Line 15 (Beijing Subway)

Line 15 of the Beijing Subway (simplified Chinese: 北京地铁15号线; traditional Chinese: 北京地鐵15號線; pinyin: běijīng dìtiě shíwǔhào xiàn) is a rapid transit rail line in northern Beijing.

Line 15
Line 15 train approaching Houshayu station
Overview
Other name(s)M15 (planned name)
StatusOperational
LocaleHaidian, Chaoyang, and Shunyi districts
Beijing
TerminiQinghua Donglu Xikou
Fengbo
Stations20
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing Mass Transit Railway Operation Corp., Ltd
Rolling stock6-car Type B (DKZ31)
Daily ridership149,400 (2014 Avg.)
432,200 (2016 Peak)[1]
History
OpenedDecember 30, 2010 (2010-12-30)
Technical
Line length41.4 km
CharacterUnderground/Elevated
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V DC Third rail
Route map

planned phase two
Line 13 (under planning)
Qinghua Donglu Xikou
Liudao Kou
Changping line (to be opened 2021)
JimenqiaoChangping Xishankou
Beishatan
Olympic Park
water body of Olympic Green
Anli Lu
Datunlu Dong (E)
Guanzhuang
Line 17 (to be opened 2022)
Yizhuang Zhanqianqu SouthFuture Science Park North
Skyway crossing S11
Wangjing Xi (W)
Wangjing
Wangjing Dong (E)
Beixiao river
Shuangsha railway
Cuigezhuang
Maquanying depot
connects depot
Maquanying
connects depot
Sunhe
Wenyu river
China Int'l Exhibition Center
Hualikan
Houshayu
Nanfaxin
Shimen
Shunyi
Fengbo
Fengbo yard

The line has a total length of 41.4 kilometres (25.7 mi) across northern Beijing from Qinghuadongluxikou in Haidian District in the west, to Fengbo in Shunyi District in the east.[2] The line uses Sparcs CBTC system supplied by Nippon Signal.[3] It cost ¥17.6 billion. The line features 6-car trains similar to other lines in the Beijing Subway.[4] Tunnels of Line 15 are up to 38 metres (125 ft) underground, making them the deepest in Beijing's subway system.[4] Trains run every 2–3 minutes during the rush hour with some trains performing express services.[5] A journey on a local all stop train from Fengbo to Qinghuadongluxikou station takes about 60 minutes.[6]

Route

The line is 41.4 km long (25.7 mi) with 20 stations, with 4 transfer stations at Wangjing (Line 14), Wangjing West (Line 13), Datunlu East (Line 5) and Olympic Green (Line 8). The line run from Qinghuadongluxikou in Haidian District to Fengbo in Shunyi District. Line 15 travels underground from Qinghuadongluxikou to Maquanying, and then goes above ground on an elevated track to Houshayu before returning underground and going underneath the Chaobai River to Fengbo. The elevated section is high enough to allow elevated roads to pass underneath. A major public venue on the Line 15 is the New China International Exhibition Center (New CIEC) at the China International Exhibition Center station. New CIEC holds the annual Beijing International Automotive Exhibition, which attracted 800,000 visitors in 2012.[7]

List of Stations

Service Route

[5][8]

