List of bus rapid transit systems

This is a list of bus rapid transit (BRT) systems which are in operation or under construction. The term "BRT" has been applied to a wide range of bus services. In 2012, the Institute for Transportation and Development Policy (ITDP) published a BRT Standard to make it easier to standardize and compare bus services.

Marechal Floriano BRT station on Curitiba's RIT Green Line (Linha Verde)

Africa

Morocco

Nigeria

The Lagos Bus Rapid Transit System (Lagos BRT) is Africa's first. The Nigerian government is building a BRT system for the Lagos Metropolitan Area, and the project's first phase has been completed.[1] The first phase, from mile 12 through Ikorodu Road and Funsho Williams Aveğnue to CMS, was commissioned on March 17, 2008.

The Lagos Metropolitan Area Transport Authority (LAMATA) BRT corridor is about 22 kilometres long.[2] Two operators, NURTW Cooperative and the state-owned Lagos BRT, contributed about 180 high-capacity buses to the first phase. It is the world's most economical BRT, costing $1.6 million per km for the 22-km route. The first phase cost N4.5 billion (about US$35 million) and included elevated segregation barriers, road repairs on bus and service lanes, de-silting of blocked drainage channels, and bus stops.

South Africa

  • Cape Town: The city's MyCiTi system began operations in May 2010, just before the World Cup. Its first service was a shuttle from the airport to the central business district. The initial Phase 1A trunk and feeder services began operation in May 2011. The remaining Phase 1A construction was completed in 2014, and phase 1B construction was completed in 2015.[3]
  • George: The Go George BRT system began operation in August 2015.[4]
  • Johannesburg: The Rea Vaya ("We're moving") line opened its first phase (phase 1A) to the public on 30 August 2009, and BRT expansion is under construction; stations and roadworks are mainly completed or are in the final stages. The system was partially opened for the 2010 World Cup, with the full system linking most of Johannesburg from Soweto in the south to beyond Sandton in the north. Buses include those able to use the BRT stations and general bus stops, to be feeders for the network; others are articulated, and can only use BRT stations.[5][6] Like most transport projects, the system will be implemented in phases. Phase 1 of the estimated two-billion-rand projects has run articulated right-of-way buses along dedicated median bus lanes in both directions across Johannesburg since 2010, covering almost half the city.[5] The 120-km Phase 1 route includes 150 stations, eight terminals, and six depots. Phase 1A, consisting of a 40-km route with 48 stations, was completed in April 2009 (before the FIFA Confederations Cup); Phase 1B added 86 km and 102 stations to the system before the 2010 World Cup. According to the city's website, the system is fully integrated with other transport networks. Rea Vaya will not compete with other transport systems, such as the South African Rail Commuter Corporation or the Gautrain.[7]
  • Nelson Mandela Bay: A BRT system was implemented in the city for the 2010 World Cup.[8] Bus lanes have been built through the city, with buses built by Marcopolo.
  • Tshwane: Construction began in July 2012,[9] and the system was to be operational from five in the morning to midnight.[10]
  • Rustenburg: The Yarona ("It is ours") BRT system began with Phase 1A trunk and feeder services in 2016.[11]

Tanzania

Dar-es-Salaam has begun building a corridor for bus rapid transit, with 27 km constructed on Morogoro Road.

Uganda

A BRT system was introduced in Kampala in 2014. Pioneer Easy Buses Company began bus service in Kampala with about 100 buses acquired from China, each with a 60-passenger capacity (30 seated and 30 standing).

Americas

Argentina

City System name Lines Date opened Stations Length
Buenos Aires Metrobús Juan B.



Justo
31 May 2011 21 12.5 km (7.8 mi)
9 de Julio 24 July 2013 17 3 km (1.9 mi)
Sur 14 August 2013 37 23 km (14 mi)
25 de Mayo 5 October 2015 0 7.5 km (4.7 mi)
San Martín 27 April 2016 12 5.8 km (3.6 mi)
Norte Etapa 2 24 November 2016 21 2.8 km (1.7 mi)
del Bajo 6 June 2017 25 2.9 km (1.8 mi)
Norte 17 June 2015 39 2.7 km (1.7 mi)
Vicente López Partido 2.2 km (1.4 mi)
La Matanza Partido Metrobús La Matanza 1 5 May 2017 17 10.3 km (6.4 mi)
Neuquén Metrobús Neuquén Under construction
Rosario Metrobús Rosario Norte 30 June 2016 6 1.8 km (1.1 mi)
Santa Fe Metrobús Santa Fe 1 3 May 2017 15 5.7 km (3.5 mi)
Tres de Febrero Partido Metrobús Tres de Febrero 1 6 October 2017 7 3.3 km (2.1 mi)

