Keystone Service

Amtrak's 195-mile (314 km) Keystone Service provides frequent regional passenger train service between the Harrisburg Transportation Center in Harrisburg, Pennsylvania and 30th Street Station in Philadelphia, running along the Philadelphia to Harrisburg Main Line (Keystone Corridor). Most trains continue along the Northeast Corridor (NEC) to Pennsylvania Station in New York.

Keystone Service
A Keystone Service train at Lancaster, Pennsylvania in 2019
Overview
Service typeRegional rail
High-speed rail (some portions)
StatusOperating
PredecessorPenn Central corridor trains
First serviceOctober 29, 1972
Current operator(s)Amtrak
Ridership1,467,216 (FY16)[1]
Route
StartPhiladelphia, Pennsylvania or New York City, New York
Stops19
EndHarrisburg, Pennsylvania
Distance travelled195 miles (314 km)
Average journey time3 hours 30 mins (New York–Harrisburg), 1 hour 45 mins (Philadelphia–Harrisburg)[2]
Service frequency13 daily round trips
Train number(s)600–601, 605, 607, 609–612, 615, 618–620, 622, 637, 639–656, 658, 660–667, 669–672, 674
On-board services
Seating arrangementsUnreserved Coach Seating (Philadelphia–Harrisburg), Reserved Coach Seating (New York–Philadelphia)
Technical
Rolling stock
ElectrificationAC Overhead Catenary at 12 kV, 25 Hz
Operating speedUp to 125 miles per hour (201 km/h)

Travel time between Harrisburg and New York is approximately 3 hours and 30 minutes, including 1 hour and 45 minutes to travel between Harrisburg and Philadelphia. There are also several express trains which cut both journey times by approximately 15 minutes.[2]

A few portions of the route consist of high-speed rail, where it reaches its max speed of 125 mph (201 km/h), making it one of the four high-speed rail services operated by Amtrak, and one of the five high-speed rail services in the United States.

It is Amtrak's fifth-busiest route, and the railroad's third-busiest in the NEC.[3] In fiscal year 2016, the service carried 1.47 million passengers, an increase of 7.9% over FY2015. Total revenue in FY2016 was $41,123,787, an increase of 7.5% over FY2015.[1] The route is primarily funded by the Pennsylvania Department of Transportation (PennDOT).[2]

History

Takeover from Penn Central

The Keystone Service is the successor of numerous services running along the Philadelphia to Harrisburg Main Line dating from 1857, when the Pennsylvania Railroad (PRR) bought the Philadelphia and Columbia Railroad, enabling service between Philadelphia and Harrisburg.

By the time the PRR folded into Penn Central in 1968, it operated three types of service on the Main Line: commuter service between Paoli and Suburban Station via 30th Street Station, regional service (trains numbered in the 600s) between Harrisburg and Suburban Station via 30th Street Station, and express intercity service like the Broadway Limited and Duquesne, which skipped 30th Street Station entirely and used North Philadelphia station as their only Philadelphia stop.[4]

When the Metroliner high-speed program had begun two years earlier, the state had attempted to capitalize on the opportunity to purchase upgraded rolling stock for the 600-series trains. On August 30, 1966, Governor William Scranton of Pennsylvania announced plans to purchase 11 Metroliners for 80 mph (130 km/h) service to replace the Silverliners then used. The cars were ordered through Philadelphia commuter agency SEPTA, as the state was not permitted to contract directly with the PRR.[5] The state, SEPTA, and PRR reached an agreement on November 3rd; the state and SEPTA would each pay $2 million, funded mostly by mass transit grants from the newly formed Department of Housing and Urban Development (HUD), and the PRR would receive a free 15-year lease of the cars. The PRR soon withdrew after complaints from competing Red Arrow Lines and Capitol Trailways, and the HUD grants were later found not to be applicable to intercity service.[5]

