Chandrayaan-1

Chandrayaan-1 (transl.Moon-craft, pronunciation )[6] was the first Indian lunar probe under Chandrayaan program. It was launched by the Indian Space Research Organisation in October 2008, and operated until August 2009. The mission included a lunar orbiter and an impactor. India launched the spacecraft using a PSLV-XL rocket on 22 October 2008 at 00:52  UTC from Satish Dhawan Space Centre, at Sriharikota, Andhra Pradesh.[7] The mission was a major boost to India's space program,[8] as India researched and developed its own technology in order to explore the Moon.[9] The vehicle was inserted into lunar orbit on 8 November 2008.[10]

Chandrayaan-1
Mission typeLunar orbiter
OperatorIndian Space Research Organisation
COSPAR ID2008-052A
SATCAT no.33405
Websitewww.isro.gov.in/Spacecraft/chandrayaan-1
Mission durationPlanned: 2 years
Final: 10 months, 6 days
Spacecraft properties
Launch mass1,380 kg (3,040 lb)[1]
Dry mass560 kg (1,230 lb)[2]
Payload mass105 kg (231 lb)[2]
Start of mission
Launch date22 October 2008, 00:52 (2008-10-22UTC00:52) UTC
RocketPSLV-XL C11[3][4]
Launch siteSatish Dhawan Second Pad
ContractorISRO
End of mission
Last contact28 August 2009, 20:00 (2009-08-28UTC21) UTC
Orbital parameters
Reference systemSelenocentric
Semi-major axis1,758 kilometers (1,092 mi)
Eccentricity0.0
Periselene altitude200 km (120 mi)
Aposelene altitude200 km (120 mi)
Epoch19 May 2009
Lunar orbiter
Orbital insertion8 November 2008
Orbits3,400 at EOM[5]
 

On 14 November 2008, the Moon Impact Probe separated from the Chandrayaan orbiter at 14:36 UTC and struck the south pole in a controlled manner, making India the fourth country to place its flag insignia on the Moon.[11] The probe hit near the crater Shackleton at 15:01 UTC, ejecting sub-surface soil that could be analysed for the presence of lunar water ice.[12] The location of impact was named Jawahar Point.[13]

The estimated cost for the project was 386 crore (US$54 million).[14]

It was intended to survey the lunar surface over a two-year period, to produce a complete map of the chemical composition at the surface and three-dimensional topography. The polar regions are of special interest as they might contain water ice.[15] Among its many achievements was the discovery of widespread presence of water molecules in lunar soil.[16]

After almost a year, the orbiter started suffering from several technical issues including failure of the star tracker and poor thermal shielding; Chandrayaan-1 stopped communicating at about 20:00 UTC on 28 August 2009, shortly after which the ISRO officially declared that the mission was over. Chandrayaan-1 operated for 312 days as opposed to the intended two years, but the mission achieved most of its scientific objectives.[5][17][18][19]

On 2 July 2016, NASA used ground-based radar systems to relocate Chandrayaan-1 in its lunar orbit, more than seven years after it shut down.[20][21] Repeated observations over the next three months allowed a precise determination of its orbit which varies between 150 and 270 km (93 and 168 mi) in altitude every two years.[22]

History

Then Prime Minister of India Atal Bihari Vajpayee announced the Chandrayaan 1 project on course in his Independence Day speech on 15 August 2003.[23] The mission was a major boost to India's space program.[8] The idea of an Indian scientific mission to the Moon was first mooted in 1999 during a meeting of the Indian Academy of Sciences. The Astronautical Society of India (ASI) carried forward the idea in 2000. Soon after, the Indian Space Research Organisation (ISRO) set up the National Lunar Mission Task Force which concluded that ISRO has the technical expertise to carry out an Indian mission to the Moon. In April 2003 over 100 eminent Indian scientists in the fields of planetary and space sciences, Earth sciences, physics, chemistry, astronomy, astrophysics, engineering and communication sciences discussed and approved the Task Force recommendation to launch an Indian probe to the Moon. Six months later, in November, the Indian government gave approval for the mission.[24][25]

Objectives

The mission had the following stated objectives:[26]

  • to design, develop, launch and orbit a spacecraft around the Moon using an Indian-made launch-vehicle
  • to conduct scientific experiments using instruments on the spacecraft which would yield data:
    • for the preparation of a three-dimensional atlas (with high spatial and altitude resolution of 5–10 m or 16–33 ft) of both the near and far sides of the Moon
    • for chemical and mineralogical mapping of the entire lunar surface at high spatial resolution, mapping particularly the chemical elements magnesium, aluminium, silicon, calcium, iron, titanium, radon, uranium, and thorium
  • to increase scientific knowledge
  • to test the impact of a sub-satellite (Moon Impact Probe – MIP) on the surface of the Moon as a fore-runner for future soft-landing missions

Goals

In order to reach its objective, the mission defined these goals:

  • High-resolution mineralogical and chemical imaging of the permanently shadowed north- and south-polar regions
  • Searching for surface or sub-surface lunar water-ice, especially at the lunar poles
  • Identification of chemicals in lunar highland rocks
  • Chemical stratigraphy of the lunar crust by remote sensing of the central uplands of large lunar craters, and of the South Pole Aitken Region (SPAR), an expected site of interior material
  • Mapping the height variation of features of the lunar surface
  • Observation of X-ray spectrum greater than 10 keV and stereographic coverage of most of the Moon's surface with 5 m (16 ft) resolution
  • Providing new insights in understanding the Moon's origin and evolution

Specifications

Diagram of the Chandrayaan-1 spacecraft
Mass
1,380 kg (3,042 lb) at launch, 675 kg (1,488 lb) at lunar orbit,[27] and 523 kg (1,153 lb) after releasing the impactor.
Dimensions
Cuboid in shape of approximately 1.5 m (4.9 ft)
Communications
X band, 0.7 m (2.3 ft) diameter dual gimballed parabolic antenna for payload data transmission. The Telemetry, Tracking & Command (TTC) communication operates in S band frequency.
Power
The spacecraft was mainly powered by its solar array, which included one solar panel covering a total area of 2.15 × 1.8 m (7.1 × 5.9 ft) generating 750 W of peak power, which was stored in a 36 A·h lithium-ion battery for use during eclipses.[28]
Propulsion
The spacecraft used a bipropellant integrated propulsion system to reach lunar orbit as well as orbit and altitude maintenance while orbiting the Moon. The power plant consisted of one 440 N engine and eight 22 N thrusters. Fuel and oxidiser were stored in two tanks of 390 litres (100 US gal) each.[27][28]
Navigation and control
The craft was 3-axis stabilised with two star sensors, gyros and four reaction wheels. The craft carried dual redundant bus management units for attitude control, sensor processing, antenna orientation, etc.[27][28]

Payload

The scientific payload had a mass of 90 kg (198 lb) and contained five Indian instruments and six instruments from other countries.

