Albuquerque Rapid Transit

Albuquerque Rapid Transit, also known as ART, is a bus rapid transit (BRT) system serving the Central Avenue corridor in Albuquerque, New Mexico, United States. There are two lines running between Tramway Boulevard (NM 556), the Central and Unser Transit Center (CUTC), and the Uptown Transit Center (UTC).[2][3] It was built in 2016–17 and began limited operation in November, 2017,[4] but was subsequently delayed for over two years due to problems with the stations and buses. After the original fleet of electric buses was replaced with diesel buses, the line began regular service on November 30, 2019.[5]

Albuquerque Rapid Transit
Overview
SystemABQ RIDE
OperatorABQ RIDE
Began serviceNovember 30, 2019
Route
LocaleAlbuquerque, New Mexico
StartCentral and Unser Transit Center
EndRoute 777 - Tramway Boulevard (NM 556)
Route 766 - Uptown Transit Center
Stations19
Service
Ridership15,750 (projected) [1]
 {{{previous_line}}}  {{{system_nav}}}  {{{next_line}}} 

History

Background

In 2004, the City of Albuquerque began operations of its first Rapid Ride bus line, as a precursor to a light rail system along Central Avenue. The plans for light rail were disbanded, and the Rapid Ride became a permanent system, expanding to three different lines in 2006 and 2009. Studies to build a rapid transit system using either buses or streetcars also took place in 2006, but no action was taken.[6] Although the Rapid Ride is a limited stop express bus service, it lacks several key features of BRT, such as dedicated travel lanes and off-bus fare payment. The first line opened, and ran from Unser to Wyoming, then going to the Uptown Transit Center. A second Rapid Ride opened in 2006 to the northwest side, and the Rapid Rides were given color designations, the 766 Red Line and the 790 Blue Line. In 2009, the third Rapid Ride, the 777 Green Line, started service from Downtown to Tramway Boulevard. The Red and Green Line Rapid Rides were designed to supplement the heavily traveled 66 bus which travels from Tramway Boulevard to Unser Boulevard, as well as transport passengers to popular destinations.

In 2011, during the administration of Mayor Richard J. Berry, the City of Albuquerque began a feasibility study of creating a true BRT system along Central Avenue.[6] The plan called for the elimination of the current Rapid Ride routes and the placement of a new system utilizing new buses, dedicated travel lanes, transit signal priority, and off-board fare collection. Central Avenue, also known as Historic US Route 66, is not only a popular tourist destination, but a major surface artery through Albuquerque. This street made the plans for starting a transit oriented development scheme a good starting point.

In February 2014, the city filed for federal funding to construct the proposed BRT system,[7][8] and the federal government approved the filing in March.[9] Later that month, the City presented a demonstration bus to the public to generate interest in the project.[10] In October, The City presented its final draft and alternative analysis to the public in a series of meetings.[11] The current design calls for both mixed-use lanes and dedicated Bus lanes, depending on the location. Except for a few stations near downtown, stations will board in the median, and the buses will have doors on both sides to accommodate the platforms. East of Louisiana Boulevard and west of Coors Boulevard, ART will share travel lanes and use existing Rapid Ride stops. The path will follow the existing 66 bus route to Unser Boulevard.[12][13][14]

The proposed route changed somewhat during the planning phase. Early materials depicted ART making a stop at the Unser Transit Center (CUTC) before continuing to 98th St., but the CUTC serves as the western terminus of the system as built. ART was expected to cost $119 million, with federal funds covering $100.6 million (about 84%) of the project.[15] As of March 2016, the city has also promised to consider a 20th stop within the International District, but have not yet announced where that stop will be put or how it will be paid for.[16] In April 2017, it was decided that the 20th stop in the International District will be located at San Pedro and Central, with funding provided by the city councilor of that district.[17]

There are plans to create other BRT systems throughout the Albuquerque metro, by various organizations such as ABQ RIDE and the Mid-Region Council of Governments (MRCOG). Studies being conducted include an intersecting BRT system on University Boulevard from Menaul Boulevard to the airport,[18][19] and another BRT system on Paseo Del Norte.[20][21]

ART received a recommendation for $69 million in federal funding as part of the proposed FY 17 budget and anticipates the start of construction in May 2016 pending FTA approval to spend local funds.[22]

