NorthConnex

NorthConnex is a 9-kilometre (5.6 mi) twin-tube motorway tunnel in northern Sydney, New South Wales, Australia, opened on 31 October 2020.[1] It acts as a tunnel bypass of the congested Pennant Hills Road, connecting the M1 Pacific Motorway to the M2 Hills Motorway. It is one of the longest road tunnels in Australia along with the M8 Tunnel. It is also the deepest road tunnel in Australia, with more than half of the tunnel 60 metres (200 ft) deep or more, and the deepest point is underneath the Sydney Metro Northwest, about 90 metres (300 ft) below ground.[2]

NorthConnex

General information
TypeMotorway
Length9 km (5.6 mi)
Opened31 October 2020
Major junctions
North end
  Pennant Hills Road / Cumberland Highway
South end
Location(s)
Major suburbs / townsWahroonga, Normanhurst, Thornleigh, Pennant Hills, West Pennant Hills
Highway system

NorthConnex was first known as the F3 to M2 link, with F3 referring to F3 Sydney–Newcastle Freeway, the previous name of M1 Pacific Motorway. It was then renamed the M1 to M2 link in 2013 when the F3 was renamed M1 Pacific Motorway. The NorthConnex name was announced in March 2014.[3][4]

The road has also colloquially been referred to as the "missing link", because its construction completed the combination of the Sydney Orbital Network and its north–south motorway links to the National Highway.[5]

Alignment

NorthConnex is a tolled motorway tunnel linking the M1 Pacific Motorway at Wahroonga to the M2 Hills Motorway at West Pennant Hills. NorthConnex is integrated within the existing Sydney Orbital Network and the need for integration work at either end has been identified to enable the safe merge of traffic on and off the M1 and M2 optimising motorway performance. The northern and southern interchanges were constructed to accommodate connections to Pennant Hills Road at either end of the tunnel.

The tunnel allows motorists to bypass 21 sets of traffic lights along Pennant Hills Road, meaning drivers will not encounter a single traffic light when travelling between Melbourne and Newcastle.[6] NorthConnex also forms an alternative route between the Pacific Motorway and the Sydney CBD via the M2 and Lane Cove Tunnel, bypassing 40 traffic lights along the Pacific Highway.

Exits and interchanges

LGALocationkm[7]miDestinationsNotes
Hornsby Shire / Ku-ring-gaiWahroonga00.0 M1 Pacific Motorway (north)  Gosford, Wyong, NewcastleNorthConnex northern terminus;
Road continues as Pacific Motorway
Tunnel northern terminus and toll northern terminus
1.10.68 Pennant Hills Road (north)  Hornsby, Wahroonga
Pennant Hills Road (south)  Pennant Hills, Normanhurst
Southbound entrance and northbound exit only
Entrance and exit for Pacific Highway
Hornsby Shire / The Hills ShireWest Pennant Hills8.55.3 Pennant Hills Road (south)  Carlingford, Parramatta, CityNorthbound entrance and southbound exit only
Entrance and exit for M2 Hills Motorway (east)
Parramatta / The Hills Shire8.95.5Tunnel southern terminus and toll southern terminus
M2 Hills Motorway (west)  Seven Hills, Blacktown, Campbelltown, Canberra, MelbourneNorthConnex southern terminus;
Road continues as M2 Hills Motorway
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

Toll

Ownership

NorthConnex is owned by the NorthWestern Roads Group (NWR), consisting of Transurban (50%), Queensland Investment Corporation (25%) and CPP Investment Board (25%).[8][9][10] NWR also owns Westlink M7.[11]

The concession to operate and toll the NorthConnex expires in June 2048.[12]

Pricing

At the time of opening, the toll prices on NorthConnex were aligned with the toll prices on M2 Hills Motorway, which at the time were A$7.99 for cars and A$23.97 for heavy vehicles.[13] Toll prices would increase in line with the proposed concession agreement with the Government and will end in June 2048.[12]