Indian instruments

  • TMC or the Terrain Mapping Camera is a CMOS camera with 5 m (16 ft) resolution and a 40 km (25 mi) swath in the panchromatic band and was used to produce a high-resolution map of the Moon.[29] The aim of this instrument was to completely map the topography of the Moon. The camera works in the visible region of the electromagnetic spectrum and captures black and white stereo images. When used in conjunction with data from Lunar Laser Ranging Instrument (LLRI), it can help in better understanding of the lunar gravitational field as well. TMC was built by the ISRO's Space Applications Centre (SAC) at Ahmedabad.[30] The TMC was tested on 29 October 2008 through a set of commands issued from ISTRAC.[31]
  • HySI or Hyper Spectral Imager is a CMOS camera, performed mineralogical mapping in the 400–900 nm band with a spectral resolution of 15 nm and a spatial resolution of 80 m (260 ft).
  • LLRI or Lunar Laser Ranging Instrument determines the height of the surface topography by sending pulses of infrared laser light towards the lunar surface and detecting the reflected portion of that light. It operated continuously and collected 10 measurements per second on both the day and night sides of the Moon. LLRI was developed by Laboratory for Electro Optics Systems of ISRO, Bangalore.[32] It was tested on 16 November 2008.[32][33]
  • HEX is a High Energy aj/gamma x-ray spectrometer for 30–200 keV measurements with ground resolution of 40 km (25 mi), the HEX measured U, Th, 210Pb, 222Rn degassing, and other radioactive elements.
  • MIP or the Moon Impact Probe developed by the ISRO, is an impact probe which consisted of a C-band Radar altimeter for measurement of altitude of the probe, a video imaging system for acquiring images of the lunar surface and a mass spectrometer for measuring the constituents of the lunar atmosphere.[34] It was ejected at 14:30 UTC on 14 November 2008. As planned, the Moon Impact Probe impacted the lunar south pole at 15:01 UTC on 14 November 2008. It carried with it a picture of the Indian flag. India is now the fourth nation to place a flag on the Moon after the Soviet Union, United States and Japan.

Instruments from other countries

Moon Mineralogy Mapper (left)
SIR-2 Logo

Mission timeline

PSLV C11 carrying Chandrayaan-1

During the tenure of Prime Minister Manmohan Singh, the Chandrayaan project got a boost and finally Chandrayaan-1 was launched on 22 October 2008 at 00:52 UTC from Satish Dhawan Space Centre using the ISRO's 44.4-metre (146 ft) tall, four-stage PSLV C11 launch vehicle.[46] Chandrayaan-1 was sent to the Moon in a series of orbit-increasing manoeuvres around the Earth over a period of 21 days as opposed to launching the craft on a direct trajectory to the Moon.[47] At launch the spacecraft was inserted into geostationary transfer orbit (GTO) with an apogee of 22,860 km (14,200 mi) and a perigee of 255 km (158 mi). The apogee was increased with a series of five orbit burns conducted over a period of 13 days after launch.[47]

For the duration of the mission, ISRO's telemetry, tracking and command network (ISTRAC) at Peenya in Bangalore, tracked and controlled Chandrayaan-1.[48] Scientists from India, Europe, and the U.S. conducted a high-level review of Chandrayaan-1 on 29 January 2009 after the spacecraft completed its first 100 days in space.[49]

Earth orbit burns

Earth orbit burns
Date (UTC) Burn time
(minutes)
Resulting
apogee
22 October
Launch
18.2
in four stages
22,860 km
23 October 18 37,900 km
25 October 16 74,715 km
26 October 9.5 164,600 km
29 October 3 267,000 km
4 November 2.5 380,000 km
First orbit burn

The first orbit-raising manoeuvre of Chandrayaan-1 spacecraft was performed at 03:30 UTC on 23 October 2008 when the spacecraft's 440 Newton liquid engine was fired for about 18 minutes by commanding the spacecraft from Spacecraft Control Centre (SCC) at ISRO Telemetry, Tracking and Command Network (ISTRAC) at Peenya, Bangalore. With this Chandrayaan-1's apogee was raised to 37,900 km (23,500 mi), and its perigee to 305 km (190 mi). In this orbit, Chandrayaan-1 spacecraft took about 11 hours to go around the Earth once.[50]

Second orbit burn

The second orbit-raising manoeuvre of Chandrayaan-1 spacecraft was carried out on 25 October 2008 at 00:18 UTC when the spacecraft's engine was fired for about 16 minutes, raising its apogee to 74,715 km (46,426 mi), and its perigee to 336 km (209 mi), thus completing 20 percent of its journey. In this orbit, Chandrayaan-1 spacecraft took about twenty-five and a half hours to go round the Earth once. This is the first time an Indian spacecraft has gone beyond the 36,000 km (22,000 mi) high geostationary orbit and reached an altitude more than twice that height.[51]

Third orbit burn

The third orbit raising manoeuvre was initiated on 26 October 2008 at 01:38 UTC when the spacecraft's engine was fired for about nine and a half minutes. With this its apogee was raised to 164,600 km (102,300 mi), and the perigee to 348 km (216 mi). In this orbit, Chandrayaan-1 took about 73 hours to go around the Earth once.[52]

Fourth orbit burn

The fourth orbit-raising manoeuvre took place on 29 October 2008 at 02:08 UTC when the spacecraft's engine was fired for about three minutes, raising its apogee to 267,000 km (166,000 mi) and the perigee to 465 km (289 mi). This extended its orbit to a distance more than half the way to the Moon. In this orbit, the spacecraft took about six days to go around the Earth once.[53]

Final orbit burn

The fifth and final orbit raising manoeuvre was carried out on 3 November 2008 at 23:26 UTC when the spacecraft's engine was fired for about two and a half minutes resulting in Chandrayaan-1 entering the Lunar Transfer Trajectory with an apogee of about 380,000 km (240,000 mi).[54]

Lunar orbit insertion

Lunar orbit insertion
Date (UTC) Burn time
(seconds)
Resulting
periselene
Resulting
aposelene
8 November 817 504 km 7,502 km
9 November 57 200 km 7,502 km
10 November 866 187 km 255 km
11 November 31 101 km 255 km
12 November
Final orbit
100 km 100 km