In June 1968, an agreement was reached where the state Transportation Assistance Authority would pay $2 million and Penn Central would pay $2.5 million for the 11 Metroliners for Harrisburg service. On July 14, a 4-car train was tested on the line, with several demonstration runs for officials on August 21.[6] On February 25, 1970, the cars intended for Harrisburg service completed their performance testing. Penn Central refused to accept the cars, citing numerous technical issues with the cars and their general unsuitability for the service. They had worse acceleration than the Silverliners already in service, tended to overheat when making numerous closely spaced stops, and had difficulty climbing the grade out of Suburban Station. Additionally, the corridor lacked high-level platforms to effectively use the cars, and 15 substations would require expensive modifications.[7] The 11 cars were unused for some time before Penn Central ultimately decided to lease the cars for use on the core New York–Washington service. They were moved back to the Budd plant for modifications in April. In July 1970, the state authorized $100,000 to upgrade existing Silverliners for the Harrisburg service instead.[7]

When Amtrak was created to take over intercity passenger rail service in 1971, there was substantial debate about whether some trains constituted intercity services (to be either taken over by Amtrak or discontinued, relieving private companies like Penn Central of the financial burden) or commuter services (to be retained by the private companies unless discontinuance was approved by the ICC). Penn Central alleged that several of its regional services – the 600-series trains, connecting Lancaster–York buses, Clockers, and New York–Chatham service – were intercity services that could be discontinued since they were not included in Amtrak's initial system.

On March 31, 1971, Penn Central filed with ICC to discontinue the 600-series trains at the conclusion of their contract with SEPTA on June 30.[8] The state filed suit against Penn Central on April 7 to stop the discontinuance. On April 23, Penn Central filed in District Court to discontinue the regional services.[8] Five days later, the state and the UTU filed an opposing suit, calling the trains a commuter service. On April 30, Judge John P. Fullam ordered Penn Central to continue operating the trains and referred the case to the ICC.[8]

When Amtrak took over intercity service on May 1, 1971, the 600-series trains continued to be operated by Penn Central, though they were listed in Amtrak schedules.[9] The city of Philadelphia and the state both preferred to have Penn Central rather than Amtrak operate the service, as Amtrak was exempt from state control. On June 21, the ICC ruled that the service was not intercity rail, as sought by the state and not by Penn Central.[8] On August 3, Fullam ordered Penn Central to continue operating the regional services.[8]

On October 29, 1972, after further negotiations with Penn Central, Amtrak took over operation of the 600-series trains as Silverliner Service, named for the Silverliner cars used to run the trains.[10][11] Amtrak assumed formal responsibility for the Silverliner Service and Clockers around April 1974.[12] Penn Central (and later Conrail and finally SEPTA Regional Rail) continued to operate Paoli–Philadelphia commuter service. Amtrak took over ticketing for the Silverliner Service and Clockers from Penn Central on July 1, 1975.[13] On October 26, 1975, SEPTA funded an increase from 9 to 11 daily round trips.[13] Amtrak began including a listing of connecting trains to/from New York City in the November 1975 timetable.[14]

Declining service

In the late 1970s, NJDOT's new Arrow III railcars arrived several years ahead of the completion of electrification projects to allow their use in New Jersey commuter service. Amtrak by this time was desperate for electric propulsion, as the aging GG1 locomotives were reaching the end of their usefulness, replacement E60 locomotives were proving unreliable, and new EMD AEM-7 locomotives were only just beginning to arrive. In April 1978, Amtrak leased 70 of NJDOT's Arrow II cars for use on the Clockers, Keystone Service, and the new Chesapeake.[15] By January 1979, the Arrows were rotated between the Clockers and Silverliner Service. The Arrows had bathrooms and water fountains, making them more suitable for the regional service than the Silverliners.[16] In late 1980, under pressure from NJDOT, Amtrak returned all but 32 of the Arrows, which created a need to find other equipment for the Silverliner Service. Despite being pronounced unsuitable for Harrisburg service a decade before, the Metroliners were the only easily available rolling stock, as they were being slowly retired from the eponymous service. A test run with Metroliners was made on January 20, 1981, and Metroliners were used in revenue service for two weeks in February.[17] Metroliners were used on the New York - Harrisburg Valley Forge for a week in August, and a maintenance facility at Harrisburg opened on October 13, 1981.[17]

