Line 8 (Hangzhou Metro)
Line 8 of the Hangzhou Metro (simplified Chinese: 杭州地铁八号线; traditional Chinese: 杭州地鐵八號線; pinyin: Hángzhōu Dìtiě Bāhào Xiàn) is a subway line under construction.[3] The line will be 17.17 km long and will run in a west–east direction between South Wenhai Road in Xiasha District and Xinwan Road Station in Dajiangdong Industrial Cluster.[4] The line is expected to be operational by mid-2021.[5]
Line 8 | |
---|---|
8 | |
Overview | |
Status | Under construction |
Owner | City of Hangzhou |
Locale | Hangzhou, China |
Termini | South Wenhai Road Xinwan Road[1] |
Stations | 9 |
Service | |
Type | Rapid transit |
System | Hangzhou Metro |
Services | 1 |
Operator(s) | Hangzhou Metro Corporation |
Depot(s) | Xinwan Depot |
Rolling stock | 6 cars, type A |
History | |
Planned opening | 2021[2] |
Technical | |
Line length | 17.17km |
Character | Underground |
Electrification | Overhead, 1,500 V DC |
Operating speed | 100km/h (62mph) |
Stations
Station name | Connections | ||
---|---|---|---|
English | Chinese | ||
South Wenhai Road | 文海南路 | 1 | |
Zhejiang Gongshang University | 浙江工商大学 | ||
Qiaotoubao | 桥头堡 | ||
Hezhuang | 河庄 | ||
Hejing Road | 河景路 | ||
Middle Qingliu Road | 青六中路 | 7 | |
Qingpeng Road | 青蓬路 | ||
Yipeng Dong'er Road | 义蓬东二路 | ||
Xinwan Road | 新湾路 | ||
See also
References
- "杭州地铁6号线、8号线初步设计获批 具体站点信息首次披露". zjol.com. 7 March 2018.
- "杭州地铁6号线、8号线初步设计获批 具体站点信息首次披露". zjol.com. 7 March 2018.
- "地铁8号线下沙段一期交改顺利完成". http://www.hzmetro.com. External link in
|publisher=
(help) - "杭州地铁6号线、8号线初步设计获批 具体站点信息首次披露". zjol.com. 7 March 2018.
- "Hangzhou Subway expansion". APT News Channel. 23 February 2017.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.