Chandrayaan-1 completed the lunar orbit insertion operation on 8 November 2008 at 11:21 UTC. This manoeuvre involved firing of the liquid engine for 817 seconds (about thirteen and half minutes) when the spacecraft passed within 500 km (310 mi) from the Moon. The satellite was placed in an elliptical orbit that passed over the polar regions of the Moon, with 7,502 km (4,662 mi) aposelene and 504 km (313 mi) periselene. The orbital period was estimated to be around 11 hours. With the successful completion of this operation, India became the fifth nation to put a vehicle in lunar orbit.[10]

First orbit reduction

First Lunar Orbit Reduction Manoeuvre of Chandrayaan-1 was carried out on 9 November 2008 at 14:33 UTC. During this, the engine of the spacecraft was fired for about 57 seconds. This reduced the periselene to 200 km (124 mi) while aposelene remained unchanged at 7,502 km. In this elliptical orbit, Chandrayaan-1 took about ten and a half hours to circle the Moon once.[55]

Second orbit reduction

This manoeuvre was carried out on 10 November 2008 at 16:28 UTC, resulting in steep decrease in Chandrayaan-1's aposelene to 255 km (158 mi) and its periselene to 187 km (116 mi), During this manoeuvre, the engine was fired for about 866 seconds (about fourteen and a half minutes). Chandrayaan-1 took two hours and 16 minutes to go around the Moon once in this orbit.[56]

Third orbit reduction

Third Lunar Orbit Reduction was carried out by firing the onboard engine for 31 seconds on 11 November 2008 at 13:00 UTC. This reduced the periselene to 101 km (63 mi), while the aposelene remained constant at 255 km. In this orbit Chandrayaan-1 took two hours and 9 minutes to go around the Moon once.[57]

Final orbit

Chandrayaan-1 spacecraft was placed into a mission-specific lunar polar orbit of 100 km (62 mi) above the lunar surface on 12 November 2008.[58][59] In the final orbit reduction manoeuvre, Chandrayaan-1's aposelene and periselene were both reduced to 100 km.[59] In this orbit, Chandrayaan-1 takes about two hours to go around the Moon once. Two of the 11 payloads—the Terrain Mapping Camera (TMC) and the Radiation Dose Monitor (RADOM)—were switched on. The TMC acquired images of both the Earth and the Moon.[59]

Impact of the MIP on the lunar surface

The Moon Impact Probe (MIP) crash-landed on the lunar surface on 14 November 2008, 15:01 UTC near the crater Shackleton at the south pole.[58] The MIP was one of eleven scientific instruments (payloads) on board Chandrayaan-1.[60]

The MIP separated from Chandrayaan at 100 km from lunar surface and began its nosedive at 14:36 UTC. going into free fall for thirty minutes.[58] As it fell, it kept sending information back to the mother satellite which, in turn, beamed the information back to Earth. The altimeter then also began recording measurements to prepare for a rover to land on the lunar surface during a second Moon mission.[61]

Following the deployment of the MIP, the other scientific instruments were turned on, starting the next phase of the mission.[60]

After scientific analyses of the received data from the MIP, the Indian Space Research Organisation confirmed the presence of water in the lunar soil and published the finding in a press conference addressed by its then Chairman G. Madhavan Nair.

Rise of spacecraft's temperature

ISRO had reported on 25 November 2008 that Chandrayaan-1's temperature had risen above normal to 50 °C (122 °F),[62] Scientists said that it was caused by higher than expected temperatures in lunar orbit.[62] The temperature was brought down by about 10 °C (18 °F) by rotating the spacecraft about 20 degrees and switching off some of the instruments.[62] Subsequently, ISRO reported on 27 November 2008 that the spacecraft was operating under normal temperature conditions.[63] In subsequent reports ISRO says, since the spacecraft was still recording higher than normal temperatures, it would be running only one instrument at a time until January 2009 when lunar orbital temperature conditions are said to stabilize.[64] It was initially thought that the spacecraft was experiencing high temperature because of radiation from the Sun and infrared radiation reflected by the Moon.[65] However the rise in spacecraft temperature was later attributed to a batch of DC-DC converters with poor thermal regulation.[66][67]

Mapping of minerals

The mineral content on the lunar surface was mapped with the Moon Mineralogy Mapper (M3), a NASA instrument on board the orbiter. The presence of iron was reiterated and changes in rock and mineral composition have been identified. The Oriental Basin region of the Moon was mapped, and it indicates abundance of iron-bearing minerals such as pyroxene.[68]

In 2018 it was announced that M3 infrared data had been re-analyzed to confirm the existence of water across wide expanses of the Moon's polar regions.[69]

Mapping of Apollo landing sites

ISRO announced in January 2009 the completion of the mapping of the Apollo Moon missions landing sites by the orbiter, using multiple payloads. Six of the sites have been mapped including landing sites of Apollo 15 and Apollo 17.[70]

Image acquisition

The craft completed 3,000 orbits acquiring 70,000 images of the lunar surface,[71][72][73] which is quite a record compared to the lunar flights of other nations. ISRO officials estimated that if more than 40,000 images have been transmitted by Chandrayaan's cameras in 75 days, it worked out to nearly 535 images being sent daily. They were first transmitted to Indian Deep Space Network at Byalalu near Bangalore, from where they were flashed to ISRO's Telemetry Tracking And Command Network (ISTRAC) at Bangalore.