Toll prices as of 1 January 2021[14]
Toll roadToll typeClass A flagfall[lower-alpha 1]Class A charge per km[lower-alpha 1]Class A maximum toll or cap[lower-alpha 1]Class B toll prices[lower-alpha 1]Toll increase[16]Toll concessionaireExpiry of toll concession[17]
NorthConnex Fixed $8.11 3 x of Class A prices Quarterly on 1 January, 1 April, 1 July, and 1 October, by the greater of quarterly CPI or 1% NorthWestern Roads (50% owned by Transurban) June 2048
  1. Class A vehicles are typically cars and motorcycles; Class B vehicles are all other vehicles including trucks and heavy vehicles[15]

Pennant Hills Road regulation

Since the opening of NorthConnex on 31 October 2020, all trucks and buses over 12.5 metres long or over 2.8 metres clearance height (except vehicles transporting dangerous goods, oversize vehicles, or that have a genuine destination only accessible via Pennant Hills Road) travelling between the M1 and M2 are forbidden to use Pennant Hills Road and must use the NorthConnex tunnels instead.[18][13][19][20] Trucks and buses will be monitored by two gantries located along Pennant Hills Road, one at Normanhurst and one at Beecroft / West Pennant Hills. A fine of A$194 with no demerit points will also be imposed on truck and bus drivers detected (with the use of cameras mounted on gantries) using Pennant Hills Road with the traffic flow.

Features

The northbound tunnel contains backlit silhouettes of native birds and trees such as eagles, cockatoos, galahs, and lorikeets, an attempt to reflect the journey to Ku-ring-gai Chase National Park. The southbound tunnel contains fake starry skies displayed on the tunnel ceilings to represent the transition from the north's rural environment to the CBD's urban environment. The visual displays were designed to be eye-catching to keep drivers focused while driving through the 9-kilometre tunnel.[21] The idea was inspired from the Norra länken tunnels in Stockholm which feature illuminated butterflies.

NorthConnex is longer than the Lane Cove Tunnel, Cross City Tunnel and the Sydney Harbour Tunnel combined.[22]

History

Past proposals

The M1 Pacific Motorway, then known as the F3 Sydney–Newcastle Freeway, was originally planned to continue as the Lane Cove Valley Expressway, which was to join the North Western Expressway, leading to the Sydney Central Business District via Gladesville Bridge and the Western Distributor, but those plans were cancelled in 1977. By the time the F3 was extended to Wahroonga in 1989, there was no plan for a motorway route continuing beyond that location.

In 2001, at the same time as announcing Western Sydney Orbital (now Westlink M7), the federal Coalition government proposed that the Orbital would form part of a bypass route, with a new road branching off the F3 Freeway near Mount White and crossing the Hawkesbury River with a new high-level bridge to join the Orbital at its distinct northwestern corner at Dean Park. Hence, the road would avoid the steep grades of the Mount White section of the F3 immediately north of the existing low-level bridges across the Hawkesbury River and would be a quite direct bypass of Sydney that would be separated from much of Sydney's commuter traffic.

A study was undertaken by Sinclair Knight Merz (SKM) into options for connecting the F3 with the Sydney Orbital.[23] At the preliminary stage of that study, the then Roads and Traffic Authority decided that the primary goal of the new road was the best possible relief of traffic on the existing route, Pennant Hills Road. Corridors for that proposal were broadly defined as types A, B and C.

  • Type A options were essentially from the existing end of the F3 to somewhere on the M2
  • Type B corridors branched off the F3 in the vicinity of Berowra and crossed the environmentally sensitive Galston Gorge
  • Type C corridors were along the general lines of the Federal Government proposal (F3 to Western Sydney Orbital)

The need to reduce traffic on Pennant Hills Road made the reduction of commuter traffic more urgent than that of traffic bypassing Sydney. As such, type B and C options were rejected early in the planning process. Four type A options were identified and all involved extensive tunnelling.