Station Name Connections Nearby Bus Stops Distance
km[9]
Location
L R G English Chinese
Qinghua Donglu Xikou 清华东路西口 355 392 438 450 466 549 专12 0.000 0.000 Haidian
Liudao Kou 六道口 26 145 355 398 438 450 478 490 577 603 606 632 693 夜4 夜14 专12 1.144 1.144
Beishatan 北沙滩 16 26 135 143 145 307 319 345 425 450 478 484 518 577 607 609 618 625 695 夜14 夜38 1.337 2.481
Olympic Park 奥林匹克公园  8  311 319 379 450 484 695 专40 1.999 4.480 Chaoyang
Anli Lu 安立路 108 124 141 301 311 319 379 415 419 425 450 466 484 518 538 653 695 905 BRT3(快速公交3) BRT3区(快速公交3区) 专40 1.368 5.848
Datunlu Dong (E) 大屯路东  5  311 319 415 425 430 464 484 538 569 596 620 695 夜26 专40 0.938 6.786
Guanzhuang 关庄 386 569 1.087 7.873
Wangjing Xi (W) 望京西  13  450 471 538 547 571 851 854 866 905 928 970快 985 987 专112 2.071 9.944
Wangjing 望京  14  130 404 416 421 451 471 593 604 621 851 855 991 夜32 专15 1.758 11.702
Wangjing Dong (E) 望京东 445 专15 专112 1.652 13.354
Cuigezhuang 崔各庄 415 944 991 专116 专122 专140 2.295 15.649
Maquanying 马泉营 944 988 991 专14 2.008 17.657
Sunhe 孙河 405 415 538 586 696 847 850 854 857 867 915 916 942 980 991 3.309 20.966
China Int'l Exhibition Center 国展 696 850 915 916 933 942 955 980 3.386 24.352 Shunyi
Hualikan 花梨坎 915 916 933 955 980 1.615 25.967
Houshayu 后沙峪 855 915 916 955 980 3.354 29.321
Nanfaxin 南法信 顺4 顺27 顺38 4.576 33.897
Shimen 石门  Tongmi  (Shunyi railway station) 915 915快 2.712 36.609
Shunyi 顺义 850 850快 856 915 915快 945 1.331 37.940
Fengbo 俸伯 856 915 915快 918 924 945 970 2.441 40.381

History

During planning of Line 15, the eastern terminus was moved from Fuqian Jie [10][11] to the east bank of the Chaobai River.[2] Construction began on Phase I of Line 15 in Shunyi District on April 11, 2009.[2][12] At that time, Phase I of Line 15 was only 31.15 km (19.36 mi) long with 12 stations.[2] According to the construction schedule in 2009, the easternmost Shunyi section of Phase I (18.5 km or 11.5 mi in length with seven stations) would be opened first on December 30, 2011.[13][14] The remainder of Phase I would follow in May 2013.[2]

The route of Line 15's Phase II has been revised several times over the years. In April 2009, Phase II plans showed the western half of Line 15 running from Xiyuan Station in Haidian District, through the campus of Tsinghua University, Zhongguancun, and the Olympic Green, and joining Phase I at Wangjing West.[2][10] When track-laying began in Phase I on October 28, 2009, the schedule and alignment of Phase II underwent a major revision, with one proposal extending Line 15 westward as originally planned with additional stations[15] and another proposal sending Line 15 southward and parallel to Line 8 to provide relief for congested Line 4 and 5.[16][17] Ultimately the route west to Qinghuadongluxikou was selected and the design of Xiyuan station leaves enough space to build another platform in between Line 4 and Line 16 platform for potential Line 15 extension westward beyond Qinghuadongluxikou.[18] Additionally the construction schedule was revised with Phase I expanded from 31 km (19 mi) and 12 stations to 38 km (24 mi) and 18 stations. Phase II plans also underwent a revision; instead of two sections, Phase II would be built and opened in three sections.

The first section of Phase I, from Wangjing West to Houshayu, opened on December 30, 2010. The second, from Houshayu to Fengbo, followed at the end of 2011. The third section, from Qinghuadongluxikou to Wangjing West, opened on December 28, 2014.[6]

Line 15, Phase I stations, from east to west with transfers in parentheses:

Section 1, opened Dec. 30, 2010Section 2, opened Dec 31st, 2011Section 3, opened Dec 28, 2014[19][20]
  • Houshayu 后沙峪
  • Hualikan 花梨坎
  • China International
    Exhibition Center 国展
  • Sunhe 孙河
  • Maquanying 马泉营
  • Cuigezhuang 崔各庄
  • Wangjing East 望京东*
  • Wangjing 望京 (Line 14)
  • Wangjing West 望京西 (Line 13)
  • Fengbo 俸伯
  • Shunyi 顺义
  • Shimen 石门
  • Nanfaxin 南法信
  • Guanzhuang 关庄
  • Datunlu East 大屯路东** (Line 5)
  • Anlilu 安立路
  • Olympic Green 奥林匹克公园 (Line 8)
  • Beishatan 北沙滩
  • Liudaokou 六道口
  • Qinghuadongluxikou 清华东路西口

 * Wangjing East station did not open in 2010 due to lack of connections with the surrounding road system. It was opened on 31 December 2016.