Some of these images have a resolution of down to 5 metres (16 ft), providing a sharp and clear picture of the Moon's surface, while many images sent by some of the other missions had only a 100-metre resolution.[74] For comparison, the Lunar Reconnaissance Orbiter Camera has a 0.5 meter resolution.[75]

On 26 November, the indigenous Terrain Mapping Camera, which was first activated on 29 October 2008, acquired images of peaks and craters. This came as a surprise to ISRO officials because the Moon consists mostly of craters.[76]

Detection of X-Ray signals

The X-ray signatures of aluminium, magnesium and silicon were picked up by the C1XS X-ray camera. The signals were picked up during a solar flare that caused an X-ray fluorescence phenomenon. The flare that caused the fluorescence was within the lowest C1XS sensitivity range.[77][78][79]

Full Earth image

On 25 March 2009 Chandrayaan beamed back its first images of the Earth in its entirety. These images were taken with the TMC. Previous imaging was done on only one part of the Earth. The new images show Asia, parts of Africa and Australia with India being in the center.[80][81]

Orbit raised to 200 km

After the completion of all the major mission objectives, the orbit of Chandrayaan-1 spacecraft, which had been at a height of 100 km (62 mi) from the lunar surface since November 2008, was raised to 200 km (124 mi). The orbit raising manoeuvres were carried out between 03:30 and 04:30 UTC on 19 May 2009. The spacecraft in this higher altitude enabled further studies on orbit perturbations, gravitational field variation of the Moon and also enabled imaging lunar surface with a wider swath.[82] It was later revealed that the true reason for the orbit change was that it was an attempt to keep the temperature of the probe down.[83] It was "...assumed that the temperature [of the spacecraft subsystems] at 100 km above the Moon's surface would be around 75 degrees Celsius. However, it was more than 75 degrees and problems started to surface. We had to raise the orbit to 200 km."[84]

Attitude sensor failure

The star tracker, a device used for pointing attitude determination (orientation), failed in orbit after nine months of operation. Afterward, the orientation of Chandrayaan was determined using a back-up procedure using a two-axis Sun sensor and taking a bearing from an Earth station. This was used to update three axis gyroscopes which enabled spacecraft operations.[71][72][73] The second failure, detected on 16 May, was attributed to excessive radiation from the Sun.[85]

Radar scans

On 21 August 2009 Chandrayaan-1 along with the Lunar Reconnaissance Orbiter attempted to perform a bistatic radar experiment using their Mini-SAR radars to detect the presence of water ice on the lunar surface.[86][87] The attempt was a failure; it turned out the Chandrayaan-1 radar was not pointed at the Moon during the experiment.[88]

The Mini-SAR has imaged many of the permanently shadowed regions that exist at both poles of the Moon.[89] In March 2010, it was reported that the Mini-SAR on board the Chandrayaan-1 had discovered more than 40 permanently darkened craters near the Moon's north pole which are hypothesized to contain an estimated 600 million metric tonnes of water-ice.[89][90] The radar's high CPR is not uniquely diagnostic of either roughness or ice; the science team must take into account the environment of the occurrences of high CPR signal to interpret its cause. The ice must be relatively pure and at least a couple of meters thick to give this signature.[89] The estimated amount of water ice potentially present is comparable to the quantity estimated from the previous mission of Lunar Prospector's neutron data.[89]

Although the results are consistent with recent findings of other NASA instruments onboard Chandrayaan-1 (the Moon Mineralogy Mapper (MP3) discovered water molecules in the Moon's polar regions, while water vapour was detected by NASA's Lunar Crater Observation and Sensing Satellite, or LCROSS[89]) this observation is not consistent with the presence of thick deposits of nearly pure water ice within a few meters of the lunar surface, but it does not rule out the presence of small (<∼10 cm), discrete pieces of ice mixed in with the regolith.[91]

End of the mission

The mission was launched on 22 October 2008 and expected to operate for two years. However, around 20:00 UTC on 28 August 2009 communication with the spacecraft was suddenly lost. The probe had operated for 312 days. The craft had been expected to remain in orbit for approximately another 1000 days and to crash into the lunar surface in late 2012,[92] although in 2016 it was found to still be in orbit.[21]

A member of the science advisory board of Chandrayaan-1 said that it is difficult to ascertain reasons for the loss of contact.[93] ISRO Chairman Madhavan Nair said that due to very high radiation, power-supply units controlling both the computer systems on board failed, snapping the communication connectivity.[94] However, information released later showed that the power supply supplied by MDI failed due to overheating.[83][84][95]

Although the mission was less than 10 months in duration, and less than half the intended two years in length,[8][94][96] a review by scientists termed the mission successful, as it had completed 95% of its primary objectives.

Results

Chandrayaan's NASA Instrument Moon Mineralogy Mapper has confirmed the magma ocean hypothesis, meaning that the Moon was once completely molten.[97]

The terrain mapping camera on board Chandrayaan-1, besides producing more than 70,000 three dimensional images, has recorded images of the landing site of U.S. spacecraft Apollo 15.[98][99]

TMC and HySI payloads of ISRO have covered about 70% of the lunar surface, while M3 covered more than 95% of the same and SIR-2 has provided high-resolution spectral data on the mineralogy of the Moon.

Indian Space Research Organisation said interesting data on lunar polar areas was provided by Lunar Laser Ranging Instrument (LLRI) and High Energy X-ray Spectrometer (HEX) of ISRO as well as Miniature Synthetic Aperture Radar (Mini-SAR) of the USA.

LLRI covered both the lunar poles and additional lunar regions of interest, HEX made about 200 orbits over the lunar poles and Mini-SAR provided complete coverage of both North and South Polar Regions of the Moon.

Another ESA payload – Chandrayaan-1 imaging X-ray Spectrometer (C1XS) – detected more than two dozen weak solar flares during the mission duration. The Bulgarian payload called Radiation Dose Monitor (RADOM) was activated on the day of the launch itself and worked until the mission's end.

ISRO said scientists from India and participating agencies expressed satisfaction on the performance of Chandrayaan-1 mission as well as the high quality of data sent by the spacecraft.

They have started formulating science plans based on the data sets obtained from the mission. It is expected that in the next few months, interesting results about lunar topography, mineral and chemical contents of the Moon and related aspects are expected to be published.[100]

The Chandrayaan-1 payload has enabled scientists to study the interaction between the solar wind and a planetary body like the Moon without a magnetic field.[101]

In its 10-month orbit around the Moon, Chandrayaan-1's X-ray Spectrometer (C1XS) detected titanium, confirmed the presence of calcium, and gathered the most accurate measurements yet of magnesium, aluminium and iron on the lunar surface.[102]

Lunar water discovery

Direct evidence of lunar water through Chandrayaan-1 Chandra's Altitudinal Composition (CHACE) output profile
These images show a very young lunar crater on the side of the Moon that faces away from Earth, as viewed by Chandrayaan-1's NASA Moon Mineralogy Mapper equipment

On 18 November 2008, the Moon Impact Probe was released from Chandrayaan-1 at a height of 100 km (62 mi). During its 25-minute descent, Chandra's Altitudinal Composition Explorer (CHACE) recorded evidence of water in 650 mass spectra readings gathered during this time.[103] On 24 September 2009 Science journal reported that the Nasa Instrument Moon Mineralogy Mapper (M3) on Chandrayaan-1 had detected water ice on the Moon.[104] But, on 25 September 2009, ISRO announced that the MIP, another instrument on board Chandrayaan-1, had discovered water on the Moon just before impact and had discovered it 3 months before NASA's M3.[105] The announcement of this discovery was not made until NASA confirmed it.[106][107]

M3 detected absorption features near 2.8–3.0 µm on the surface of the Moon. For silicate bodies, such features are typically attributed to hydroxyl- and/or water-bearing materials. On the Moon, the feature is seen as a widely distributed absorption that appears strongest at cooler high latitudes and at several fresh feldspathic craters. The general lack of correlation of this feature in sunlit M3 data with neutron spectrometer H abundance data suggests that the formation and retention of OH and H2O is an ongoing surficial process. OH/H2O production processes may feed polar cold traps and make the lunar regolith a candidate source of volatiles for human exploration.

