Line 17 (Beijing Subway)

Line 17 of the Beijing Subway (Chinese: 北京地铁17号线; pinyin: běijīng dìtiě shíqī hàoxiàn) is a rapid transit line under construction in Beijing.[4][5] The line is fully underground with a total length of 49.7 km (30.9 mi).[6] The line is scheduled to open in parts in 2021 and 2022. It will be operated by Beijing MTR Corporation Limited.[1]

Line 17
 17 
Project headquarters of Line 17 Dongdaqiao station
Overview
Other name(s)M17 / R2 (planned name)
StatusUnder construction
TerminiFuture Science Park North
Yizhuang Zhanqianqu South
Stations21
Service
TypeRapid transit
SystemBeijing Subway
Operator(s)Beijing MTR Corporation Limited[1]
Rolling stock8-car Type A
History
Opened2022[2] (Planned)
Technical
Line length49.7 km (30.9 mi)
Characterunderground[3]
Track gauge1,435 mm (4 ft 8 12 in)
Operating speed100 km/h (62 mph)
Route map

Future Science Park North
Wenyu river
Future Science Park South
Xiejiacun depot
Tiantongyuan East
Qing river
Qingheying
Line 13 crossing
Shuangsha railway crossing
Yongshiying
Beixiao river
line 13 Xizhi Men
Wangjing Xi (W)
line 13 Dongzhi Men
Taiyanggong
outer - inner
Ba river
Xibahe
Sijiqing - Guanzhuangluxikou
connects line 12
Xiangheyuan
Liangma river
Workers' Stadium
Dongsi Shitiao - Caogezhuang North
connects line 3
Dongdaqiao
Guangqudonglu
Yong'an Li
Tonghui river
Guangqumen Wai
Beijing West railway station - Universal Beijing Resort
Panjiayuan West
Shilihe
inner - outer
Chaoyanggang
Fengshuang railway
Beishenshu
Tonghui irrigate canal
Ciqu North
Ciqu
Ciqu South yard
Yizhuang Zhanqianqu South

Description

Line 17 is planned to run from the Future Science Park North station in Changping District to Yizhuang Zhanqianqu South station in Tongzhou District.[7][8] The line is fully underground with a total length of 49.7 km (30.9 mi).[9][8] The expected end to end travel time to be approximately 56 minutes.[10] When complete, the line will provide relief to the congestion on Line 5, Line 10 and Line 13.[10]

Rolling stock

Line 17 will use 8-car Type A rolling stock.[5]

Stations

Station Name Connections Distance
km
English Chinese
Future Science Park North 未来科学城北区
Future Science Park South 未来科学城南区
Tiantongyuan East 天通苑东
Qingheying 清河营
Yongshiying 勇士营
Wangjing Xi (W) 望京西  13   15 
Taiyanggong 太阳宫  10 
Xibahe 西坝河  12 
Xiangheyuan 香河园
Workers' Stadium 工人体育场  3 
Dongdaqiao 东大桥  6   28 
Yong'an Li 永安里  1 
Guangqumen Wai 广渠门外  7 
Panjiayuan West 潘家园西
Shilihe 十里河  10   14 
Shibalidian[lower-alpha 1] 十八里店
Chaoyanggang 朝阳港
Beishenshu 北神树
Ciqu North 次渠北
Ciqu 次渠  Yizhuang 
Yizhuang Zhanqianqu South 亦庄站前区南
  1. The station is not included in the original plan. It was added in the plan in 2018.[11]

History

In January 2011, an official with the city's planning committee indicated that Line 17 of the subway was planned to run east–west through the city's Central Business District under Guanghua Road with transfers to Lines 4 and 5.[12] However, the line run through Central Business District is known as Line 28 now.

In February 2012, the city's planning committee identified a different Line 17, as a line planned for 2020, that would run north–south from Tiantongyuan to Yizhuang that would run parallel and to the east of Line 5. On June 15, 2012, the city government disclosed tentatively planned stations for the line.[13][7][14][8]

On October 10, 2013, city authorities confirmed that Line 17 would run from the Future Science Park North station in Changping District to Yizhuang Zhanqianqu South station in Tongzhou District.[8] Construction was expected to begin in 2014 and Line 17 would have a total length of 49.7 km (30.9 mi).[8]

Construction of the line began in 2015.[15][16]