As the new AEM-7 locomotives continued to arrive, Amtrak assigned them to haul crack Metroliner trains with Amfleet consists and reassigned the less-reliable Metroliners for the secondary Philadelphia–Harrisburg service, calling them Capitoliners.[18] On October 25, 1981, the service was rebranded as Keystone Service.[19][17] All service was then operated by the Metroliners, which lacked the quick acceleration of the Silverliners and Arrows and made them unsuitable for the service.[17] After a single Metroliner set was withdrawn from Clocker service in March 1982, the Keystone Service was the only remaining use of the Metroliners.[17] On April 24, 1983, a pair of weekday trains – the 9:54 am arrival and 3:55 pm departure from Suburban Station – were renamed Keystone Executive. Intended to attract riders from the western end of the corridor, the trains made intermediate stops only at Lancaster, Downingtown, and 30th Street, with a 99-minute schedule.[20]

The first westbound train of the morning made numerous local stops for commuters to Harrisburg, including some at stations not served by any other Amtrak train. This was first shown in the April 29, 1973 schedule.[21] These one-off stops were gradually dropped: Merion in 1979; 52nd Street and Berwyn in 1980; Radnor and Narberth in 1982; and Bryn Mawr, Overbrook, and Wayne in 1987. Amtrak and SEPTA opened a station in Exton on November 2, 1981 to serve fast-growing suburban areas.[17]

The Silverliner Service carried over one million passengers in 1980, but ridership was in steep decline from a variety of factors.[4] On October 30, 1983, Amtrak reduced the service from 11 to 9 weekday round trips, prompting an 8% drop in ridership.[17][22] A decrease to 6 weekday round trips on January 12, 1986, and 5 round trips on April 27, cut ridership by an additional 45%.[17][22] The cuts included the termination of the Keystone Executive.[23] Despite the loss of service, fares doubled from 1980 to 1987.[4] The single SEPTA round trip past Paoli to Downingtown was cut in 1983, but two round trips were restored in March 1985, with additional midday and weekend service in 1988. Service was further extended to Parkesburg in 1990, with lower fares than Amtrak.[4] By 1990, SEPTA carried 595,000 passengers west of Paoli, twice that of Amtrak's ridership on the entire Keystone Service.[22]

The Metroliner cars, worn out from nearly two decades of heavy use, began to fail frequently. In April 1985, Amtrak began studying the possibility of removing electrification west of Paoli.[17] On-time performance decreased from around 85% in 1985 to below 60% in early 1988.[4] On January 25, 1988, Amtrak began towing the Metroliner cars with AEM-7 locomotives rather than running them under their own power, although the cars had their pantographs up to power lighting and heating systems.[17] A wreck of the Night Owl four days later two took AEM-7 locomotives out of commission, exacerbating a shortage of electric power available to Amtrak.[24] On February 1, Amtrak converted all Keystone Service trains to diesel power and terminated them on the lower level of 30th Street Station, as diesel-powered trains were not allowed in the tunnels to Suburban Station.[17] The change was listed as "temporary" on timetables starting on May 15, 1988 and lasting into 1990.[25][26] After dieselization and the lengthening of schedules, on-time performance jumped up to consistently over 90%.[4]

Through service

At its inception on May 1, 1971, Amtrak ran two through services on the line: the combined New York–Chicago Broadway Limited and New York–St. Louis Spirit of St. Louis (soon renamed National Limited), and the Pittsburgh–New York Duquesne (soon renamed Keystone). The former train stopped only at Lancaster and Paoli between Harrisburg and North Philadelphia; it was intended for long-distance travelers between the East Coast and the Midwest rather than local passengers. The Duquesne/Keystone had one additional stop at Coatesville and was intended for medium-distance intercity travel.[9]

Amtrak discontinued the Keystone on April 30, 1972, leaving the 600-series trains as the only local service along their route. The Broadway Limited and National Limited were split; they added local stops west of Harrisburg, but passengers from between Harrisburg and Philadelphia had to change trains at Harrisburg, Lancaster, Paoli, or Philadelphia to reach stops west of Harrisburg or north of Philadelphia.[27]:64 On October 28, 1973, Amtrak changed the weekday-only Valley Forge from a Philadelphia–New Haven local train to a Harrisburg–New York City train. It only made the same intermediate stops as the Keystone, including no direct service to 30th Street Station.[28] However, its introduction meant that through passengers no longer had to change at Philadelphia or rely on the Broadway Limited, whose on-time performance had plunged to just 6.8% in 1973.[27]:20

