Line 5 (Hangzhou Metro)
Line 5 of the Hangzhou Metro (simplified Chinese: 杭州地铁五号线; traditional Chinese: 杭州地鐵五號線; pinyin: Hángzhōu Dìtiě Wǔhào Xiàn) is a subway line in Hangzhou. The line is colored cyan on system maps.
Line 5 | |
---|---|
5 | |
Overview | |
Status | Operational |
Owner | City of Hangzhou |
Locale | Hangzhou, Zhejiang, China |
Termini | Yuhang Town Guniangqiao |
Stations | 40 (38 in service) |
Service | |
Type | Rapid transit |
System | Hangzhou Metro |
Services | 1 |
Operator(s) | MTR Corporation (Hangzhou)[1] |
Depot(s) | Wuchang Depot Guniangqiao Stabling Yard |
Rolling stock | 6 cars, Type AH |
History | |
Opened | 24 June 2019[2] |
Technical | |
Line length | 56.21 km (34.93 mi)[3] |
Character | Underground |
Electrification | Overhead line, 1,500 V DC |
Operating speed | 80km/h (50mph) |
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Liangmu Road — Shanxian | 24 June 2019 | 12 | Phase 1 (initial section) | |
Shanxian — Guniangqiao | 23 April 2020 | 21 | Phase 1 (final section) | |
Jinxing — Liangmu Road | 23 April 2020 | 4 | Phase 2 | |
South Railway Station[4] | 30 June 2020 | Infill station | 1 |
Stations
Station name | Connections | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Yuhang Town | 老余杭 | Yuhang | ||||
Jinxing | 金星 | |||||
Lvting Road | 绿汀路 | 16 | ||||
Gexiang | 葛巷 | |||||
Chuangjing Road | 创景路 | |||||
Liangmu Road | 良睦路 | |||||
Cangqian Campus Hangzhou Normal University | 杭师大仓前 | |||||
Yongfu | 永福 | |||||
Wuchang | 五常 | |||||
Jiangcun | 蒋村 | Xihu | ||||
Zijingang Campus Zhejiang University | 浙大紫金港 | |||||
Sanba | 三坝 | 2 | ||||
Pingshui Street | 萍水街 | Gongshu | ||||
Hemu | 和睦 | |||||
The Grand Canal | 大运河 | |||||
East Gongchen Bridge | 拱宸桥东 | |||||
Shanxian | 善贤 | |||||
Xiwen Street | 西文街 | Xiacheng | ||||
Xiangjisi Road | 香积寺路 | |||||
Hangyang | 杭氧 | |||||
Datieguan | 打铁关 | 1 | ||||
Baoshan Bridge | 宝善桥 | |||||
North Jianguo Road | 建国北路 | 2 | ||||
Wan'an Bridge | 万安桥 | Shangcheng | ||||
Chengzhan | 城站 | 1 Hangzhou |
||||
Jiangcheng Road | 江城路 | |||||
Houchaomen | 候潮门 | |||||
Nanxingqiao | 南星桥 | 4 | ||||
Changhe | 长河 | 6 | Binjiang | |||
Jucai Road | 聚才路 | |||||
Jianghui Road | 江晖路 | |||||
Binkang Road | 滨康路 | 1 | ||||
Bo'ao Road | 博奥路 | Xiaoshan | ||||
Jinji Road | 金鸡路 | |||||
People Square | 人民广场 | 2 | ||||
North Yucai Road | 育才北路 | |||||
Middle Tonghui Road | 通惠中路 | |||||
South Railway Station | 火车南站 | Hangzhounan Shaoxing TNT |
||||
Shuangqiao | 双桥 | |||||
Guniangqiao | 姑娘桥 | |||||
Description
Phase 1 of the line is 48.6 km (30.2 mi) long with 36 stations and will run between Central Park station in Yuhang District and Xiangzhang Road station in Xiaoshan District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system including Hangshao line (through operation to Line 1 of the neighboring Shaoxing Metro).[5] Phase 2 of the line further extends 3.2 km and two stations east to Lvting Road.[6] A 5 km (3.1 mi), two station extension west to Laoyuhang station in Yuhang District started construction in 2018.[7]
Rolling stock
The line uses higher capacity six car Type AH trains which are 20cm wider than the Type B trains used in other Hangzhou Metro lines, increasing capacity by about 10%.[8]
References
- "MTR : Concession Agreement for Hangzhou Metro Line 5 Signed". marketscreener.com. Retrieved 27 February 2019.
- http://hangzhou.zjol.com.cn/jrsd/bwzg/201906/t20190624_10400959.shtml
- "杭州地铁5号线后通段、16号线计划4月底通车". 2020-03-27. Retrieved 2020-04-19.
- "明天上午10点,下宁桥站、火车南站站同步开通!". 2020-06-29.
- "杭州地铁5号线开工 余杭未来科技城3个车站率先建 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Archived from the original on 2014-12-20. Retrieved 2019-02-06.
- "运营中的杭州地铁1号线底下 5号线悄悄穿过 - 杭州网 - 杭州新闻中心". hznews.hangzhou.com.cn. Retrieved 2019-02-06.
- "地铁5号线确定向西延伸 期待明年完工". zj.zjol.com.cn. Retrieved 2019-02-06.
- "杭州地铁5号线"小青"已抵达杭州 预计今年年底开通 - 杭网原创 - 杭州网". ori.hangzhou.com.cn. Retrieved 2019-02-06.