Construction

Opponents of the ART project filed suit in April 2016 to stop construction from going forward, but both the U.S. District Court and Tenth Circuit Court of Appeals refused to grant a temporary injunction against the project, allowing the city to proceed while the case was pending.[23][24][25] In September 2016, local contractor Bradbury Stamm was awarded an $82.6 million contract to build the ART system. Construction was scheduled to last 16 months, with a completion date near the end of 2017.[26] Work began in October 2016, starting with the removal of medians and landscaping to make room for the new bus lanes.[27] In December, the Court of Appeals ruled in favor of the city, finding no legal grounds to stop the project.[28] The suit against the city was subsequently dropped, ending a nearly year-long legal battle.[29]

During construction, businesses near the ART route complained that the project was impacting their business, and some were forced to close or cut back on staff.[30][31] In April 2017, the city announced a short-term loan program aimed at helping small businesses survive the construction.[32]

Initial launch and problems

One of the rejected BYD electric buses

ART went into limited service on November 25, 2017, providing free trips to and from the Albuquerque BioPark for the River of Lights event.[4][33] However, full service was delayed, and incoming Mayor Tim Keller began to allude to problems with the system after he took office in December. On January 9, 2018, he held a press conference where he called ART "a bit of a lemon" and said he was not sure when it would be operational. According to Keller, the problems included inconsistent platform heights, ADA violations, and at least one intersection whose geometry was unable to accommodate a 60-foot bus safely. He also described issues with the electric buses and charging equipment supplied by BYD Auto, including faulty batteries and leaking axles on the buses and inoperable chargers. The River of Lights service was suspended after Keller's administration learned that a stopgap solution of charging the buses using portable generators could potentially void the warranty.[34][35] Both BYD and Bradbury Stamm said they would work to fix the issues at no additional cost to the city.[36][37]

In January, 2018, crews began work to resolve some of the issues with the ART stations.[38] BYD struggled to fill the bus order and had only delivered 15 of the 20 buses by November. An investigation by the city Office of Inspector General identified various issues with the buses, and reported that city inspectors sent to BYD to check the buses were not properly trained. It was further reported that the first ART bus had been cobbled together from "parts and pieces" intended for a different agency, Antelope Valley Transit Authority, in response to pressure from city officials to deliver the bus before the end of Berry's term.[39] The city decided to reject the buses and filed suit against the company in December, alleging that "BYD had failed to meet the scheduled deadline for providing the 60-foot articulated buses and that the vehicles it ultimately delivered were unsafe, had defects such as cracked frames and improperly installed wiring, and did not meet the represented miles-per-charge standard."[40] BYD counter-sued and ultimately the two sides settled with no additional money changing hands. Twenty diesel buses were purchased from New Flyer as a replacement for the BYD order.[41] The vandalism of dormant stations and the perception of increased traffic on the remaining traffic lanes has led some to criticize the project. Some businesses along the route also reported a temporary decrease in sales. [42] After the system's relaunch, the vandalism problem was subsequently resolved and foot traffic to establishments reportedly increased.

Regular service

On November 8, 2019, Mayor Keller announced that ART service would begin on November 30, 2019 to coincide with "Small Business Saturday." Buses were unveiled displaying bus-wraps featuring local landmarks and artwork. The Mayor stated that the previously identified issues to the system have been remedied and went on to announce that rides on the ART System would be free through December 31, 2019 to encourage the public to try the new system. [43]

By February of 2020, ART saw large ridership increases over the Rapid Ride routes that it replaced over the previous year's numbers. The first month of ART service which was offered for free to the public saw ridership more than double over the same period in 2019, while the first month of paid service saw ridership increase by more than 30% over the same period in 2019.[44]

Design

The Highland ART station in 2018, prior to the system being operational

Buses used on the ART line bear similarities in design and operation to light rail trains. ART buses have doors on both sides to accommodate different platform locations. The route includes several variations on bus priority lanes, including dedicated lanes, bi-directional lanes, and reversible lanes.

ART stations often feature passenger amenities such as shelters, benches, lighting, new landscaping, and potentially, local art work.[21] On a standard bus route, passengers have to climb steps or a wheelchair ramp must be folded out. ART stations are similar to train platforms in that when a bus arrives, the floor of bus is the same height as the station platform. This reduces wait time for passengers and makes the buses more handicap accessible.

