Line 2 (Hangzhou Metro)
Line 2 of the Hangzhou Metro (Chinese: 杭州地铁二号线; pinyin: Hángzhōu Dìtiě Èr Hào Xiàn) is a north-south rapid transit line, connecting the downtown with the districts of Xiaoshan and Yuhang in Hangzhou.[3][4]
Line 2 | |
---|---|
2 | |
Overview | |
Status | Operating |
Owner | Hangzhou |
Locale | Hangzhou, Zhejiang |
Termini | Chaoyang Liangzhu |
Stations | 33 |
Service | |
Type | Rapid transit |
System | Hangzhou Metro |
Operator(s) | Hangzhou Metro Corporation |
Depot(s) | Shushan Depot Shuangqiao Stabling Yard |
Rolling stock | 6 cars, type B |
Daily ridership | 747,800 (2020 peak) |
History | |
Opened | 24 November 2014[1] |
Technical | |
Line length | 42.85 km (26.63 mi)[2] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Overhead 1500V DC |
Operating speed | 80km/h (50mph) |
The first phase of the line, between Qianjiang Road and Chaoyang stations, entered operation on 24 November 2014 after six years of construction. It was extended to Gucui Road on 3 July 2017, and then to Liangzhu on 27 December in the same year.[4]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Chaoyang — Qianjiang Road | 24 November 2014 | 18.3 km (11.37 mi) | 12 | Phase 1 (southeastern section) |
Qianjiang Century City | 28 April 2016 | Infill station | 1 | |
Qianjiang Road — Gucui Road | 3 July 2017 | 11.3 km (7.02 mi) | 9 | Phase 1 (northwestern section) |
Gucui Road — Liangzhu | 27 December 2017 | 13.32 km (8.28 mi) | 10 | Phase 2 & 3 |
Xianing Bridge | 30 June 2020[5] | Infill station | 1 |
Stations
Station name | Connections | Distance km[6] |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Chaoyang | 朝阳 | 0.00 | 0.00 | Xiaoshan | |
Caojiaqiao | 曹家桥 | 1.34 | 1.34 | ||
Panshui | 潘水 | 1.56 | 2.90 | ||
Renmin Road | 人民路 | 1.18 | 4.08 | ||
Hangfachang | 杭发厂 | 1.31 | 5.39 | ||
People Square | 人民广场 | 5 | 1.16 | 6.55 | |
Jiansheyi Road | 建设一路 | 1.47 | 8.02 | ||
Jianshesan Road | 建设三路 | 7 | 1.15 | 9.17 | |
Zhenning Road | 振宁路 | 1.62 | 10.79 | ||
Feihong Road | 飞虹路 | 1.58 | 12.37 | ||
Yingfeng Road | 盈丰路 | 1.23 | 13.60 | ||
Qianjiang Century City | 钱江世纪城 | 6 | 0.94 | 14.54 | |
Qianjiang Road | 钱江路 | 4 | 3.46 | 18.00 | Jianggan |
Qingchun Square | 庆春广场 | 0.93 | 18.93 | ||
Qingling Road | 庆菱路 | 1.23 | 20.16 | ||
North Jianguo Road | 建国北路 | 5 | 1.47 | 21.63 | Xiacheng |
North Zhonghe Road | 中河北路 | 0.93 | 22.56 | ||
Fengqi Road | 凤起路 | 1 | 0.74 | 23.30 | |
Wulinmen | 武林门 | 1.29 | 24.59 | Xiacheng/Xihu | |
Shentangqiao | 沈塘桥 | 1.28 | 25.87 | Gongshu/Xihu | |
Xianing Bridge | 下宁桥 | 1.15 | 27.02 | Xihu | |
Xueyuan Road | 学院路 | 0.92 | 27.94 | ||
Gucui Road | 古翠路 | 1.11 | 29.05 | ||
Fengtan Road | 丰潭路 | 1.45 | 30.50 | ||
Wenxin | 文新 | 1.29 | 31.79 | ||
Sanba | 三坝 | 5 | 1.16 | 32.95 | |
Xialongwei | 虾龙圩 | 1.19 | 34.14 | ||
Sandun | 三墩 | 1.24 | 35.38 | ||
Dunxiang Street | 墩祥街 | 1.27 | 36.65 | Gongshu | |
Jinjiadu | 金家渡 | 0.93 | 37.58 | Yuhang | |
Baiyang | 白洋 | 1.79 | 39.37 | ||
Dufucun | 杜甫村 | 1.87 | 41.24 | ||
Liangzhu | 良渚 | 1.38 | 42.62 | ||
Notes
References
- 杭州地铁2号线24日试运营 列车全天运行15小时. 杭州地铁网. 2014-11-12.
- "今天17时,地铁2号线全程开通 从头坐到尾只需77分钟". 2017-12-27.
- 杭州地铁2号线铺新轨. December 22, 2012.
- 杭州地铁2号线一期工程. December 11, 2012. Archived from the original on December 15, 2013.
- "明天上午10点,下宁桥站、火车南站站同步开通!". 2020-06-29.
- 中铁第四勘察设计院集团有限公司. 杭州地铁二号线二期工程环境影响报告书简本 (Report).
Wikimedia Commons has media related to Line 2, Hangzhou Metro. |
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.