The Moon Mineralogy Mapper (M3), an imaging spectrometer, was one of the 11 instruments on board Chandrayaan-I that came to a premature end on 28 August 2009.[108] M3 was aimed at providing the first mineral map of the entire lunar surface. M3 data were reanalyzed years later and revealed "the most definitive proof to date" of the presence of water in shaded regions of craters near the Moon's north and south poles.[69]

Lunar scientists had discussed the possibility of water repositories for decades. They are now increasingly "confident that the decades-long debate is over" a report says. "The Moon, in fact, has water in all sorts of places; not just locked up in minerals, but scattered throughout the broken-up surface, and, potentially, in blocks or sheets of ice at depth." The results from the Chandrayaan mission are also "offering a wide array of watery signals."[109][110]

Lunar water production

According to European Space Agency (ESA) scientists, the lunar regolith (a loose collection of irregular dust grains making up the Moon's surface) absorbs hydrogen nuclei from solar winds. Interaction between the hydrogen nuclei and oxygen present in the dust grains is expected to produce hydroxyl (HO
) and water (H
2
O
).[111]

The SARA (Sub keV Atom Reflecting Analyser) instrument developed by ESA and the Indian Space Research Organisation was designed and used to study the Moon's surface composition and solar-wind/surface interactions. SARA's results highlight a mystery: not every hydrogen nucleus is absorbed. One out of every five rebounds into space, combining to form an atom of hydrogen. Hydrogen shoots off at speeds of around 200 kilometres per second (120 mi/s) and escapes without being deflected by the Moon's weak gravity. This knowledge provides timely advice for scientists who are readying ESA's BepiColombo mission to Mercury, as that spacecraft will carry two instruments similar to SARA.

Lunar caves

Chandrayaan-1 imaged a lunar rille, formed by an ancient lunar lava flow, with an uncollapsed segment indicating the presence of a lunar lava tube, a type of large cave below the lunar surface.[112] The tunnel, which was discovered near the lunar equator, is an empty volcanic tube, measuring about 2 km (1.2 mi) in length and 360 m (1,180 ft) in width. According to A. S. Arya, scientist SF of Ahmedabad-based Space Application Centre (SAC), this could be a potential site for human settlement on the Moon.[113] Earlier, Japanese Lunar orbiter SELENE (Kaguya) also recorded evidence for other caves on the Moon.[114]

Tectonism

Data from the microwave sensor (Mini-SAR) of Chandrayaan-1 processed using the image analysis software ENVI, has revealed a good amount of past tectonic activity on the lunar surface.[115] The researchers think that the faults and fractures discovered could be features of past interior tectonic activity coupled with meteorite impacts.[115]

Awards

Team

The scientists considered instrumental to the success of the Chandrayaan-1 project are:[120][121][122]

  • G. Madhavan Nair – Chairman, Indian Space Research Organisation
  • T. K. Alex – Director, ISAC (ISRO Satellite Centre)
  • Mylswamy Annadurai – Project Director, Chandrayan-1
  • S. K. Shivkumar – Director – Telemetry, Tracking and Command Network
  • M. Pitchaimani – Operations Director, Chandrayan-1
  • Leo Jackson John – Spacecraft Operations Manager, Chandrayan-1
  • K. Radhakrishnan – Director, VSSC
  • George Koshy – Mission Director, PSLV-C11
  • Srinivasa Hegde – Mission Director, Chandrayaan-1
  • Jitendra Nath Goswami – Director of Physical Research Laboratory and Principal Scientific Investigator of Chandrayaan-1
  • Madhavan Chandradathan – Head, Launch Authorization Board, Chandrayan-1[123]

Public release of data

Data gathered by Chandrayaan-I was made available to the public by the end of the year 2010. The data was split into two seasons with the first season going public by the end of 2010 and the second going public by the mid of 2011. The data contained pictures of the Moon and also data of chemical and mineral mapping of the lunar surface.[124]

Follow-up missions

Chandrayaan-2 is a follow-up mission which was launched on 22 July 2019.[125] The mission includes a lunar orbiter, a lander named Vikram and a robotic lunar rover named Pragyan. The rover was designed to move on six wheels on the lunar surface, do on-site chemical analysis and send the data to the Earth via the Chandrayaan-2 orbiter, which will be orbiting the Moon.[126] The third mission, called Chandrayaan-3 is tentatively scheduled for 2024.[127][128]

Lunar outpost

Chandrayaan's imagery will be used to identify regions of interest that will be explored in detail by the NASA Lunar Reconnaissance Orbiter. The interest lies in identifying lunar water on the surface that can be exploited in setting up a future lunar outpost. The Mini-SAR, one of the U.S. payloads on Chandrayaan, was used to determine the presence of water ice.[129]