Some platforms, however, were found to have inconsistent platform heights as well as gaps between platform and buses, potentially creating significant accessibility issues. Also, the stations' clearance is incompatible with the current design of the buses supplied by Build Your Dreams, as evidenced by bus mirrors hitting the station structure.[35]

Accolades

Shortly after construction began, the Institute for Transportation and Development Policy (ITDP), which, under its BRT Standard, ranks BRT corridors based on design, efficiency, and operation, awarded the ART corridor a Gold ranking for design, scoring 88.5 out of 100 possible points for its copious use of BRT technology, such as dedicated bus guideways, off-board fare collection, bus-level boarding platforms, frequency of service, and the use of an all-electric bus fleet. ART is the first BRT system in the United States to receive a Gold rating from the ITDP. Because the gold designation was awarded strictly for design, the corridor is scheduled to be reassessed approximately six months after ART becomes operational.[45][46][47]

In December 2017, the National Association of Industrial and Office Properties (NAIOP) jointly awarded their annual "Chairman's Award" to the ART project and to former mayor Richard J. Berry, stating in the award announcement, "Berry’s strong advocacy of the project was also seen as pivotal to its implementation".[48]

Incidents

On November 25, 2017, the opening day for limited service on the route, a passenger vehicle attempted to make an illegal U-turn across the guideway to escape a long traffic queue due to the annual River of Lights festival, and was struck by an ART vehicle traveling westbound in the guideway. There were no injuries reported, and the driver of the passenger vehicle admitted fault at the scene.[49]

To help reduce the number of incidents and discourage mixed-traffic from entering the bus lanes, pinned-curbs were added throughout most of the corridor.[50] In addition, the bi-directional bus lane that runs on Central Avenue near UNM was painted red to help avoid confusion from both motorists and pedestrians attempting to cross Central. As buses come from both directions on this stretch of the lane, it is hoped that the red coloring will help alert drivers and pedestrians to ART vehicles in the lane.[51]

