Line 10 (Hangzhou Metro)

Line 10 of the Hangzhou Metro (simplified Chinese: 杭州地铁十号线; traditional Chinese: 杭州地鐵十號線; pinyin: Hángzhōu Dìtiě Shíhào Xiàn) is a subway line under construction. The line will be 15.2 km (9.4 mi) long and will run between Zhejiang University station in Xihu District and Xinxing Road station in Yuhang District up in the north, passing through west Hangzhou. Phase 1 of the line is expected to be operational by end of 2021.

Line 10
 10 
Overview
StatusUnder construction
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang
TerminiZhejiang University
Yisheng Road
Stations13
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Renhe Depot
Rolling stock6 cars, type A
History
Planned opening2021
Technical
Line length15.18km
CharacterUnderground
ElectrificationOverhead, 1,500 V DC
Operating speed80km/h (50mph)
Line 10 drawn to scale.

Stations

Station name Connections
English Chinese
Zhejiang University 浙大
Yugu Road 玉古路  3 
Wensan Road 文三路  Airport 
Xueyuan Road 学院路  2 
Cuibai Road 翠柏路
Yinxiu Road 隐秀路
Hemu 和睦  5 
North Coach Station 汽车北站
Exhibition and Convention Center 国际会展中心
Xiangyuan Road 祥园路
Hangxing Road 杭行路  4 
Wujia Road 吴家路
Yisheng Road 逸盛路  Deqing 

References

    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.