Brazil

RIT's double articulated buses servicing tube stations in downtown Curitiba
Passengers boarding a Transoeste articulated bus at the Barra da Tijuca terminal in Rio de Janeiro
Transcarioca station at Galeão International Airport in Rio de Janeiro
  • Curitiba's Rede Integrada de Transporte, the world's second BRT system, was implemented in 1974. Its maximum peak-load capacity is 22,500 passenger per hour in its south axis. Its latest corridor, Linha verde, began operations in 2010.
  • São Paulo: Expresso Tiradentes and Corredor Metropolitano ABD
  • Rio de Janeiro: Transoeste (the city's first BRT line, which opened in June 2012), Transcarioca (opened in June 2014), Transolimpica (opened in July 2016) and Transbrasil (under construction)
  • Goiânia: Eixo Anhanguera, a BRT system with segregated bus lanes
  • Porto Alegre: Portais da Cidade, under construction and scheduled to open in 2014
  • Belo Horizonte: BRT Move, under construction and scheduled to open in 2012
  • Manaus
  • Salvador: Under construction, scheduled to open in 2014
  • Aracaju
  • Campinas: Under construction from 2017 to 2020, it will have two main parallel lines (Campo Grande and Ouro Verde) and a secondary link (Perimetral) totaling 36.6 km.
  • Uberlândia: Corredor Estrutural; being expanded, scheduled for completion in 2011-2012
  • Belém: Estação São Bráz, Estação Entrocamento/Castanheira and Estação Mangueirão are under construction and scheduled to be finished in July 2013
  • Uberaba
  • Criciúma
  • Fortaleza
  • Brasília: Eixo Sul (Santa Maria and Gama), the first BRT line, opened in April 2014. Construction of the Eixo EPTG (Taugatinga) BRT line ended in 2013, but it is not in operation due to the lack of an appropriate bus fleet.
  • Vitória: Under construction, scheduled to open in 2014.
  • Praia Grande: Under construction, scheduled to open in 2014.

Canada

The Ottawa Transitway, one of North America's largest BRT systems
R4 41st Ave departing UBC
YRT's Viva bus in York Region, north of Toronto

Chile

Colombia

City Name Began Lines Length Notes
Bogotá TransMilenio December 2000 12 113 km
Cali MIO March 2009 8 49 km Phase I completed; phase II under construction
Medellín es:Metroplús December 2011 3 12.5 km Line 2 opened 2013[19]
Barranquilla Transmetro April 2010 2 13.3 km
Bucaramanga Metrolinea February 2010 11 50 km
Pereira Megabús August 2006 3 27 km
Cartagena Transcaribe November 2015 1 15.3 km

Bogotá's segregated, four-lane TransMilenio system has a maximum peak-load capacity of 45,000 passengers per direction per hour (ppdph) on its busiest line.[20] The system uses modular median stations which serve both directions and enable prepaid, multiple-door, level boarding.[20] The average stop time is 24 seconds. Trunk-line terminals have integrated bicycle parking; the fare card opens a gate to a secure bicycle-parking area. Two lanes in each direction permit "Quickways" (local service on the inside lane combined with express service, skipping four or five stations at a time).[21] TransMilenio was described as a "model BRT system" in the National Bus Rapid Transit Institute's May 2006 report. It serves Bogotá with high-capacity, articulated, three-door buses. Bi-articulated buses are used on the busiest routes, and a smart card system is used for fare collection. Despite its large capacity, Transmilenio has problems with overcrowding.[22]

Ecuador

The Quito trolleybus system has lines running on exclusive BRT lanes with underpass crossings.
  • Quito: El Trole is a trolleybus BRT system operated by Compañía Trolebús Quito. Plans exist to convert the northernmost portion of the system to light rail. Ecovía and Metrobus diesel BRT lines have several subsystems: Trolebús (Corredor Trole), Ecovía (Corredor Ecovía), Metrobús (Corredor Central Norte), Corredor Sur Oriental and Corredor Sur Occidental. Trolebús electric trolley buses can also operate on gas. Except for local routes, all buses are articulated.
  • Guayaquil: Several Metrovia routes have been built, and one is under construction. Except for local routes, all buses are articulated.

Guatemala

Guatemala City's Transmetro has two lines and 32 stations. The first line opened February 3, 2007, and crosses Avenue Aguilar Batres from Villa Nueva to the city. The second line began operation on August 12, 2010, and crosses 6th and 7th Avenues in a one-way-per-avenue scheme.

Mexico

Amistad station of the SITT BRT system in Tijuana

Peru

  • Lima: El Metropolitano is Peru's first mass transit system implemented in several decades. It runs from the northern district of Independencia to the southern district of Chorrillos, on roads such as Avenida Paseo de la Republica, Av. Alfonso Ugarte and Av. Tupac Amaru.
  • Arequipa: Mistibus is under construction.
  • Trujillo: under construction

United States

Venezuela

Asia

Afghanistan

Bangladesh

  • Dhaka: Dhaka Bus Rapid Transit (under construction, expected completion 2019)

China

More than 30 projects are being implemented or studied in China's large cities. In the following table, BRT systems in light blue are under construction. Kunming developed the country's first BRT system in 1999.[46]