See also

References

  1. "Spacecraft Description". ISRO. Archived from the original on 28 October 2008. Retrieved 4 November 2008.
  2. Datta, Jayati; Chakravarty, S. C. "Chandrayaan-1 India's First Mission to Moon" (PDF). VSSC.gov.in. Archived from the original (PDF) on 16 August 2019. Retrieved 16 August 2019.
  3. "Mission Sequence". ISRO. Retrieved 5 November 2008.
  4. "Chandrayaan-1 shifted to VAB". The Hindu. 22 October 2008. Retrieved 15 October 2008.
  5. "Chandrayaan-I Spacecraft Loses Radio Contact". ISRO. 29 August 2009. Archived from the original on 30 August 2009. Retrieved 31 August 2009.
  6. "India delays mission to land a rover on the moon". CNN.
  7. "PSLV-C11 Successfully Launches Chandrayaan-1". ISRO. 22 October 2008. Archived from the original on 7 January 2012. Retrieved 11 March 2012.
  8. Bagla, Pallava (31 August 2009). "India Moon mission is 'mixed success'". BBC News. Retrieved 1 September 2009.
  9. Pasricha, Anjana (22 October 2008). "India Launches First Unmanned Mission to Moon". Voice of America. Archived from the original on 1 August 2009. Retrieved 27 December 2008.
  10. "Chandrayaan-1 Successfully Enters Lunar Orbit". ISRO. Archived from the original on 30 June 2014. Retrieved 8 November 2008.
  11. "Tricolour's 4th national flag on Moon". The Economic Times. 15 November 2008. Archived from the original on 12 January 2009. Retrieved 18 November 2008.
  12. "Chandrayaan team over the Moon". The Hindu. 15 November 2008.
  13. "8.4 Chandrayaan-1 Mission The New Face of the Moon by J.N. GOSWAMI". From Fishing Hamlet To Red Planet. Harper Collins. 2015. p. 506. ISBN 978-9351776895. The landing site of the MIP was named ‘Jawahar Sthal’ to commemorate the birthday of India’s first Prime Minister, Jawaharlal Nehru, which also falls on 14 November coinciding with the date of the MIP impact.
  14. Acharya, Prasanna; Singh, Jitendra (3 August 2017). "Question No. 2222: Status of Chandrayaan Programme" (PDF). Rajya Sabha.
  15. Bhandari N. (2005). "Title: Chandrayaan-1: Science goals" (PDF). Journal of Earth System Science. 114 (6): 699. Bibcode:2005JESS..114..701B. doi:10.1007/BF02715953. S2CID 55469375.
  16. VOA News - Chandrayaan Lunar Probe detects water on Moon
  17. "Chandrayaan-1 mission terminated". The Hindu. 31 August 2009. Retrieved 31 August 2009.
  18. "Chandrayaan, India's first Moon mission is over: Project Director". Indian Express. Press Trust of India. 29 August 2009. Retrieved 19 September 2014.
  19. "Chandrayan not a failure: NASA astronaut". Press Trust of India. Retrieved 17 September 2009.
  20. Karimi, Faith (10 March 2017). "NASA finds lunar spacecraft that vanished 8 years ago". CNN. Retrieved 10 March 2017.
  21. Agle, D. C. (9 March 2017). "New NASA Radar Technique Finds Lost Lunar Spacecraft". NASA. Retrieved 10 March 2017.
  22. Udhayakumar, M.; Singh, Jitendra (2 August 2017). "Question No. 2783: Chandrayaan-1" (PDF). Lok Sabha. Archived from the original (PDF) on 2 August 2017. Retrieved 2 August 2017.
  23. "2003 - An Eventful Year for ISRO - ISRO". www.isro.gov.in. Retrieved 24 July 2019.
  24. India's Moon mission: nine years in the landing
  25. "Chandrayaan-1: India's first scientific mission to the Moon" (PDF). Archived from the original (PDF) on 2 August 2014. Retrieved 17 August 2015.
  26. "Objectives". ISRO. Archived from the original on 26 October 2008. Retrieved 22 October 2008.
  27. "Specifications of Chandrayaan 1". Indian Space Research Organisation. October 2008. Archived from the original on 23 October 2008. Retrieved 22 October 2008.
  28. "FAQ on Chandrayaan 1". Indian Space Research Organisation. October 2008. Archived from the original on 7 November 2008. Retrieved 22 October 2008.
  29. A. S. Kiran Kumar; A. Roy Chowdhury (2005). "Terrain mapping camera for Chandrayaan-1" (PDF). J. Earth Syst. Sci. 114 (6): 717–720. Bibcode:2005JESS..114..717K. doi:10.1007/BF02715955. S2CID 189885169.
  30. "Chandrayaan 1 – The payloads". Archived from the original on 2 April 2012. Retrieved 15 March 2012.
  31. "Chandrayaan-1 Camera Tested". ISRO. Archived from the original on 27 August 2009. Retrieved 1 November 2008.
  32. "LASER Instrument on Chandrayaan-1 Successfully Turned ON". ISRO. Archived from the original on 27 August 2009. Retrieved 17 November 2008.
  33. "Laser instrument on board Chandrayaan-1 activated". The Hindu. 17 November 2008. Retrieved 17 November 2008.
  34. "Chandrayaan-1: The Payloads". ISRO. Archived from the original on 2 April 2012. Retrieved 15 March 2012.
  35. "The Chandrayaan-1 X-ray Spectrometer: C1XS". Rutherford Appleton Laboratory. Archived from the original on 16 July 2011. Retrieved 21 October 2008.
  36. "Chandrayaan-1 Starts Observations of the Moon". Space Daily. 24 November 2008. Retrieved 26 November 2008.
  37. Bhardwaj, Anil; Barabash, Stas; Futaana, Yoshifumi; Kazama, Yoichi; Asamura, Kazushi; McCann, David; Sridharan, R.; Holmstrom, Mats; Wurz, Peter; Lundin, Rickard (December 2005). "Low energy neutral atom imaging on the Moon with the SARA instrument aboard Chandrayaan-1 mission" (PDF). Journal of Earth System Science. 114 (6): 749–760. Bibcode:2005JESS..114..749B. doi:10.1007/BF02715960. S2CID 55554166.
  38. "Sub keV Atom Reflecting Analyser (SARA)". ISRO. Archived from the original on 22 October 2008. Retrieved 3 November 2008.
  39. "NASA Instrument Inaugurates 3-D Moon Imaging". JPL. Retrieved 19 December 2008.
  40. Basilevsky A. T.; Keller H. U.; Nathues A.; Mall J.; Hiesinger H.; Rosiek M.; Space Science (2004). "Scientific objectives and selection of targets for the SMART-2 Infrared Spectrometer (SIR)". Planetary. 52 (14): 1261–1285. Bibcode:2004P&SS...52.1261B. doi:10.1016/j.pss.2004.09.002.
  41. "Near-IR Spectrometer (SIR-2)". ISRO. Archived from the original on 22 October 2008. Retrieved 3 November 2008.