Additional local stops in Pennsylvania were later added. On May 19, 1974, Amtrak added weekend service on the Valley Forge: a Saturday train from Harrisburg to Boston, and a Sunday train from Boston to Harrisburg.[12] The weekend service ended on October 26, 1975.[13] On October 28, 1979, Amtrak and SEPTA began the "Ardmore Connection": the Valley Forge began stopping at Ardmore, where a close connection could be made with a SEPTA Paoli–Philadelphia local train.[16] On December 17, 1979, the westbound Valley Forge began stopping at 30th Street rather than bypassing it using the Pittsburgh Subway; however, it retained the Ardmore stop.[16][29]

The Washington sections of the Broadway Limited and National Limited originally split at Harrisburg and reached the Northeast Corridor via the Port Road Branch. The Washington section of the Broadway Limited was rerouted through Philadelphia on October 26, 1975; the National Limited followed suit on October 29, 1978.[27]:41,62 The National Limited was discontinued entirely on October 1, 1979; the state began funding the Pittsburgh–Philadelphia Pennsylvanian as a replacement on April 27, 1980.[27]:75

Harrisburg-bound Keystone Service train at Downingtown, Pennsylvania

At the same time, a pair of Clockers, the westbound Keystone and eastbound Big Apple, were extended to Harrisburg on weekends.[17] They ran within an hour of the Valley Forge's weekday schedule; however, they ran to 30th Street and Suburban stations rather than only serving North Philadelphia.[30] The Keystone was renamed Susquehanna on October 25, 1981.[19] The Big Apple and Susquehanna dropped the Suburban Station stop a year later, but continued to serve 30th Street.[31] On October 30, 1983, the Pennsylvanian was extended to New York City, eliminating the transfer at Philadelphia (although it continued to stop at 30th Street).[32] On January 12, 1986, the eastbound Valley Forge began serving 30th Street (as the westbound had for six years); this allowed it to effectively replace a canceled Keystone Service train (#600, the first morning eastbound) to serve commuters.[17][23]

Amtrak began operating the Atlantic City–Philadelphia Atlantic City Express in 1989, and later extended it along several busy corridors in hopes of increasing ridership. On April 4, 1991, one daily Keystone Service round trip was extended to Atlantic City under the Atlantic City Express brand. Only a weekend round trip continued to be through-routed. The Atlantic City Express was discontinued on April 2, 1995; New Jersey Transit Atlantic City Line trains continue to serve 30th Street Station.[33]

Modern improvements

In November 1996, as part of a general cutback of Regional Rail service, SEPTA cut service back to Downingtown, leaving Parkesburg and Coatesville as Amtrak-only stations.[34] Amtrak added the stations to several existing round trips as a result.[35] Amtrak discontinued its stops at Whitford and Malvern (both served only by a single round trip) on April 5, 1998, reducing the number of suburban stations shared by SEPTA and Keystone Service trains to four.[36]

Beginning in 2000, Amtrak and PennDOT spent $166 million to rehabilitate the Philadelphia to Harrisburg Main Line. This included the restoration of fully electrified service, as well as track improvements for a top speed of 110 miles per hour (180 km/h). When the project was completed and electric service began in October 2006, travel times between Harrisburg and Philadelphia were reduced from 120 minutes to 95 minutes, with further time savings for through trains by eliminating the need for an engine change at Philadelphia. Service was also increased from 11 to 14 daily round trips. By FY 2010, ridership was up 91% since FY 2000 and 58% since FY 2006.[37]

Later improvements aimed to develop a sealed corridor without public at-grade crossings, which would allow future speed increases to 125 miles per hour (201 km/h) west of Philadelphia.[38] The last two such at-grade crossings on the line, located just east of Mount Joy, were closed on September 24, 2014. They were replaced with a bridge connecting to a nearby street.[39] Private crossings continue to be used on the line, however.[40]

On March 18, 2020 Amtrak temporarily suspended all Keystone Service trains due to declining demand because of the ongoing COVID-19 pandemic.[41][42] Service between Philadelphia and Harrisburg resumed on June 1, 2020, with all-reserved seating.[43] On January 4, 2021, Amtrak reduced service levels along the Keystone Service due to decreased ridership caused by the COVID-19 pandemic. With the reduction in service, the Keystone Service will offer seven roundtrips on weekdays and six roundtrips on weekends between Harrisburg and Philadelphia, with three daily roundtrips running the full route between Harrisburg and New York City.[44]

