Line 7 (Guangzhou Metro)

Line 7 of the Guangzhou Metro runs across Panyu District. Line 7's color is light green. Line 7 is envisioned as tangential line that runs across southeast Guangzhou and Foshan, allowing for orbital traffic between the suburbs of Shunde, Panyu and Huangpu to avoid the crowded city center stations. The first phase opened on December 28, 2016 and starts at Guangzhou South Railway Station and ends at Higher Education Mega Center South. It has interchanges with Line 2 at Guangzhou South Railway Station and Shibi, Line 3 at Hanxi Changlong, and Line 4 at Higher Education Mega Center South and a total length is 18.6 km (11.6 mi) with 10 stations. The plan for west extension of the first phase from Guangzhou South Railway Station to Meidi Dadao in Shunde District, Foshan was approved in October, 2015. The construction of the west extension to Shunde began in June 2016.[2] The west extension is expected to be operational in 2021.[3][4] The Northern extension to Shuxi will start construction in 2018. The extension will add 22 km (14 mi) of line with 11 additional stations and will open in 2022.[5]

Line 7
 7 
Platform of Yuangang
Overview
Other name(s)M7 (plan name)
Panyu line (番禺线)
StatusOperating
OwnerCity of Guangzhou
LocaleGuangzhou (Panyu District)
Guangdong
TerminiGuangzhou South Railway Station
Higher Education Mega Center South
Stations15
Service
TypeRapid transit
SystemGuangzhou Metro
Services1
Operator(s)Guangzhou Metro Corporation
Daily ridership163,200 (2017 daily average)[1]
History
OpenedDecember 28, 2016 (2016-12-28)
Technical
Line length18.6 km (11.6 mi)
Track gauge1,435 mm (56.5 in)
Route map

Shuixi North
Shuixi
( 21 )
 21 
to Yuancun
to Zengcheng Square
Luogang
 6 
 6 
to Xunfenggang
to Xiangxue
Kaifeng Lu
Jiazhuang
Jitang
( 19 )
Dashadong
 5 
 5 
to Jiaokou
to Wenchong
Yufengwei
 13 
 13 
to Yuzhu
to Xinsha
Hongshengsha
Changzhou
( 8 )
 8 
to Guangzhou North Railway Station
to Haibang / Huangpu Passenger Port
Shenjing
Phase 2
connection to Line 4
 4  to Huangcun
Higher Education
Mega Center South
 4  ( 12 )
Lijiao Creek
 4  to Nansha Passenger Port
Banqiao
Yuangang
Nancun Wanbo
( 18 )
 18 
to Guangzhou East Railway Station
to Wanqingsha
Hanxi Changlong
 3 
 3 
to Tianhe Coach Terminal
to Panyu Square
Zhongcun
Xiecun
 2  to Jiahe Wanggang
Shibi
 2 
 22 
to Bai'etan
to Wanqingsha
GZ South Railway Station
 2  ( 22 ) 2 )
 2  to Nanzhuang
Dazhou Yard (Line 2)
Dazhou Depot (Line 7)
Western extension
Western extension
Weichong
Chencunbei
Chencun
Chencun New Town
Nanyong
Lintou
 3  to
Shishan Education
Mega Center
Beijiao New Town
 3 
 3  to Ronggui
Meidi Dadao
Yifeng Yard
Line 7
Simplified Chinese广州地铁7号线
Traditional Chinese廣州地鐵7號線
Map of Line 7 drawn to scale with the first and western sections

Opening timeline

SegmentCommencementLengthStation(s)Name
Guangzhou South — HEMC South 28 December 2016 18.6 km (11.56 mi) 9 Phase 1

Stations

Station
Station name Connections Distance
km
Location
English Chinese
7 01 Guangzhou South Railway Station 广州南站  2   GZ   GSH  IZQ 0.00 0.00 Panyu
7 02 Shibi 石壁  2  1.18 1.18
7 03 Xiecun 谢村 1.98 3.16
7 04 Zhongcun 钟村 2.18 5.34
7 05 Hanxi Changlong 汉溪长隆  3  1.69 7.03
7 06 Nancun Wanbo 南村万博  18  2.15 9.18
7 07 Yuangang 员岗 2.43 11.61
7 08 Banqiao 板桥 2.25 13.86
7 09 Higher Education Mega Center South 大学城南  4  3.55 17.41

Western

  • Under construction
Station
Name Connections Location
English Chinese
Meidi Dadao 美的大道 Shunde
(Foshan)
Beijiao New Town 北滘新城  3 
Lintou 林头
Nanyong 南涌
Chencun New Town 陈村新城
Chencun 陈村
Chencunbei 陈村北
Weichong 韦涌 Panyu
(Guangzhou)

Eastern

  • Under construction
Station
Name Connections Location
English Chinese
Shenjing 深井 Huangpu
(Guangzhou)
Changzhou 长洲
Hongshengsha 洪圣沙
Yufengwei 裕丰围  13 
Dashadong 大沙东  5 
Jitang 姬堂
Jiazhuang 加庄
Kefeng Lu 科丰路
Luogang 萝岗  6 
Shuixi 水西  21 
Shuixibei 水西北

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.