The four type A options were put to public in 2003,[24] and were denoted by colours:[25][26]

  • 'Purple' option: from the F3 at Wahroonga to the M2 at the existing Pennant Hills Road/M2 interchange, generally following the alignment of Pennant Hills Road. It will consist of mostly tunnels with an open cut adjacent to the railway corridor and in the vicinity of Brickyard Park at Thornleigh.
  • 'Blue' option: 8 kilometres (5.0 mi) dual tunnels from the F3 at Wahroonga to the M2 at the existing Pennant Hills Road/M2 interchange, generally following an alignment to the east Pennant Hills Road
  • 'Yellow' option: 6.5 kilometres (4.0 mi) dual tunnels from the F3 at Wahroonga to the M2 at North Epping, with direct connections to the east and west at M2
  • 'Red' option: 6.5 kilometres (4.0 mi) dual tunnels from the F3 at Wahroonga to the M2 at Macquarie Park, with direct connections to the east and west at M2. This followed the alignment of the cancelled Lane Cove Valley Expressway

The study report by SKM was released in April 2004.[24] On 6 May 2004, the Deputy Prime Minister and federal Minister for Transport and Regional Services, John Anderson, and the federal Minister for Local Government, Territories and Roads, Senator Ian Campbell, announced that a preferred corridor had been chosen for a new link to be constructed from the F3 Freeway to the Sydney Orbital. The preferred corridor was the 'Purple' option, which was 8 kilometres (5.0 mi) long, mostly in tunnel, and would connect the F3 Freeway at Wahroonga to the M2 Motorway at Pennant Hills Road interchange.[27][28] The federal government strongly preferred that the corridor be fully tunneled which would ensure that there would no opening in Brickyard Park. The corridor was also the most favoured by the public in submissions.[24]

On 19 February 2007, the federal Minister for Local Government, Territories and Roads Jim Lloyd announced the establishment of an independent review of the F3 to M7 Corridor Selection.[29] The review was carried out by Mahla Pearlman AO, who is a former Chief Judge of the NSW Land and Environment Court. The review was completed in August 2007 and the report was released on 14 September 2007.[30][28] The conclusions of the report were that the proposed tunnels should proceed but that planning for the longer term connection between the F3 and the M7 should also commence immediately.[31][28]

In the 2007 federal election, both major parties made different election commitments regarding the F3 to M2 link.[32] Labor committed $150 million to undertake feasibility and planning studies under the National Building Program, while the Coalition made election commitment of $1.5 billion over seven years to 2014 to fund the construction of the F3 to M2 corridor. Labor eventually won the election. In October 2008, the NSW government sought to receive federal funding from Infrastructure Australia on the F3-M2 connector. In May 2011, the federal Labor government announced deferral of its National Building Program feasibility study until 2015–16, creating uncertainty about the federal government's commitment to the project.[32]

Pennant Hills Road

In March 2011, the LiberalsNationals coalition won the state election. In 2012, Infrastructure NSW released its 20-year State Infrastructure Strategy report which claimed that Pennant Hills Road carried approximately 80,000 vehicles per day in 2011.[33] The Environmental Impact Statement of the NorthConnex subsequently released in July 2014 showed that Pennant Hills Road carried approximately 62,000 vehicles per day, out of which roughly 10% were heavy vehicles.[34] Until 2020, the average daily traffic volumes on Pennant Hills Road remained at the same numbers.[35]

Along with the State Infrastructure Strategy report, the link between the F3 and M2 was also recognised in Transport for NSW's Long Term Transport Master Plan as important infrastructure for freight traffic and the wider connectivity within NSW to reduce congestion and improve traffic flow along Pennant Hills Road.[36]

In 2013, The National Roads and Motorists' Association (NRMA) identified the arterial, Pennant Hills Road as the third worst road in NSW and the ACT. This rating reflected the level of frustration experienced by road users.[37] Traffic congestion is often associated with poor road safety and further compounding congestion into off-peak period. The rate of accidents along the arterial strip was significantly higher when compared to the NSW average.[38]

A proposed tunnel link was estimated to carry more than 100,000 vehicles per day (50,000 in each direction).