Operation

Consist

Former Metroliner cab car at Lancaster, Pennsylvania in 2017

A typical Keystone consist usually contains an ACS-64 electric locomotive and five passenger cars, consisting of four Amfleet coaches and a rebuilt Metroliner cab car. As a result of the signal, track, and catenary upgrades that were completed in October 2006, Keystone trains run in a push–pull mode, one of the few Amtrak services to do so. Before the 2006 upgrades, diesel power (typically a GE Genesis locomotive) was needed between Harrisburg and Philadelphia.

The trains consist of unreserved coaches between Harrisburg and Philadelphia and reserved coaches between Philadelphia and New York. There is no business class or snack/food service. However, there is a quiet car on all trains, and free Wi-Fi service is offered. Amenities vary by train.[2]

The current consists will be replaced concurrent with the replacement of the Amfleet 1 cars.[45] The replacements could simply replace the cars and remain as a locomotive style or replace the entire consist for electric multiple unit or bi-mode multiple units.

Service

On weekdays there are thirteen Keystone trains and one Pennsylvanian train in each direction. All trains run between Harrisburg and Philadelphia, with nine Keystone trains plus the Pennsylvanian continuing on to New York. There are eight round-trip trains on both Saturdays and Sundays. All but one, including the Pennsylvanian, make the full trip between Harrisburg and New York. On the majority of the trains, the journey between Harrisburg and New York takes approximately 3 hours and 30 minutes, including 1 hour and 45 minutes to travel between Harrisburg and Philadelphia. There are also several express trains which cut both journey times by approximately 15 minutes each.[2]

Amtrak Keystone Service (interactive map)

Route

The Keystone Service operates over Amtrak-owned trackage:

The route's western terminus, Harrisburg Transportation Center, is the 22nd busiest Amtrak station in the country. Lancaster station, the route's midpoint, is the 21st busiest. Due largely to the significant number of passengers traveling to and from Philadelphia, these stations are among the busiest in the country serving metropolitan areas with fewer than two million people.

