Line 6 (Guangzhou Metro)

Line 6 of the Guangzhou Metro runs from Liwan District to Huangpu District. It starts at Xunfenggang and ends at Xiangxue, interchanging with Line 5 at Tanwei and Ouzhuang; Line 1 at Huangsha and Dongshankou; Line 8 at Cultural Park; Line 2 at Haizhu Square; Line 21 at Suyuan; Line 3 at Yantang and Tianhe Coach Terminal. The total length is 41.9 km (26.0 mi) with 32 stations. Line 6 serves densely populated areas including residential communities in Jinshazhou, the pedestrian street in Beijing Lu and wholesale markets in Shahe. Nevertheless, Line 6, which runs four-car trains, has long had a questionable train capacity. The phase one section between Xunfenggang and Changban began to provide service from 28 December 2013 with the exception of Yide Lu and Shahe stations.[4] Yide Lu opened over a year later on 28 January 2015. The second phase of Line 6 from Changban to Xiangxue has been in operation since 28 December 2016. Like Lines 4 and 5, Line 6 is equipped with linear induction motor technology. Line 6's color is maroon

Line 6
 6 
Platform of Xunfenggang
Overview
Other name(s)M7 (7 lines plan name)
M6 (2000 plan name)
Luogang line (萝岗线)
StatusOperational
OwnerCity of Guangzhou
LocaleHuangpu, Tianhe, Yuexiu, Liwan, and Baiyun districts
Guangzhou, Guangdong
TerminiXunfenggang
Xiangxue
Stations32
Service
TypeRapid transit
SystemGuangzhou Metro
Services2
Operator(s)Guangzhou Metro Corporation
Rolling stockCRRC Qingdao Sifang/Kawasaki Heavy Industries Metro cars[1]
Daily ridership850,000 (2018 Avg.)[2]
1.053 million (2017 Peak)[3]
History
OpenedDecember 28, 2013 (2013-12-28)
Technical
Line length41.7 km (25.9 mi)
CharacterUnderground/Elevated (Three stations)
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationThird rails, 1,500 V DC
Route map

future extension
Luogang Depot
Xiangxue
Luogang
( 7 )
 7 
to Shuixibei
to Guangzhou South Railway Station
connection to Line 21
Suyuan
 21 
 21 
to Zengcheng Square
to Yuancun
Xiangang
Jinfeng
Huangbei
Gaotangshi
Kemulang
Longdong
Botanical Garden
future route split
Changban
Tianhe Coach Terminal
 3  before 2022 ( 10  after 2022)
 3  to Airport North
Yantang
 3 
 3  to Panyu Square
Tianpingjia
Shahe
( 11 )
Shaheding
Huanghuagang
 5  to Wenchong
Ouzhuang
 5 
 1  to
Guangzhou East
Railway Station
Dongshankou
 1 
Donghu
( 10   12 )
Tuanyida Square
Beijing Lu
Haizhu Square
 2 
 2 
to Jiahewanggang
to Guangzhou S Railway Station
Yide Lu
Cultural Park
 8 
 8 
to Jiaoxin
to Wanshengwei
Huangsha
 1 
 1  to Xilang
Ruyifang
( 11 )
Guangmao railway
Tanwei
 5 
connection to Line 5
 5  to Jiaokou
Hesha
Baisha River
Shabei
Hengsha
Beihuan Expressway
Xunfenggang
( 12 )
Xunfenggang Yard
Line 6
Simplified Chinese广州地铁6号线
Traditional Chinese廣州地鐵6號線

Opening timeline

Line 6 drawn to scale.
SegmentCommencementLengthStation(s)Name
Xunfenggang — Changban 28 December 2013 24.5 km (15.22 mi) 20 Phase 1
Yide Lu 28 January 2015 Infill station 1
Changban — Xiangxue 28 December 2016 17.2 km (10.69 mi) 8 Phase 2
Botanical Garden, Kemulang 28 June 2017 Infill stations 2