Transurban proposal

In March 2012, the NSW government received an unsolicited proposal from Transurban and its Westlink M7 partners to design, build, operate, maintain and finance the F3–M2 Link.[3] A committee was set up to investigate and assess the proposal and in July that year, the proposal moved to Stage 2 of the unsolicited proposals process (development and assessment of a detailed proposal).[39] On 30 May 2013, the NSW Government announced the proposal had progressed to Stage 3, which would include a competitive tender to select a design and construction contractor.[3]

In mid-2013, the F3 became known as the M1 Pacific Motorway and the proposed tunnels became the M1–M2 link.[40] On 16 March 2014, the NSW Government reached an agreement with Transurban and its Westlink M7 partners to build, maintain and operate the tunnel link. It was also announced that the tunnel link would be known as NorthConnex.[3][4]

Funding

The A$3 billion, consisting of a construction budget of A$2.65 billion in addition to land and project delivery costs, will be funded through toll charges and a contribution from the NSW and Australian Governments of A$412.3 million each.[41][42]

The toll concessions of Westlink M7 and Lane Cove Tunnel were extended from 2037 to June 2048 to fund the project.[43][44][11] The toll concession of the M2 Hills Motorway was also extended from 2046 to June 2048 for the M2's integration works with NorthConnex.

Criticism

There was community opposition and criticism to a proposed ventilation exhaust to be built for the tunnels near schools in Sydney.[45]

There is also some contention within the local community about how successful the chosen route option will be in easing traffic congestion on Pennant Hills Road.[46] Ku-ring-gai Council has also raised a significant concern that the current proposal does not address the worsening traffic on the Pacific Highway from Wahroonga through to the Gore Hill Freeway at Artarmon.[47] To help address this, construction of east-facing tunnel ramps under Pennant Hills Golf Course to the M2 Motorway may be considered in the future if required.[48]

Construction

Along with the announcement of the NorthConnex name in March 2014, the Lendlease Bouygues joint venture was announced as the preferred construction contractor for the project.[4][49]

Planning approval for the construction and operation of NorthConnex was granted on 13 January 2015 by the NSW Minister of Planning.[50][42]

Preliminary work activities started on 5 February 2015 and continued until major construction began in mid-2015. Tunnelling began in April 2016 and finished in October/November 2018.[51][42] In conjunction with Hornsby Shire Council, the spoil removed from NorthConnex tunnelling was used to fill Hornsby Quarry to enable rehabilitation of the old quarry into a new public parkland.[52]

The project was originally due to be completed by the end of 2019 but was delayed with the contractor citing the depth of the tunnel (90m) as presenting challenges to the construction time frame.[53] It was estimated to be open during the third quarter of 2020, but was further delayed due to the COVID-19 pandemic.[54][55] The tunnel finally opened on 31 October 2020.[56]

