LRT Line 3 (Greater Jakarta LRT)

The Greater Jakarta LRT Line-3 (Indonesian: Lintas pelayanan 3 LRT Jabodebek) or Cawang–Jatimulya LRT is one of the three light rail line of the Greater Jakarta LRT which serves trips from Cawang station to Jatimulya station. The distance traveled in this line is around 18.49 km. Currently still under construction.

Overview
Other name(s)Cawang–Jatimulya LRT
Native nameLintas pelayanan 3 LRT Jabodebek
StatusUnder construction
OwnerDJKA
LocaleJakarta, West Java
TerminiCawang
Jatimulya
Stations7
Service
TypeLight rail transit
SystemGreater Jakarta LRT
Services1
Operator(s)Kereta Api Indonesia
Depot(s)Jatimulya
History
Planned opening2022 [1]
Completed2022 [1]
Technical
Line length18.49 km (11.49 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V DC Third rail system
Route map

Dukuh Atas
Setiabudi
Rasuna Said
Kuningan
Pancoran
Cikoko
Cawang
Ciliwung
Cawang
to Harjamukti
Halim
Jatibening Baru
Cikunir I
Cikunir II
Bekasi Barat
Jatimulya
Jatimulya Depot

The Greater Jakarta LRT Line-1 adopts the construction of an elevated line and runs along the Jakarta–Cikampek Toll Road and also side by side with Jakarta–Cikampek Elevated Toll Road. This line is built on the north side of the Jakarta–Cikampek toll road.

Stations

Station Transfer/Notes Location
Cawang  L2  Terminal station.

Planned interchange station to  L2 

Transjakarta (planned at K7-10 Cawang BNN)

East Jakarta Jakarta
Halim High-speed intercity train (planned at Halim)
Jatibening Baru Bekasi West Java
Cikunir I
Cikunir II
Bekasi Barat
Jatimulya Terminus station. Bekasi Regency

References

  1. "Proyek LRT Jabodebek Molor ke 2022" (in Indonesian). 5 June 2020. Retrieved 27 June 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.