References

  1. "Amtrak FY16 Ridership and Revenue Fact Sheet" (PDF). Amtrak. April 17, 2017. Retrieved January 25, 2018.
  2. "Keystone Service Timetable" (PDF). Amtrak. January 8, 2018. Retrieved January 25, 2018.
  3. "AMTRAK SETS RIDERSHIP RECORD AND MOVES THE NATION'S ECONOMY FORWARD" (PDF) (Press release). Amtrak. 14 October 2013. Archived from the original (PDF) on 4 October 2014. Retrieved 28 September 2014.
  4. Dawson, John A. "Rail Ridership, Service, and Markets in the Keystone Corridor" (PDF). Transportation Research Record. 19: 12–19.
  5. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1966" (PDF). Pennsylvania Railroad Technical & Historical Society.
  6. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1968" (PDF). Pennsylvania Railroad Technical & Historical Society.
  7. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1970" (PDF). Pennsylvania Railroad Technical & Historical Society.
  8. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1971" (PDF). Pennsylvania Railroad Technical & Historical Society.
  9. National Schedules of Intercity Passenger Service. National Railroad Passenger Corporation. May 1, 1971. p. 13 via Museum of Railway Timetables.
  10. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1972" (PDF). Pennsylvania Railroad Technical & Historical Society.
  11. Nationwide Schedules of Intercity Passenger Service. National Railroad Passenger Corporation. October 29, 1972. p. 43 via Museum of Railway Timetables.
  12. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1974" (PDF). Pennsylvania Railroad Technical & Historical Society.
  13. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1975" (PDF). Pennsylvania Railroad Technical & Historical Society.
  14. All-America Schedules. Amtrak. November 30, 1975. p. 30 via Museum of Railway Tmetables.
  15. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1978" (PDF). Pennsylvania Railroad Technical & Historical Society.
  16. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1979" (PDF). Pennsylvania Railroad Technical & Historical Society.
  17. Baer, Christopher T. (April 2015). "A GENERAL CHRONOLOGY OF THE PENNSYLVANIA RAILROAD COMPANY ITS PREDECESSORS AND SUCCESSORS AND ITS HISTORICAL CONTEXT: 1980–1989" (PDF). Pennsylvania Railroad Technical & Historical Society.
  18. Solomon, Brian (2004). Amtrak. Saint Paul, Minnesota: MBI. p. 151. ISBN 978-0-7603-1765-5.
  19. Amtrak National Train Timetables. Amtrak. October 25, 1981. pp. 22–23 via Museum of Railway Timetables.
  20. National Train Timetables. Amtrak. April 24, 1983. p. 22 via Museum of Railway Timetables.
  21. All-America Schedules. Amtrak. April 29, 1973. p. 28 via Museum of Railway Timetables.
  22. "PHILADELPHIA – HARRISBURG RAIL STUDY: Executive Summary" (PDF). Delaware Valley Regional Planning Commission. January 1992.
  23. National Train Timetables. Amtrak. April 27, 1986. pp. 25–26 via Museum of Railway Timetables.
  24. "Collision of Amtrak Train 66, The Night Owl with On-track Maintenance- of-way Equipment" (PDF). National Transportation Safety Board. January 6, 1989.
  25. Amtrak National Train Timetables. Amtrak. May 15, 1988. p. 65 via Museum of Railway Timetables.
  26. Amtrak National Train Timetables. Amtrak. April 1, 1990. p. 69 via Museum of Railway Timetables.
  27. Sanders, Craig (2006). Amtrak in the Heartland. Bloomington, Indiana: Indiana University Press. ISBN 978-0-253-34705-3.
  28. All-America Schedules. Amtrak. October 28, 1973. p. 27 via Museum of Railway Timetables.
  29. National Train Timetables. Amtrak. February 2, 1980. p. 25 via Museum of Railway Timetables.
  30. National Train Timetables. Amtrak. April 27, 1980. p. 24 via Museum of Railway Timetables.
  31. National Train Timetables. Amtrak. October 31, 1982. p. 22 via Museum of Railway Timetables.
  32. National Train Timetables. Amtrak. October 30, 1983. p. 34 via Museum of Railway Timetables.
  33. Waltzer, Jim (October 6, 2005). "Waltz Through Time: An Express Derailed". Atlantic City Weekly. Archived from the original on July 7, 2011.
  34. "Transit Accessibility in the Delaware Valley Region" (PDF). Delaware Valley Regional Planning Commission. June 1998. p. 11.
  35. "On the Railroad Lines…" (PDF). The Delaware Valley Rail Passenger. Delaware Valley Association of Railroad Passengers. 14 (12): 5. December 1996.
  36. "Schedule Changes" (PDF). The Delaware Valley Rail Passenger. Delaware Valley Association of Railroad Passengers. 16 (4): 10. April 1998.
  37. "Amtrak's Northeast Corridor: Facts and Background Information" (PDF). Amtrak. May 2011.
  38. "Keystone Corridor East High Speed Phase II". planthekeystone.com. Archived from the original on 21 October 2013. Retrieved 20 July 2013.
  39. Hainthaler, Joe (23 September 2014). "Two roads carrying traffic south from Route 230 in Mount Joy to close Wednesday". Lancaster Online. Retrieved 28 September 2014.
  40. "Amtrak train collides with farm tractor near Mount Joy". WHTM-TV. June 5, 2018. Retrieved July 31, 2018.
  41. Hertzler, Richard (March 17, 2020). "Amtrak to suspend train service in Lancaster County Wednesday as riders avoid transportation hubs amid COVID-19 fears". Lancaster Online. Retrieved March 18, 2020.
  42. "Service Adjustments Due to Coronavirus" (Press release). Amtrak. March 24, 2020. Archived from the original on March 25, 2020. Retrieved March 25, 2020.
  43. "Amtrak announces re-opening of some Pa. service, with new safety guidelines". PennLive. May 21, 2020. Retrieved May 22, 2020.
  44. Derry, Will (January 4, 2021). "Amtrak modifies Keystone Service schedule; several trips from Harrisburg to New York suspended". Lancaster Online. Retrieved January 14, 2021.
  45. "Amtrak Seeks New Passenger Equipment For Northeast Regional And State Corridor Service". 18 January 2020. Retrieved 28 October 2020.

KML is from Wikidata

Media related to Keystone Service at Wikimedia Commons

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.