** Datunlu East station did not open in 2014 because the transfer corridors to Line 5 were still under construction. It was opened on 26 December 2015.

SegmentCommencementLengthStation(s)Name
Wangjing West — Houshayu 30 December 2010 17.725 km (11.01 mi) 8 Phase 1 (1st section)
Houshayu — Fengbo 31 December 2011 11.060 km (6.87 mi) 4 Phase 1 (2nd section)
Qinghuadongluxikou — Wangjing West 28 December 2014 9.944 km (6.18 mi) 6 Phase 1 (3rd section)
Datunlu East 26 December 2015 Infill station 1
Wangjing East 31 December 2016 Infill station 1

Rolling Stock

ModelImageManufacturerYear BuiltAmount in ServiceFleet NumbersDepot
DKZ31 CRRC Changchun Railway Vehicles 2010 28 15 001–15 028 Maquanying
Fengbo

References

  1. 北京地铁全网客流再创历史纪录 逼近1270万 (in Chinese). 中国新闻社. May 1, 2016. Retrieved 2016-05-01.
  2. 地铁15号线顺义段开工 望京西至后沙峪明年底开通 (in Chinese). Beijing Times. 2009-04-12. Archived from the original on 2016-01-25. Retrieved 2009-04-19.
  3. http://www.railjournal.com/index.php/blogs/david-briginshaw/can-cbtc-cope-with-complex-rail-networks.html
  4. 北京地铁15号线最快段明年底开通(图) (in Chinese). 法制晚报. 2009-10-28.
  5. www.bjnews.com.cn. "北京地铁10条线路跑进2分间隔 疫情后部分措施将保留". www.bjnews.com.cn. Retrieved 2020-04-24.
  6. 地铁15号线一期12月28日全线贯通(图). beijing.cn (in Chinese). 2014-12-05. Archived from the original on 2014-12-28. Retrieved 2014-12-29.
  7. China Auto Show website: http://www.china-autoshow.com Archived 2007-03-21 at the Wayback Machine
  8. "15号线 | 北京地铁官方网站". www.bjsubway.com. Retrieved 2020-04-24.
  9. "站间公里数 北京地铁官方网站".
  10. 15号线将连通中关村和奥运村 (in Chinese). Beijing Youth Daily. 1 October 2008. Archived from the original on 2008-10-02. Retrieved 2008-11-01.
  11. 北京地铁15号线将连接颐和园和顺义城区. The Beijing News (in Chinese). 8 November 2008.
  12. 视频:北京地铁15号线顺义段今日率先开工建设 (in Chinese). BTV. 11 April 2009.
  13. Kun, Guo (12 April 2009). 北京地铁15号线顺义段开工 2013年顺义到城区仅半小时. Jinghua Daily (in Chinese).
  14. Yan, Zheng (1 July 2009). "Archived copy" 15号线顺义段2011年12月开通. 163.com news (in Chinese). Archived from the original on 24 October 2018. Retrieved 30 June 2009.CS1 maint: archived copy as title (link)
  15. 北京地铁15号线一期增加2站年底通车. The Beijing News (in Chinese). Sina News. 2011-05-14. Retrieved 2011-08-09.
  16. 15号线明年底部分开通. 163.com news (in Chinese). 29 October 2009.
  17. 北京地铁15号线二期可能改道. Sina real estate (in Chinese). 2010-01-26. Archived from the original on 2014-12-09.
  18. 关于地铁16号线车站设计方案展示中观众留言的回复 (in Chinese). Archived from the original on 2015-01-05. Retrieved 2014-12-30.
  19. 地铁15号线确定"新7站" 有望2014年底通车. Bjhd.gov.cn. 1 February 2012. Archived from the original on 2013-01-16. Retrieved 2013-07-12.
  20. http://c.hiphotos.baidu.com/baike/pic/item/18d8bc3eb13533fa90353b6ea8d3fd1f40345bea.jpg
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.