See also

References

  1. "'Absolute gamechanger': Sydney's newest toll road to open tomorrow". www.abc.net.au. 29 October 2020. Retrieved 30 October 2020.
  2. "NorthConnex". Bouygues Construction. Retrieved 22 October 2020.
  3. "Go ahead for NorthConnex motorway". Roads and Maritime Services. 16 March 2014. Archived from the original on 26 May 2014. Retrieved 20 October 2020.
  4. "Transurban announces preferred contractor for NorthConnex" (PDF). Transurban. Archived from the original (PDF) on 16 March 2014. Retrieved 16 March 2014.
  5. Smith, Rohan. "Wahroonga homes to go to make way for M1-M2 motorway link NorthConnex". The Daily Telegraph. News Corp Australia.
  6. "What are the benefits of NorthConnex?". NorthConnex. Archived from the original on 15 October 2020. Retrieved 6 July 2020.
  7. Wahroonga, New South Wales 2076 to Beecroft, New South Wales 2119 (Map). Google Maps. 2020. Retrieved 2 November 2020.
  8. "North Western Roads". QIC. Retrieved 2 November 2020.
  9. "Financial Close on the NorthConnex Project in NSW" (PDF). Australian Financial Review. 2 February 2015. Retrieved 2 November 2020.
  10. "Canada Pension Plan Investment Board to Invest A$525 Million in Australian Infrastructure". CPP Investments. 1 February 2015. Retrieved 2 November 2020.
  11. "Road tolling in New South Wales" (PDF). New South Wales Parliament. Portfolio Committee No.2 – Health and Community Services. October 2017. p. 19,22,23,24,52. Retrieved 30 October 2020.
  12. "Northconnex toll road giant yet to calculate profit from $3 billion Sydney tunnel". ABC News. 11 April 2017. Retrieved 30 October 2020.
  13. "Guide to using NorthConnex for trucks and buses" (PDF). Transport for NSW - Roads and Maritime. Transport for NSW. October 2020. Archived from the original (PDF) on 15 October 2020. Retrieved 15 October 2020.
  14. "Toll charges – costs by toll road". Transport for NSW - Roads and Maritime. Retrieved 5 January 2021.
  15. "What is my vehicle class?". Linkt. Retrieved 5 November 2020.
  16. "When and how do toll prices increase". Linkt. Retrieved 5 November 2020.
  17. "Road tolling in New South Wales" (PDF). New South Wales Parliament. Portfolio Committee No.2 – Health and Community Services. October 2017. Retrieved 30 October 2020.
  18. "Pennant Hills Road regulation". Transport for NSW - Roads and Maritime. Archived from the original on 29 October 2020. Retrieved 30 October 2020.
  19. "Trucks to be fined almost $200 for evading new Sydney tollway". Sydney Morning Herald. 11 February 2020. Retrieved 10 March 2020.
  20. "How will trucks be regulated to ensure they use the tunnel?". NorthConnex. Archived from the original on 19 February 2019. Retrieved 18 February 2019.
  21. "Sydney NorthConnex motorists to be kept alert with Australian-first visual displays". ABC News. 22 June 2020. Retrieved 30 October 2020.
  22. "NorthConnex Tunnel Tour". Transurban. 17 October 2020. Retrieved 3 November 2020.
  23. "F3 to Sydney Orbital route study". Sinclair Knight Merz. Archived from the original on 23 October 2006.
  24. "F3 to Sydney Orbital one step closer". Department of Transport and Regional Services. 6 May 2004. Archived from the original on 20 August 2006.
  25. "F3 to Sydney Orbital link study - Main Report" (PDF). Transport for NSW - Roads and Maritime. Sinclair Knight Merz. Archived (PDF) from the original on 2 November 2020.
  26. "F3 to Sydney Orbital link study - Summary Report" (PDF). Sinclair Knight Merz. p. 18,19. Archived from the original (PDF) on 20 August 2006.
  27. "F3 to Sydney Orbital route study - Current Status - January 2005". Sinclair Knight Merz. Archived from the original on 20 August 2006.
  28. "M2 to F3 corridor - background" (PDF). Transport for NSW - Roads and Maritime. Retrieved 2 November 2020.