  42. P. D. Spudis; B. Bussey; C. Lichtenberg; B. Marinelli; S. Nozette (2005). "mini-SAR: An Imaging Radar for the Chandrayaan 1 Mission to the Moon". Lunar and Planetary Science. 26: 1153.
  43. "Miniature Synthetic Aperture Radar (Mini-SAR)". ISRO. Archived from the original on 6 November 2008. Retrieved 3 November 2008.
  44. "Nasa Radar Tandem Searches For Ice on the Moon". NASA. Retrieved 26 March 2012.
  45. "Radiation Dose Monitor Experiment (RADOM )". ISRO. Archived from the original on 19 January 2012. Retrieved 3 November 2008.
  46. "Chandrayaan-1 - ISRO". www.isro.gov.in. Retrieved 23 August 2019.
  47. "How Chandrayaan-1 is raised to higher orbits". The Hindu. 30 October 2008. Retrieved 31 October 2008.
  48. "Chandrayaan-1 successfully put into earth's orbit". Indian express. 22 October 2008. Retrieved 22 October 2008.
  49. "100 days of Chandrayaan-1 launch". The Times of India. Times News Network. 22 January 2009. Retrieved 8 August 2017.
  50. "Chandrayaan-1 Spacecraft's Orbit Raised". Indian Space Research Organisation. 23 October 2008. Retrieved 8 August 2017.
  51. "Chandrayaan-1 Spacecraft's Orbit Raised Further". ISRO. Archived from the original on 27 August 2009. Retrieved 30 October 2008.
  52. "Chandrayaan-1 enters Deep Space". ISRO. Archived from the original on 27 August 2009. Retrieved 30 October 2008.
  53. "Chandrayaan-1's orbit closer to Moon". ISRO. Archived from the original on 27 August 2009. Retrieved 30 October 2008.
  54. "Chandrayaan-1 enters Lunar Transfer Trajectory". ISRO. Archived from the original on 27 August 2009. Retrieved 4 November 2008.
  55. "First Lunar Orbit Reduction Manoeuvre of Chandrayaan-1 Successfully Carried Out". ISRO. Archived from the original on 28 September 2009. Retrieved 10 November 2008.
  56. "Now, one step closer to Moon". The Hindu. 11 November 2008. Retrieved 10 November 2008.
  57. "Chandrayaan's orbit further reduced". The Hindu. 12 November 2008. Retrieved 11 November 2008.
  58. Jonathan McDowell (15 November 2008). "Jonathan's Space Report No. 603". Jonathan's Space Report. Archived from the original on 10 September 2018. Retrieved 16 November 2008.
  59. "Chandrayaan-1 Successfully Reaches its Operational Lunar Orbit". ISRO. Archived from the original on 27 August 2009. Retrieved 12 November 2008.
  60. Laxman, Srinivas (15 November 2008). "Chandrayaan-I Impact Probe lands on the Moon". Times of India. Retrieved 14 November 2008.
  61. "India to go alone in second Moon mission". UMMID. 18 August 2013. Retrieved 15 September 2013.
  62. Natarajan, Swaminathan (25 November 2008). "India moon craft hit by heat rise". BBC News. Retrieved 28 November 2008.
  63. "All fine with Chandrayaan-1: ISRO chief". The Times of India. 27 November 2008. Retrieved 27 November 2008.
  64. "Chandrayaan-1 takes summer break till mid Jan". Economic Times. 27 November 2008. Retrieved 27 November 2008.
  65. "Indian Moon probe feels the heat". New Scientist. 27 November 2008. Retrieved 27 November 2008.
  66. "Dr M Annadurai, Project director, Chandrayaan 1: 'Chandrayaan 2 logical extension of what we did in first mission'". The Indian Express. 29 June 2019. Retrieved 9 July 2019.
  67. Bagla, Pallava (22 October 2010). "Celebrating India's moon moment". The Hindu. ISSN 0971-751X. Retrieved 9 July 2019.
  68. "Chandrayaan reveals changes in rock composition". The Times of India. 26 December 2008. Retrieved 12 January 2009.
  69. Fortin, Jacey (22 August 2018). "Ice on the Surface of the Moon? Almost Certainly, New Research Shows". The New York Times. Retrieved 22 August 2018.
  70. "Results from Chandrayaan 1 mission". ISRO website. Archived from the original on 23 October 2014. Retrieved 23 October 2014.
  71. "Chandrayaan sensor fails; craft's life may be reduced". The Hindu. 17 July 2009. Retrieved 17 July 2009.
  72. "Chandrayaan-1 spacecraft completes 3000 orbits around the Moon". ISRO. Archived from the original on 27 August 2009. Retrieved 18 July 2009.
  73. "Chandrayaan falters as 'star sensors' fail". The Hindu. 18 July 2009. Retrieved 18 July 2009.
  74. http://www.ufo-blogger.com/2009/01/indian-moon-mission-pictures-show.html
  75. http://lroc.sese.asu.edu/about
  76. Laxman, Srinivas (15 January 2009). "Chandrayaan beams back 40,000 images in 75 days". Times of India. Retrieved 16 January 2009.
  77. "C1XS Catches First Glimpse of X-rays from the Moon". ISRO. 23 January 2009. Archived from the original on 26 September 2009. Retrieved 16 February 2009.
  78. "Chandrayaan detects X-ray signals". The Hindu. 24 January 2009. Retrieved 25 January 2009.
  79. "Chandrayaan-1 Instrument Detects First X-ray Signature from Moon". Universe Today. 23 January 2009. Retrieved 25 January 2009.
  80. Gandhi, Divya (11 April 2009). "Chandrayaan's first image of Earth in its entirety". The Hindu. Retrieved 12 March 2017.
  81. "Image of Earth from Chandrayaan-1". The Planetary Society. 25 March 2009. Retrieved 12 March 2017.
  82. "The Orbit of Chandrayaan-1 Raised". ISRO. Archived from the original on 17 August 2009. Retrieved 21 May 2009.
  83. "Moon's heat hastened Indian probe's demise", New Scientist, 12 September 2009, p. 5.
  84. Pereira, Andrew (7 September 2009). "Chandrayaan-I was 'killed' by heat stroke". The Times of India. Retrieved 13 March 2012.
  85. "Chandrayaan's first sensor failed much earlier". The Hindu. 19 July 2009. Retrieved 19 July 2009.
  86. "NASA And ISRO Satellites Perform In Tandem To Search For Ice on the Moon". NASA. Retrieved 22 August 2009.
  87. "ISRO-NASA Joint Experiment To Search for Water Ice on the Moon". ISRO. 21 August 2009. Archived from the original on 1 September 2009. Retrieved 22 August 2009.
  88. Atkinson, Nancy (11 September 2011). "Joint Experiment with Chandrayaan-1 and LRO Failed". Universe Today. Retrieved 26 March 2012.
