The Sahibganj loop is a railway line connecting Khana Junction and Kiul Junction. Originally a part of the Howrah–Delhi main line, it was opened to traffic in 1866. With the construction of a shorter railway line for a part of the route, the 403.8 kilometres (250.9 mi) stretch was assigned a separate identity.

Sahibganj loop
Sahibganj railway station, Derives the name of loop line as Sahibganj loop
Overview
StatusOperational
OwnerIndian Railways
LocaleWest Bengal, Jharkhand, Bihar
TerminiKhana Junction
Kiul Junction
Service
Operator(s)Eastern Railway
History
Opened1866
Technical
Line length403.8 km (251 mi)
Number of tracks1/ 2
Track gauge1,676 mm (5 ft 6 in) broad gauge
Route map

427
301
Kiul Junction
424
Rampur Halt
421
Dhanauri
418
Pawan Brahmasthan Halt
415
Uren
411
Kajra
406
Ghoghi Bariarpur
404
Abhaipur
400
Masudan
394
Dharhara
391
Amari Adalpur
388
Dashrathpur
387
Sarobag Halt
382
Jamalpur Junction
394
Sabdalpur
Munger Rail cum Road Bridge
over Ganga river
387
Munger
386
Purab Sarai
385
Sandalpur
384
Hatkarota Halt
383
Safiasarai
378
Patam Halt
376
Ratanpur
373
Rishikund Halt
to Mananpur (planned)
371
Bariarpur
367
Kalyanpur Road
364
Ghorghat Halt
362
Kharia Pipra Halt
360
Ganganiyan
357
Kamarganj
352
Sultanganj
350
Abjuganj
347
Maheshi
342
Akbarnagar
339
Chhit Makhanpur
337
Murarpur
332
Nathnagar
328
Bhagalpur Junction
321
Sabour
314
Lailakh Mamlakha
308
Ghogha
302
Ekchari
Kahalgaon Super Thermal
Power Station
298
Kahalgaon
290
Bikramshila
287
Shivanarayanpur
284
Lakshmipur Bhorang
278
Pirpainti
273
Ammapali
269
Mirza Cheuki
263
Karamtola
254
Sahibganj
246
Sakrigali
247
Sakrigali Ghat
240
Maharajpur
233
Karanpurato
226
Taljhari
221
Kalian Chak
228
Rajmahal
220
Murli Halt
216
Tinpahar Junction
211
Dhamdhamia
207
Bakudi
179
Barharwa Junction
172
Gumani
165
Kotalpokhar
157
Tilbhita
153
Pakur
PANEM Coal Depot
147
Nagarnabi
136
Rajgram
130
Banshlai Bridge
125
Murarai
117
Chatra
108
Nalhati Junction
101
Swadinpur
94
Rampurhat Junction
87
Tarapith Road
81
Mallarpur
78
Gadadharpur
71
Sainthia Junction
63
Bataspur
58
Ahmadpur Junction
49
Kopai
Siuri
Purandarpur
Abinashpur
Mongoldihi
Salan
Kasba
Prantik-Siuri line
(planned)
43
Prantik
39
Bolpur Shantiniketan
31
Bhedia
26
Pichkurir Dhal
20
Guskara
15
Noadar Dhal
10
Banpas
4
Jhapater Dhal
102
Sitarampur
0
Khana Junction

History

Railway transportation was introduced in India within 30 years of its maiden run in England.

The East Indian Railway Company which was formed on 1 June 1845, completed its survey for a railway line from Kolkata, then called Calcutta, to Delhi via Mirzapur in 1846. The company initially became defunct on refusal of government guarantee, which was given in 1849. Thereafter, an agreement was signed between East Indian Railway Company and the East India Company, for the construction and operation of an "experimental" line between Kolkata and Rajmahal, which would later be extended to Delhi via Mirzapur. Construction began in 1851.

On 15 August 1854, the first passenger train in the eastern section was operated up to Hooghly, 39 kilometres (24 mi) away. On 1 February 1855 the first train ran from Hooghly to Raniganj, 195 kilometres (121 mi) from Howrah. The priority accorded to the Raniganj section was because of the assurance of coal transportation.

The Khana Junction-Rajmahal section was complete in October 1859, crossing Ajay River on the way. The first train ran from Howrah to Rajmahal via Khana on 4 July 1860.[1][2] The Loop from Khana Junction to Kiul via Jamalpur, including the Monghyr branch, was ready in February 1862.[2]

From Rajmahal, construction progressed rapidly, moving westward along the banks of the Ganges, reaching Bhagalpur in 1861, Munger in February 1862, and opposite Varanasi (across the Ganges) in December 1862 and then on to Naini on the bank of the Yamuna. The work included EIR's first tunnel at Jamalpur and first major bridge across the Son River at Arrah.

