Line 3 (Hangzhou Metro)
Line 3 of the Hangzhou Metro (simplified Chinese: 杭州地铁三号线; traditional Chinese: 杭州地鐵三號線; pinyin: Hángzhōu Dìtiě Sānhào Xiàn) is a subway line under construction.[2][3] The line will be 57.5 km long[1] and will run in a southwest-northeast direction between Wushan Qiancun station in Yuhang District and Xingqiao Road station in Yuhang District in the east, passing through downtown Hangzhou and providing transfers with multiple other lines in the system. Phase 1 of the line is expected to be operational by 2022.[1] The line will use higher capacity six car type AH subway cars.[4]
Line 3 | |
---|---|
3 | |
Overview | |
Status | Under construction |
Owner | City of Hangzhou |
Locale | Hangzhou, China |
Termini | Xingqiao Road Wushan Qiancun / Xiaoheshan |
Stations | 39[1] |
Service | |
Type | Rapid transit |
System | Hangzhou Metro |
Services | 2 |
Operator(s) | Hangzhou Metro Corporation |
Depot(s) | Xingqiao Depot Xiaoheshan Stabling Yard Cangqian Depot |
Rolling stock | 6 cars, type AH |
History | |
Planned opening | 2022 |
Technical | |
Line length | 57.5 km (35.73 mi)[1] |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Electrification | Overhead, 1,500 V DC |
Operating speed | 80km/h (50mph) |
Service routes
- Wushan Qiancun — Xingqiao Road
- Xiaoheshan — Xingqiao Road
Stations
Service routes |
Station name | Connections | ||||||
---|---|---|---|---|---|---|---|---|
English | Chinese | |||||||
● | Xiaoheshan | 小和山 | ||||||
● | Zhejiang University of Science and Technology | 科技学院 | ||||||
● | Zhejiang University of Technology | 工业大学 | ||||||
● | Liuxia | 留下 | ||||||
● | | | Wushan Qiancun[5] | 吴山前村 | |||||
● | | | Liuxiang Road[5] | 留祥路 | |||||
● | | | West Railway Station[5] | 杭州西站 | Airport | ||||
● | | | Longzhou Road[5] | 龙舟路 | |||||
● | | | West Wenyi Road | 文一西路 | |||||
● | | | Lvting Road | 绿汀路 | 5 16 | ||||
● | | | Chuangyuan Road | 创远路 | |||||
● | | | Liangmu Road | 良睦路 | |||||
● | | | Gaojiao Road | 高教路 | |||||
● | | | Liansheng Road | 联胜路 | |||||
● | | | Fangxi Road | 访溪路 | |||||
● | ● | Baijiayuan Road | 百家园路 | |||||
● | ● | Huawu Road | 花坞路 | |||||
● | ● | West Coach Terminal | 汽车西站 | |||||
● | ● | Gudun Road | 古墩路 | |||||
● | ● | Gudang Xincun | 古荡新村 | |||||
● | ● | Gudang | 古荡 | |||||
● | ● | Yugu Road | 玉古路 | 10 | ||||
● | ● | Songmuchang | 松木场 | |||||
● | ● | Wulinmen | 武林门 | 2 | ||||
● | ● | Wulin Square | 武林广场 | 1 | ||||
● | ● | West Lake Cultural Square | 西湖文化广场 | 1 Airport | ||||
● | ● | Chaowang Road | 潮王路 | |||||
● | ● | Xiangjisi Road | 香积寺路 | |||||
● | ● | Daguan | 大关 | |||||
● | ● | Shanxian | 善贤 | 5 | ||||
● | ● | East Dongxin Road | 东新东路 | 4 | ||||
● | ● | Kangning Road | 康宁路 | |||||
● | ● | Huafeng Road | 华丰路 | |||||
● | ● | Tongxie Road | 同协路 | |||||
● | ● | Jianding Road | 笕丁路 | |||||
● | ● | Dingqiao | 丁桥 | |||||
● | ● | Tianfeng Road | 天丰路 | |||||
● | ● | Tianducheng | 天都城 | |||||
● | ● | Xingqiao Road | 星桥路 | |||||
See also
References
- "杭州地铁3号线最新进展:一期工程香积寺路站主体结构封顶 全线预计2021年年底建成". 2019-10-30.
- "杭州地铁3号线一期年底开工". ZJNews. 14 July 2017.
- "工可报告通过评审 地铁3号线一期"上马在即" 预计今年开工,力争亚运会前建成". Hangzhou Daily. 2 March 2017.
- "省发展改革委关于杭州地铁3号线一期工程初步设计的批复". www.zjdpc.gov.cn. Archived from the original on 2018-02-10. Retrieved 2019-02-08.
- "杭州地铁3号线一期工程调整环境影响评价信息公示". Hangzhou Metro. 2019-10-30.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.