  89. "NASA Radar Finds Ice Deposits at Moon's North Pole". NASA. March 2010. Retrieved 26 March 2012.
  90. "Ice deposits found at Moon's pole", BBC News, 2 March 2010
  91. D. B. J. Bussey, C. D. Neish; P. Spudis; W. Marshall; B. J. Thomson; G. W. Patterson; L. M. Carter (13 January 2011). "The nature of lunar volatiles as revealed by Mini-RF observations of the LCROSS impact site". Journal of Geophysical Research: Planets. 116 (E01005): 8. Bibcode:2011JGRE..116.1005N. doi:10.1029/2010JE003647. Retrieved 26 March 2012. the Mini-RF instruments on ISRO's Chandrayaan-1 and NASA's Lunar Reconnaissance Orbiter (LRO) obtained S band (12.6 cm) synthetic aperture radar images of the impact site at 150 and 30 m resolution, respectively. These observations show that the floor of Cabeus has a circular polarization ratio (CPR) comparable to or less than the average of nearby terrain in the southern lunar highlands. Furthermore, <2% of the pixels in Cabeus crater have CPR values greater than unity. This observation is not consistent with presence of thick deposits of nearly pure water ice within a few meters of lunar surface, but it does not rule out the presence of small (<∼10 cm), discrete pieces of ice mixed in with the regolith.
  92. Chandrayaan-1 off radar, but will work for 1000 days. The Economic Times 21 September 2009.
  93. ISRO Loses Chandrayaan-1
  94. Chandrayaan-1 mission terminated The Hindu. 31 August 2009.
  95. Power supply glitch partially cripples Insat-4B, HinduBusiness Line, Retrieved 13 July 2010.
  96. Chandrayaan 1 Mission Terminated Archived 13 August 2011 at the Wayback Machine
  97. "Chandrayaan confirms Moon was once completely molten: Scientist". Economic Times. 2 September 2009. Archived from the original on 6 September 2009. Retrieved 26 September 2009.
  98. "Scientist Rubbishes Apollo 15 Conspiracy Theory". Moondaily.com. 4 September 2009. Archived from the original on 8 September 2009. Retrieved 26 September 2009.
  99. "Chandrayaan sends images of Apollo 15 landing". The Times of India. 2 September 2009. Retrieved 26 September 2009.
  100. "Chandrayaan Enables Study Interaction Without Magnetic Field". SpaceDaily.com. 10 September 2009. Archived from the original on 14 September 2009. Retrieved 26 September 2009.
  101. "Chandrayaan enables study interaction without magnetic field". DNAIndia.com. 8 September 2009. Retrieved 26 September 2009.
  102. "Solar flares shine light on Moon's minerals". The Hindu. 19 September 2009. Retrieved 26 September 2009.
  103. http://www.planetary.org/blogs/emily-lakdawalla/2010/2430.html
  104. "Character and Spatial Distribution of OH/H2O on the Surface of the Moon Seen by M3 on Chandrayaan-1". Science Mag. 15 September 2009. Retrieved 26 September 2009.
  105. "MIP detected water on Moon way back in June: ISRO Chairman". The Hindu. Bangalore. 25 September 2009. Retrieved 9 June 2013.
  106. "Chandrayaan first discovered water on Moon, but?". DNA. Bangalore. DNA. 25 September 2009. Retrieved 9 June 2013.
  107. Bagla, Pallav (25 September 2009). "Did India beat NASA to find water on Moon?". NDTV. Bangalore. Retrieved 9 June 2013.
  108. "Welcome To ISRO:: Press Release:: 29 August 2009". Archived from the original on 3 September 2012. 101004 isro.org
  109. "It's not lunacy, probes find water in Moon dirt". USA Today. 23 September 2009. Retrieved 26 September 2009.
  110. "Water discovered on Moon?: "A lot of it actually"". The Hindu. 23 September 2009. Retrieved 26 September 2009.
  111. India Space Programs and Exploration Handbook
  112. A. S. Arya, R. P. Rajasekhar, Guneshwar Thangjam, Ajai and A. S. Kiran Kumar, "Detection of potential site for future human habitability on the Moon using Chandrayaan-1 data", Current Science, Vol. 100, NO. 4, 25 February 2011 (accessed 24 January 2015)
  113. "After water, now Indian scientists find cave on Moon". Silicon India. 9 February 2010.
  114. Drake, Nadia (25 March 2016). "Scientists May Have Spotted Buried Lava Tubes on the Moon". National Geographic.
  115. Priyadarshini, Subhra (25 April 2014). "Moon shows Earth-like tectonic activity". Nature India. doi:10.1038/nindia.2014.57. Retrieved 29 April 2014.
  116. American astronautics society award for Chandrayaan-1 team news
  117. Choudhury, Shubhadeep (30 November 2008). "Chandrayaan-1 wins global award". Bangalore. Tribune News Service. Retrieved 2 February 2015.
  118. "NSS awards for 2009". National Space Society. Retrieved 2 February 2015.
  119. Hoover, Rachel (17 June 2010). "NASA's Lunar Impact Mission Honored by National Space Society". National Aeronautics and Space Administration. Retrieved 2 February 2015.
  120. "The men behind the mission". NDTV. 22 October 2008. Archived from the original on 26 October 2008. Retrieved 31 October 2008.
  121. "Looking beyond Chandrayaan-1". Economic Times. 15 October 2008. Retrieved 30 October 2008.
  122. "The Chandrayaan Team". Zee News. Retrieved 30 October 2008.
  123. "Launch authorization board". Telegraph India. 23 October 2008. Retrieved 28 October 2014.
  124. "Data From Chandrayaan Moon Mission To Go Public". Space-Travel. 6 September 2010. Archived from the original on 9 September 2010. Retrieved 10 September 2010.
  125. "GSLV MkIII-M1 Successfully Launches Chandrayaan-2 spacecraft - ISRO". www.isro.gov.in. Retrieved 23 July 2019.
  126. Rathinavel, T.; Singh, Jitendra (24 November 2016). "Question No. 1084: Deployment of Rover on Lunar Surface" (PDF). Rajya Sabha.
  127. After Mars, ISRO to Set a Date with Venus. Archived 16 July 2019 at the Wayback Machine Trak. Malvika Gurung. 20 May 2019.
  128. After Reaching Mars, India's Date With Venus In 2023 Confirmed, Says ISRO. U. Tejonmayam, India Times. 18 May 2019.
  129. David, Leonard (26 December 2006). "Moonbase: In the Dark on Lunar Ice". Space.com.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.