mid-level concourse.

Titiwangsa Monorail station

The Titiwangsa Monorail station is a later addition in the area that is intended to connect the LRT station with the KL Monorail. The station was constructed over Jalan Tun Razak and was completed in 2003, serving as the northern terminus of KL Monorail, with a buffer stop directly after the station. Like the LRT station, the monorail station sports somewhat similar level designs. The station was constructed with a Spanish solution layout, similar to the KL Sentral Monorail station. The station is one of two KL Monorail stations that is designated as an interchange with the Ampang and Sri Petaling Lines, the other being the Hang Tuah station.

Integrated LRT and Monorail station

Seamless transfer and fare integration was achieved on 1 March 2012 when the "paid-area" or restricted areas of both the LRT and monorail stations, which previously operated as two separate stations, were linked up with a footbridge, allowing passengers to transfer without needing to buy new tokens for the first time since the monorail became operational in 2003.

Titiwangsa MRT station

The Titiwangsa MRT station is a mass rapid transit (MRT) station under construction. It is one of the stations being built as part of the Klang Valley Mass Rapid Transit (KVMRT) project on the Sungai Buloh-Serdang-Putrajaya Line station for the Sungai Buloh–Serdang–Putrajaya MRT line. Upon completion, it will be fully integrated with the LRT and monorail lines. It is planned to open around July 2022.[2]

Station layout


L2 LRT Ampang and Sri Petaling Lines Platform Level Side platform
Platform 1 34 Ampang and Sri Petaling Lines common route towards  AG1  SP1  Sentul Timur (→)
Platform 2 3 Ampang Line towards  AG18  Ampang or 4 Sri Petaling Line towards  SP31  Putra Heights (←)
Side platform
KL Monorail Platform Level Side platform (Spanish solution)
Platform 1 & 2 8 KL Monorail towards  MR1  KL Sentral (←)
Side platform (Spanish solution)
L1 LRT station Concourse Faregates, Ticketing Office, Ticketing Machine, Station Control, Unpaid Area Escalators to/from Street Level
Paid Area Linkway Paid-area Pedestrian Overhead Walkway Linking Concourses of the KL Monorail and LRT Ampang and Sri Petaling Line stations
Monorail Station Concourse Faregates, Ticketing Office, Ticketing Machine, Station Control, Unpaid Area Escalators to/from Street Level
G Street Level Titiwangsa Bus Interchange, Escalators to Monorail and LRT Station Concourses

Around the station

References

  1. "MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit". www.mymrt.com.my. Archived from the original on 2017-06-27. Retrieved 2017-05-29.
  2. "MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit". www.mymrt.com.my. Archived from the original on 2017-05-25. Retrieved 2017-05-29.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.