During 1863–64, work progressed rapidly on the Allahabad–Kanpur–Tundla and Aligarh–Ghaziabad sections. The Yamuna bridge near Delhi was completed in 1864 and EIR established the Delhi terminus. The Yamuna bridge at Allahabad opened on 15 August 1865 and in 1866 Kolkata and Delhi were directly linked. The 1 Dn/ 2 Up Mail started running.

With the completion of the 300.8-kilometre (186.9 mi) long line from Khana Junction connecting Durgapur, Asansole with Kiul Junction in 1871, a "shorter main line" was in position. Initially, it was called the chord line. However, as it attracted more traffic it was designated the main line and the original line became the Sahibganj loop.

After approx 150 years of operation, Sahibganj loop is converted in double line on 14-05-2019 except Ratanpur–Jamalpur section as construction of tunnel near Jamalpur is in progress. Train operation with Electric Loco in Kiul–Bhagalpur section is started on 03-06-2019.

In the Rail Budget 2008, Bhagalpur was announced to be converted to as Railway Division but decision withdrawn by ER in 2009. The new rail lines from Sultanganj to Deoghar announced and the construction yet to start . Bhagalpur to Rampurhat via Dumka 184.9-kilometre (114.9 mi) section is operational. Bhagalpur to Deoghar via Banka 107.1-kilometre (66.5 mi) section is operational. Bhagalpur to Godda via Hansdiha is under construction.

Branch lines

In 1863, the Indian Branch Railway Company, a private company opened the Nalhati–Azimganj branch line. The 50 kilometres (31 mi) track was initially a 4' gauge line. The track was subsequently converted to 5' 6" broad gauge. The Indian Branch Railway Company was purchased by the Government of India in 1872 and the line was renamed Nalhati State Railway. It became a part of the East Indian Railway Company in 1892.[3]

In 1913, the Hooghly–Katwa Railway constructed a 105-kilometre (65 mi)line from Bandel to Katwa, and the Barharwa–Azimganj–Katwa railway constructed the 171.9-kilometre (106.8 mi) Barharwa–Azimganj–Katwa loop line. The 73.3-kilometre (45.5 mi) Andal–Sainthia branch line was built in 1913.

The 105-kilometre (65 mi)-long Ahmedpur–Katwa Light Railway connecting Ahmadpur Junction and Katwa Junction & Katwa Junction to Barddhaman Junction, built on 760 millimetres (30 in), was opened to traffic on 29 September 1917.[4]

184.9-kilometre (114.9 mi) Bhagalpur to Rampurhat via Dumka section is operational. 107.1-kilometre (66.5 mi) Bhagalpur to Deoghar section via Banka is operational.

72.9-kilometre (45.3 mi) Mirza Cheoki–Godda and 67.6-kilometre (42.0 mi) Godda–Hansdiha is under construction. Bhagalpur will get directly connected with Godda via Hansdiha.

Developments

Only Ratanpur to Jamalpur of the Sahibganj loop is still operating on single track. Work of construction of second tunnel near Janalpur is in progress. Second tunnel work near Jamalpur is likely to be completed by 2021. Twenty-one pairs of trains ply between Bhagalpur and Sahibganj.

New rail line from Pakur–Godda and Bashukinath Dham–Chatra is proposed. Work for doubling the 111-kilometre long (69 mi) stretch started in 2010 (Announced in 1996).[5]

Work on the new 130-kilometre (81 mi) long Rampurhat–Dumka–Mander Hill broad-gauge line completed and Kavi Guru Express BhagalpurJn to Howrah is running on this route.[6]

Jamalpur Workshop

Jamalpur Workshop, the first full-fledged railway workshop facility in India, was opened on 8 February 1862, at a time when the Howrah–Delhi main line, passing through Jamalpur was under construction. It was felt that communities of gunsmiths and other craftsmen in the area handling mechanical engineering jobs could pick up the skills required in a railway workshop. It undertook repairs of wagons, coaches, cranes and tower cars, and locomotives, as well as manufacture of some tower cars, break-down cranes and various kinds of heavy-duty lifting jacks. They also produced their own locomotives, starting with the CA 764 Lady Curzon in 1899. It has also produced ticket printers and other ticket machines (slitting, counting, and chopping). With fairly extensive workshop facilities, it was a fairly self-contained.[7]

Electrification

Electrification of the Khana–Rampurhat–Sainthia–Pakur section was announced in the rail budget for 2010–11.[8] The electrification of Ahmedpur–Khana–Sainthia–Rampurhat–Pakur–Bonidanga section was completed in 2016. The first electric train service started from 29 September 2016 through running of Howrah – Rampurhat Express by Electric Locomotive.