Station listing

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
6 01 Xunfenggang 浔峰岗 0.00 0.00 Baiyun
6 02 Hengsha 横沙 0.87 0.87
6 03 Shabei 沙贝 0.81 1.68
6 04 Hesha 河沙 2.21 1.89 Liwan
6 05 Tanwei 坦尾  5  1.09 2.98
6 06 Ruyifang 如意坊 1.86 4.84
6 07 Huangsha 黄沙  1  1.19 6.03
6 08 Cultural Park 文化公园  8  0.85 6.88
6 09 Yide Lu 一德路 0.95 7.83 Yuexiu
6 10 Haizhu Square 海珠广场  2  0.95 8.78
6 11 Beijing Lu 北京路 0.56 9.34
6 12 Tuanyida Square 团一大广场 0.83 10.17
6 13 Donghu 东湖 1.15 11.32
6 14 Dongshankou 东山口  1  1.36 12.68
6 15 Ouzhuang 区庄  5  1.10 13.78
6 16 Huanghuagang 黄花岗 1.07 14.85
6 17 Shaheding 沙河顶 0.97 15.82 Tianhe
6 18 Shahe 沙河 1.03 16.85
6 19 Tianpingjia 天平架 1.10 17.95
6 20 Yantang 燕塘  3  0.64 18.59
6 21 Tianhe Coach Terminal 天河客运站  3  2.21 20.80
6 22 Changban 长湴 0.99 21.79
6 23 Botanical Garden 植物园 1.89 23.68
6 24 Longdong 龙洞 1.74 25.42
6 25 Kemulang 柯木塱 1.94 27.36
6 26 Gaotangshi 高塘石 1.52 28.88
6 27 Huangbei 黄陂 2.42 31.30 Huangpu
6 28 Jinfeng 金峰 2.20 33.50
6 29 Xiangang 暹岗 1.30 34.80
6 30 Suyuan 苏元  21  0.93 35.73
6 31 Luogang 萝岗 1.53 37.26
6 32 Xiangxue 香雪  THP1  2.09 39.35

Future Expansion

The Third Phase of Line 6 was originally planned to further extend the line east deeper into Zengcheng, terminating at Guanhu station and connect with the Zengcheng Development Zone Station on the Xinbaiguang intercity railway. The extension would be 19km long with provisions to be spun off into an independent line. The spun off line (Line 23) was planned to run between Jingxi Nanfang Hospital and Guanhu stations with the central section reusing the Phase II section of Line 6 between Botanical Garden and Xiangxue Stations making use of the provision for splitting Line 6 at Botanical Garden Station.[5] However in 2018, this plan was abandoned and Phase III east extension of Line 6 was folded permanently into Line 23. The western section of Line 23 will no longer using any Phase II trackage of Line 6, instead heading southwest to Chishajiao Station in Haizhu District.[6] Line 6 Phase III will instead be a short 4km two station extension to Liucun.[7]

In 2019, another proposal to spin off the eastern section of Line 6 beyond Botanical Garden Station was proposed. This time the new line will take over the eastern section beyond Botanical Garden Station and head south to Canton Tower station. This new line is tentatively named Line 20.[8]

Rolling Stock

Line 6 is served by 89 sets of four car linear motor trains.

Type Time of manufacturing Series Sets Assembly Notes
Type L 2011–2012 L3 40 Mc+Mp+Mp+Mc First batch by CRRC Qingdao Sifang[9]
Type L 2015–2016 L3 11 Mc+Mp+Mp+Mc Second batch by CRRC Qingdao Sifang[9]
Type L 2019–2020 L6 38 Mcp+M+M+Mcp Manufactured by CRRC Guangdong[10][11]

References

  1. https://rail.kychung.com/en/2d-en/guangzhou-metro-line-6-csr-sifang-emu/
  2. 广州地铁六号线运力再升级!间隔首次压缩到小于3分钟.
  3. 1002.57万人次!广州地铁客流首次突破千万. 金羊网. 2018-01-02. Retrieved 2018-01-12.
  4. Zheng, Xiaojia. "Guangzhou Metro Line 6 opens on Dec. 28". Life of Guangzhou. Guangzhou Interactive Information Network. Retrieved 10 January 2014.
  5. "我不相信!竟有人说,地铁23号线规划发生变化,只延长到香雪公园?". www.sohu.com. Retrieved 2020-08-22.
  6. "细说广州地铁23号线的前世、今生和未来". baijiahao.baidu.com. Retrieved 2020-08-22.
  7. "地铁23号线最新站点曝光!6号线是否再东延香雪公园?-本地新闻-广州乐居网". web.archive.org. 2020-02-20. Retrieved 2020-08-22.
  8. "地铁6号线再次拆解!二期变成20号线,萝岗直达广州塔!_东段". www.sohu.com. Retrieved 2020-08-22.
  9. "广州地铁 全程为你--公司新闻". www.gzmtr.com. Retrieved 2020-08-22.
  10. 我哋嘅👉. "这两条线路上新车啦!". WeChat. Retrieved 2020-08-22.
  11. 中车广东公司. "叮咚!"双十二"提前发货了!". WeChat Official Accounts Platform. Retrieved 2020-08-22.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.