Line 5 (Guangzhou Metro)

Line 5 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Jiaokou running 31.9 km (19.8 mi) in a wide "∩" shape and ends at Wenchong. Like line 4 and 6 it's equipped with linear induction motor technology. Line 5's color is red. Huangpu Line began operation on 28 December 2009, from Jiaokou to Wenchong. As of May 2017, Line 5 carries an average of 1.05 million passengers per day and is extremely congested throughout the day, operating at over 100% capacity during rush hours.[4][5] The opening of Phase I of Line 13 further increased traffic demand on the west end of Line 5 and pushing congestion to over 130% capacity.[6] Prompting the Guangzhou Metro to limit passenger traffic at a number of subway stations on Line 5.[6] In the future Line 13 Phase II will provide relief for Line 5.

Line 5
 5 
Line 5 train near Tanwei
Overview
Other name(s)L2 (5 lines plan name)
M3 (7 lines plan name)
M5 (2000 plan name)
Huanshilu line (环市路线)
StatusOperational
OwnerCity of Guangzhou
LocaleHuangpu, Tianhe, Yuexiu, and Liwan districts
Guangzhou, Guangdong
TerminiJiaokou
Wenchong
Stations24
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Rolling stockCRRC Qingdao Sifang/Kawasaki Heavy Industries Metro cars[1]
Daily ridership1.09 million (2017 daily average)[2]
1.367 million (2015 Peak)[3]
History
Opened28 December 2009 (2009-12-28)
Technical
Line length31.9 km (19.82 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationThird rail, 1,500 V DC
(Overhead lines with same voltage installed in depot)
Route map

Proposed extension
Huangpu Ferry Terminal
( 8 )
Lujiao Creek
Huangpu Industrial Zone
 13  to Xinsha
Xiayuan
 13 
Longtoushan
Shuanggang
Proposed extension
Wenchong
Dashadong
( 7 )
 7 
to Shuixibei
to Guangzhou South Railway Station
Dashadi
Huangpu railway
Yuzhu
 13 
 13  to Chaoyang
Yuzhu Depot
Sanxi
Dongpu
connection to Line 4
Chebeinan
 4 
 4 
to Huangcun
to Nansha Passenger Port
Keyun Lu
Yuancun
 21 ( 11  before 2022)
 21 
to Zengcheng Square
Tancun
( 19 )
Liede
Zhujiang New Town
 3 
 3 
to Tianhe Coach Terminal
to Panyu Square
Wuyangcun
( 10  Siyou Xinma Lu)
Yangji Stream
Yangji
 1 
 1 
to Guangzhou East Railway Station
to Xilang
Zoo
 6  to Xiangxue
Ouzhuang
 6 
Taojin
 6 
Xiaobei
Guangzhou Railway Station
 2  ( 11   14 )
 2 
to Jiahewanggang
to Guangzhou South Railway Station
Xicun
( 8 )
 8 
to Jiaoxin
to Wanshengwei
Xichang
( 13 )
 13 
to Chaoyang
to Xinsha
Sima Creek
Zhongshanba
( 11 )
 6 
Tanwei
 6 
connection to Line 6
 6  to Xunfenggang
Jiaokou
( 5 )
Guangmao railway
Line 5
Simplified Chinese广州地铁5号线
Traditional Chinese廣州地鐵5號線

Opening timeline

Line 5 drawn to scale.
SegmentCommencementLengthStation(s)Name
Jiaokou — Wenchong 28 December 2009 31.9 km (19.82 mi) 24 (initial phase)

Stations

Station
No.
Station name Connections Distance
km
Location
English Chinese
5 01 Jiaokou 滘口 0.00 0.00 Liwan
5 02 Tanwei 坦尾  6  1.75 1.75
5 03 Zhongshanba 中山八 1.54 3.29
5 04 Xichang 西场 1.53 4.82
5 05 Xicun 西村  8  0.68 5.50
5 06 Guangzhou Railway Station 广州火车站  2 

 14   GS  GZQ

1.58 7.08 Yuexiu
5 07 Xiaobei 小北 2.40 9.48
5 08 Taojin 淘金 1.10 10.58
5 09 Ouzhuang 区庄  6  1.03 11.61
5 10 Zoo 动物园 1.09 12.70
5 11 Yangji 杨箕  1  1.05 13.75
5 12 Wuyangcun 五羊邨 1.06 14.81
5 13 Zhujiang New Town 珠江新城  3  0.76 15.57 Tianhe
5 14 Liede 猎德 1.15 16.72
5 15 Tancun 潭村 1.44 18.16
5 16 Yuancun 员村  21  1.79 19.95
5 17 Keyun Lu 科韵路 1.55 21.50
5 18 Chebeinan 车陂南  4  1.37 22.87
5 19 Dongpu 东圃 1.37 24.24
5 20 Sanxi 三溪 1.55 25.79
5 21 Yuzhu 鱼珠  13  1.79 27.58 Huangpu
5 22 Dashadi 大沙地 1.55 29.13
5 23 Dashadong 大沙东 1.33 30.46
5 24 Wenchong 文冲 1.19 31.65

Future Development

An eastern extension to Huangpu Passenger Port is currently under construction with opening scheduled in 2023. It is 9.76km long and with seven stations.[7][8]

Station
no.
Station name Connections Distance
km
Location
English Chinese
5 25 Shuangsha 双沙 Huangpu
5 26 Miaotou Lu 庙头路
5 27 Xiayuan 夏园  13  GBRT
5 28 Baoying Dadao 保盈大道
5 29 Guangzhou Development Zone 广州开发区
5 30 Huangpu Passenger Port 黄埔客运港  1  (Planned)

Rolling Stock

Line 5 uses six car linear motor trains. In 2020, Guangzhou Metro started bidding for 14 additional trains.[9]

Type Time of manufacturing Series Sets Assembly Notes
Type L 2008–2010 L2 30 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang[10]
Type L 2011–2013 L4 32 Mcp+M+Mp+M+M+Mcp Manufactured by CRRC Qingdao Sifang

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.