The electrification of Bonidanga Link Cabin–Barharwa–Sahibganj–Kiul section including the Tinpahar – Rajmahal section (Announced by Prime Minister Package in Bihar) has been started from September 2017 and was expected to be completed by the end of March 2020 but got delayed due to a pandemic and was completed on 30 June 2020.

After approximately 150 years of operation of Kiul–Bhagalpur section of Sahibganj loop, Vikramshila Express became the first train to be hauled by an electric locomotive on 2 June 2019.

After the electrification of Bhagalpur to Kiul first train with electric locomotive on this loop was started on Vikramshila Express between Anand Vihar Terminus to Bhagalpur hauled by WAP-5 of Ghaziabad Shed. The next day it departed and ran with the same electric loco from Bhagalpur Junction till Anand Vihar Terminus. By then almost 8 pairs of express trains originated from Bhagalpur begun its operations by electric locomotives.

The electrification of the further loop line between Bhagalpur to Bonidanga Link Cabin was delayed due to doubling of Sahibganj–Bhagalpur section which was completed in the month of April 2019.

After the complete electrification work was then resumed between Bhagalpur to Bonidanga in 4 stages which began from both sides as the Bonidanga–Barharwa section was electrified within 1 month in first phase.

The work was then resumed between Barharwa–Tinpahar which was completed within 2 months in the second phase.

Within that time doubling work between Bhagalpur to Kahalgaon section was completed but, it was again delayed due to Route-Relay Interlocking work so, electrification work from Bhagalpur section was paused due to RRI work.

After the electrification of Barharwa–Tinpahar section, Tinpahar–Sahibganj section was electrified in the third phase and its CRS Inspection was done between Sahibganj to Barharwa.

The fourth phase of electrification was done between Sahibganj to Bhagalpur into two parts.

  1. Sahibganj–Shivnarayanpur (33 km) – Completed in February 2020
  2. Shivnarayanpur–Bhagalpur (42 km) – Completed in March 2020, CRS Inspection was done on 30 June 2020.

With the completion of electrification of Sahibganj loop from (Bonidanga Link Cabin to Kiul) distance of total 247 km, it became a history marking the era of 100% electrification of the oldest Howrah–New Delhi rail route constructed in the late 1880s by the British Government (East India Company) and thus, ending the era of diesel locomotives.

As the newly electrified section of Bhagalpur–Shivnarayanpur portion under Eastern Railways’ Malda division was completely electrified, train number 05956/05955 Delhi–Dibrugarh-Delhi Special Brahmaputra Mail was the first passenger train from Delhi to reach up to New Jalpaiguri with an Electric Locomotive. According to the NFR zone, the national transporter will save an amount of around Rs 20.4 crore per annum in its fuel cost, for running this train on electric traction between Pandit Deen Dayal Upadhyaya Jn (formerly Mughalsarai Junction) and New Jalpaiguri Jn railway stations.

Finally, the whole Sahibganj loop route has been electrified and the last CRS inspection was done on 30 June 2020 between Bhagalpur and Shivnarayanpur. More electric trains to run soon in this route after notification.

References

  1. George Huddleston (1906). History of the East Indian Railway. p. 28.
  2. Rao, M.A. (1988). Indian Railways. New Delhi: National Book Trust. p. 19.
  3. "The Oudh & Rohilkhand Railway" (PDF). Archived from the original (PDF) on 21 June 2013. Retrieved 1 December 2011.
  4. "Ahmadpur–Katwa Railway". Retrieved 2 December 2011.
  5. Sarkar, Gautam (21 September 2010). "Green light to double rail on oldest route – 135-year-old Kiul–Sahebganj loop section will finally get twin railway". The Telegraph. Archived from the original on 4 September 2015. Retrieved 15 November 2011.
  6. "ER revenue up 25% at Rs 1144 crore". Business Standard. 22 August 2007. Retrieved 15 November 2011.
  7. "Production Units & Workshops". Jamalpur Workshop. IRFCA. Retrieved 15 November 2011.
  8. "Electrification of new rail sections". Press information Bureau. Archived from the original on 24 March 2014. Retrieved 28 November 2011.

|

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.