Line 5 (Hangzhou Metro)

Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line in Hangzhou. The line is colored cyan on system maps.

Line 5
 5 
Train of Line 5 departing The Grand Canal Station
Overview
StatusOperational
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
TerminiYuhang Town
Guniangqiao
Stations40
(38 in service)
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)MTR Corporation (Hangzhou)[1]
Depot(s)Wuchang Depot
Guniangqiao Stabling Yard
Rolling stock6 cars, Type AH
History
Opened24 June 2019 (2019-06-24)[2]
Technical
Line length56.21 km (34.93 mi)[3]
CharacterUnderground
ElectrificationOverhead line, 1,500 V DC
Operating speed80km/h (50mph)

Opening timeline

SegmentCommencementLengthStation(s)Name
Liangmu Road — Shanxian 24 June 2019 12 Phase 1 (initial section)
Shanxian — Guniangqiao 23 April 2020 21 Phase 1 (final section)
Jinxing — Liangmu Road 23 April 2020 4 Phase 2
South Railway Station[4] 30 June 2020 Infill station 1

Stations

Station name Connections Distance
km
Location
English Chinese
Yuhang Town 老余杭 Yuhang
Jinxing 金星
Lvting Road 绿汀路  16 
Gexiang 葛巷
Chuangjing Road 创景路
Liangmu Road 良睦路
Cangqian Campus Hangzhou Normal University 杭师大仓前
Yongfu 永福
Wuchang 五常
Jiangcun 蒋村 Xihu
Zijingang Campus Zhejiang University 浙大紫金港
Sanba 三坝  2 
Pingshui Street 萍水街 Gongshu
Hemu 和睦
The Grand Canal 大运河
East Gongchen Bridge 拱宸桥东
Shanxian 善贤
Xiwen Street 西文街 Xiacheng
Xiangjisi Road 香积寺路
Hangyang 杭氧
Datieguan 打铁关  1 
Baoshan Bridge 宝善桥
North Jianguo Road 建国北路  2 
Wan'an Bridge 万安桥 Shangcheng
Chengzhan 城站  1 
Hangzhou
Jiangcheng Road 江城路
Houchaomen 候潮门
Nanxingqiao 南星桥  4 
Changhe 长河  6  Binjiang
Jucai Road 聚才路
Jianghui Road 江晖路
Binkang Road 滨康路  1 
Bo'ao Road 博奥路 Xiaoshan
Jinji Road 金鸡路
People Square 人民广场  2 
North Yucai Road 育才北路
Middle Tonghui Road 通惠中路
South Railway Station 火车南站 Hangzhounan
 Shaoxing TNT 
Shuangqiao 双桥
Guniangqiao 姑娘桥

Description

Phase 1 of the line is 48.6 km (30.2 mi) long with 36 stations and will run between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (through operation to Line 1 of the neighboring Shaoxing Metro).[5] Phase 2 of the line further extends 3.2 km and two stations east to Lvting Road.[6] A 5 km (3.1 mi), two station extension west to Laoyuhang station in Yuhang District started construction in 2018.[7]

Rolling stock

The line uses higher capacity six car Type AH trains which are 20cm wider than the Type B trains used in other Hangzhou Metro lines, increasing capacity by about 10%.[8]

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.