  29. "Former Chief Judge To Head Independent Review Of F3 To Sydney Orbital Transport Link". 19 February 2007. Archived from the original on 2 September 2007. Retrieved 3 March 2007.
  30. "Review of the F3 to M7 Corridor Selection". Archived from the original on 20 February 2011.
  31. "Review of the F3 to M7 Corridor Selection" (PDF). Department of Transport and Regional Services. Australian Government. August 2007. Archived from the original (PDF) on 17 September 2007.
  32. "The F3-M2 connector: Supporting research" (PDF). Hornsby Shire Council. PWC. April 2012. Retrieved 2 November 2020.
  33. "20-year State Infrastructure Strategy - The Solution: Urban Roads" (PDF). Infrastructure NSW. 2012. Retrieved 20 October 2020.
  34. "Environmental Impact Statement - Volume 2" (PDF). NorthConnex. July 2014. p. 31-32. Retrieved 20 October 2020.
  35. "Pennant Hills Road (74090)". Transport for NSW - Traffic Volume Viewer. Retrieved 20 October 2020.
  36. "NorthConnex". NorthConnex - About. Archived from the original on 16 March 2014. Retrieved 28 April 2015.
  37. "Seeing Red on Roads". The National Roads and Motorists' Association. 2013. Archived from the original on 10 October 2013. Retrieved 28 April 2015.
  38. "Why NorthConnex". NorthConnex. Archived from the original on 13 October 2014. Retrieved 28 April 2015.
  39. "NSW government studies unsolicited proposal for F3 to M2 link". 19 July 2012. Retrieved 2 November 2020.
  40. "M1-M2 Community Update" (PDF). Roads & Maritime Services. December 2013. Archived from the original (PDF) on 25 January 2014.
  41. "NorthConnex tunnel: Tony Abbott and Barry O'Farrell give go-ahead to $3b project to link M1 and M2 in Sydney". ABC News. Australia. Retrieved 16 March 2014.
  42. "NorthConnex". Department of Infrastructure, Transport, Regional Development and Communications. Retrieved 2 November 2020.
  43. "Northconnex toll road giant yet to calculate profit from $3 billion Sydney tunnel". ABC News. 11 April 2017. Retrieved 30 October 2020.
  44. "M7 tolls to go on for 11 more years to help pay for NorthConnex — and more roads could follow". Daily Telegraph. 25 June 2014. Retrieved 30 October 2020.
  45. Smith, Rohan (9 April 2014). "Wahroonga residents form Community Against Polluting Stacks to protest M1-M2 exhaust stack near prestigious schools". TheTelegraph.com.au. Retrieved 25 May 2014.
  46. Blight, Tim. "Why Sydney's NorthConnex Motorway won't work". Retrieved 3 May 2014.
  47. NorthConnex Submissions and Preferred Infrastructure Report (Volume 2) (PDF). RMS. November 2014. pp. 714–715. ISBN 978-1-925093-99-5. Archived from the original (PDF) on 27 December 2014.
  48. "NorthConnex Project Development and Alternatives (Section 4.3.2)" (PDF). Archived from the original (PDF) on 27 December 2014.
  49. "NorthConnex Community Update March 2014" (PDF). Roads and Maritime Services. March 2014. Retrieved 20 October 2020.
  50. "NSW Minister for Planning Approval" (PDF). NorthConnex. Archived from the original (PDF) on 1 March 2015.
  51. "Construction history". NorthConnex. Retrieved 16 October 2020.
  52. "Final Truckload of NorthConnex Dirt Tipped Into Hornsby Quarry" (PDF). NorthConnex. Hornsby Shire Council. 29 January 2019. Archived (PDF) from the original on 19 October 2020. Retrieved 16 October 2020.
  53. "Project chief quits amid delays to Sydney's NorthConnex tunnel". The Sydney Morning Herald. 16 November 2018. Retrieved 4 April 2020.
  54. Rabe, Tom; Hatch, Patrick (12 August 2020). "Coronavirus 'challenges' affect Sydney NorthConnex tunnel opening". The Sydney Morning Herald. Retrieved 7 September 2020.
  55. "Construction Update - Final Edition (Spring 2020)" (PDF). Northconnex. September 2020. Archived (PDF) from the original on 15 October 2020. Retrieved 14 October 2020.
  56. "NorthConnex opening date revealed". Transport for NSW. 22 October 2020. Retrieved 22 October 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.