References

  1. McKay, Dan (March 21, 2016). "Rapid transit debate heads to City Council on Monday night". Albuquerque Journal. Retrieved March 21, 2016.
  2. "Bus Rapid Transit plan moves forward". KRQE News 13. Retrieved October 11, 2014.
  3. "Map-Albuquerque Rapid Transit".
  4. Jaceks, Emily (November 25, 2017). "After 13 months, ART opens its doors to riders". KOB4. Retrieved November 26, 2017.
  5. Reisen, Matthew; Martinez, Pilar (December 1, 2019). "ART up and running". Albuquerque Journal. Retrieved December 1, 2019.
  6. "CITY OF ALBUQUERQUE CENTRAL AVENUE CORRIDOR BRT FEASIBILITY ASSESSMENT : Final Report" (PDF). Cabq.gov. Retrieved October 11, 2014.
  7. "City seeks federal funds to advance bus rapid transit". Albuquerque Business First. February 26, 2014. Retrieved October 11, 2014.
  8. "Central Avenue Corridor BRT Project" (PDF). Federal Transit Administration. Federal Transit Administration. Archived from the original (PDF) on September 6, 2015. Retrieved February 26, 2015.
  9. "Feds give ABQ OK on bus rapid transit idea". Albuquerque Business First. March 7, 2014. Retrieved October 11, 2014.
  10. "'Train-like bus' on display in ABQ". KRQE News 13. Retrieved October 11, 2014.
  11. "Bus rapid transit initiative moves into public meeting phase - Albuquerque Business First". Albuquerque Business First. September 29, 2014. Retrieved October 11, 2014.
  12. "Map | Albuquerque Rapid Transit". www.brtabq.com. Retrieved April 20, 2017.
  13. "2040 MTP Long Range Transportation Systems" (PDF).
  14. "ABQ RIDE System Map".
  15. "ART's price tag rises $19 million". ABQ Journal. Retrieved February 22, 2016.
  16. "Councilor supports ART on conditions". ABQ Journal. Retrieved March 17, 2016.
  17. Writer, Martin Salazar | Journal Staff. "Compromise reached for wider Nob Hill sidewalks". www.abqjournal.com. Retrieved December 9, 2017.
  18. "Meetings Scheduled To Discuss Transportation in UNM/CNM Area". Abqjournal.com. Retrieved October 11, 2014.
  19. "CNM/UNM/Sunport Traffic Topic of Meeting Tonight". Abqjournal.com. Retrieved October 11, 2014.
  20. "Paseo del Norte Study - www.mrcog-nm.gov". Mrcog-nm.gov. Archived from the original on October 20, 2014. Retrieved October 11, 2014.
  21. "About Art". www.brtabq.com. ABQ Ride. Retrieved October 22, 2016.
  22. http://www.cabq.gov/transit/news/albuquerque-rapid-transit-receives-recommendation-of-federal-funding
  23. McKay, Dan (July 29, 2016). "ART can start". Albuquerque Journal. Retrieved January 24, 2018.
  24. McKay, Dan (August 29, 2016). "First phase of work on ART starts". Albuquerque Journal. Retrieved January 24, 2018.
  25. McKay, Dan (October 25, 2016). "Federal court refuses again to stop ART construction work". Albuquerque Journal. Retrieved January 24, 2018.
  26. McKay, Dan (September 7, 2016). "ART project is now on the clock to finish in 16 months". Albuquerque Journal. Retrieved January 24, 2018.
  27. McKay, Dan (October 18, 2016). "Heavy work begins on Central for ART". Albuquerque Journal. Retrieved January 24, 2018.
  28. McKay, Dan (December 13, 2016). "ART project clears major legal hurdle". Albuquerque Journal. Retrieved January 24, 2018.
  29. Boetel, Ryan (February 21, 2017). "Opponents drop lawsuit against ART project". Albuquerque Journal. Retrieved January 24, 2018.
  30. Dyer, Jessica (February 20, 2017). "Central Ave. businesses feel effects of ART work". Albuquerque Journal. Retrieved January 25, 2018.
  31. Del Aguila, Andres (April 2, 2017). "Several businesses suffering from ART". Daily Lobo. Retrieved January 25, 2018.
  32. Salazar, Martin (April 21, 2017). "ART loan program for businesses ready to go". Albuquerque Journal. Retrieved January 25, 2018.
  33. Hayden, Maddy; Reisen, Matthew (November 26, 2017). "ART's a hit at the start". Albuquerque Journal. Retrieved January 23, 2018.
  34. "Mayor Keller: New problems could delay ART bus service for another year". KRQE.com. Retrieved January 24, 2018.
  35. Salazar, Martin (January 10, 2018). "ART project 'a bit of a lemon,' mayor says as problems mount". Albuquerque Journal. Retrieved July 29, 2020.
  36. "Councilors Pursue Answers on ART". Albuquerque Journal. Retrieved January 24, 2018.
  37. "ART Bus Company Working to Correct Issues". Albuquerque Journal. Retrieved January 24, 2018.
  38. James, Caleb (January 22, 2018). "Work to correct ART issues begins this week". KOB. Retrieved January 23, 2018.
  39. "6-6-18 #OIG 18-0001-R Report of Inspection: ART Project", cabq.gov, retrieved July 23, 2019
  40. Dyer, Jessica (April 18, 2019). "Bus maker: Settlement near in ART suit". Albuquerque Journal. Retrieved July 29, 2020 via Newspapers.com.
  41. Dyer, Jessica (November 9, 2019). "After sputtering for two years, ART ready to roll". Albuquerque Journal. Retrieved July 29, 2020 via Newspapers.com.
  42. "Albuquerque's $133-million electric bus system is going nowhere fast". Los Angeles Times. Retrieved February 17, 2019.
  43. https://www.abqjournal.com/1389158/after-years-of-delay-art-is-set-to-begin-operation.html
  44. https://www.krqe.com/news/albuquerque-metro/art-buses-seeing-more-riders-than-old-rapid-ride-service/
  45. "Albuquerque, NM Opens First USA Gold Standard BRT on Historic Route 66". Transport Matters. Institute for Transportation and Development Policy. November 27, 2017. Retrieved April 26, 2020.
  46. "ART System Receives Rare Gold Standard from ITDP". globenewswire.com. November 27, 2017. Retrieved December 12, 2017.
  47. "FAQ- Getting to BRT: An Implementation Guide for U.S. Cities". Transport Matters. Institute for Transportation and Development Policy. October 4, 2019. Retrieved April 26, 2020.
  48. "Awarding excellence: ART, Berry top NAIOP awards". abqjournal.com. Retrieved December 14, 2017.
  49. "Video Shows Albuquerque Driver Cross Into Bus-Lane Causing Crash". krqe.com. Retrieved December 6, 2017.
  50. https://www.krqe.com/news/albuquerque-metro/city-installs-pin-curbs-along-art-corridor/
  51. https://www.abqjournal.com/1459262/art-to-get-new-red-paint-job-to-denote-lane.html
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.