BRT systems in China
System Chinese name City Began Main lines Stations[lower-alpha 1] Length (km)[lower-alpha 2] Notes
Hangzhou BRT杭州BRTHangzhou200625055.4
Beijing BRT北京BRTBeijing200446054
Kunming BRT昆明BRTKunming199956346
Changzhou BRT常州BRTChangzhou200825144
Xiamen BRT厦门BRTXiamen200833140[lower-alpha 3]
Jinan BRT济南BRTJinan200824634
Zaozhuang BRT枣庄BRTZaozhuang201024962
Zhengzhou BRT郑州BRTZhengzhou200983830
Guangzhou BRT广州BRTGuangzhou201012622
Suzhou BRT苏州BRTSuzhou2008510695
Dalian BRT大连BRTDalian200811313
Hefei BRT合肥BRTHefei2010297
Yancheng BRT盐城BRTYancheng201022416
Ürümqi BRT乌鲁木齐BRTÜrümqi201146642.2
Changde BRT常德BRTChangde201212520.9
Lianyungang BRT连云港BRTLianyungang201212934
Lanzhou BRT兰州BRTLanzhou20121159.1
Yinchuan BRT银川BRTYinchuan201212221.2[47][48]
Chengdu BRT成都BRTChengdu201312828.8
Nanchang BRT南昌BRTNanchang
Zhongshan BRT 中山BRT Zhongshan 2014 1 13 13 [49]
Yichang BRT 宜昌BRT Yichang 2015 1 22 23
Wenzhou BRT 温州BRT Wenzhou 2015 1 17 13 [50]
Wuhan BRT 武汉BRT Wuhan 2016 1 14 13.6 [51]
Yan'an Road Medium Capacity Transit 延安路中运量公交 Shanghai 2017 1 25 17.5 eBRT using trolleybuses[52]
Guiyang BRT 贵阳BRT Guiyang 2017 1 24 29 [53]
Hohhot BRT 呼和浩特BRT Hohhot 2017 1 40 47 [54]
Yiwu BRT 义乌 BRT Yiwu 2017 1 17 12.1 [55]
Linyi BRT 临沂 BRT Linyi 2017 1 14 12.3 [56]
Nanning BRT 南宁BRT Nanning 2017 1 17 13 [57]
Fengpu Express Line 奉浦快线 Shanghai 2018 1 12 20.6 [58][59]
Fuzhou BRT 抚州BRT Fuzhou (Jiangxi) 2019 1 18 18.5[60][61] [62]
Shenzhen BRT深圳BRTShenzhen
Wuxi BRT无锡BRTWuxi
Xi'an BRT西安BRTXi'an
Shenyang BRT沈阳BRTShenyang
Shijiazhuang BRT石家庄BRTShijiazhuang
Harbin BRT哈尔滨BRTHarbin
  1. Stations connected by transfers are counted as one station, unless otherwise noted.
  2. Corridor length; lines which sharing the same corridor are counted once.
  3. Portions (BRT 1 33.4 km, BRT 1 Interchange 18.7 km and BRT 2 15.3 km) are on dedicated, elevated roads.

India

Government-designated BRT systems (BRTS) with segregated lanes:[63]

Ahmedabad BRTS at night
Jaipur BRTS
Pune Bus Rapid Transit System
Vijayawada Bus Rapid Transit System
Rajkot Bus Rapid Transit System

India is rapidly building new BRTS systems around the country. Several systems are operational while many are under construction and are also proposed.

  • White background: Operational
  • Yellow background: Under Construction
BRT systems in India
System Native name Acronym City Began Main lines Stations[lower-alpha 1] Length (km)[lower-alpha 2] Notes
Rainbow Bus Rapid Transit Systemपुणे BRTPNBRTSPune20066102113
Ahmedabad BRTSઅમદાવાદ BRTAHMDBRTSAhmedabad20091415089
Indore Bus Rapid Transit Systemइंदौर BRTSINDBRTSIndore201310-12.046
Rajkot Bus Rapid Transit System રાજકોટ BRTRAJBRTSRajkot200811810.5
Surat Bus Rapid Transit Systemસુરત BRTSURBRTSSurat201315148114
Bhopal Bus Rapid Transit Systemभोपाल BRTSBHPBRTSBhopal200610230186
Jaipur Bus Rapid Transit Systemजयपुर BRTSJAIBRTSJaipur2010---
Mumbai Bus Rapid Transit Systemमुंबई BRTS PlannedMumbai-1(Planned)--
Bhubaneswar Bus Rapid Transit Systemଭୁବନେଶ୍ୱର BRTS-Bhubaneshwar20192--
Hyderabad Bus Rapid Transit Systemహైదరాబాద్ BRTSSZBRTHyderabad-2--
Jodhpur Bus Rapid Transit Systemजोधपुर BRTSJodhpurBRTSJodhpur20161610
Amritsar Bus Rapid Transit Systemਅੰਮ੍ਰਿਤਸਰ BRTSAMRSTRBRTSAmritsar201878431
Vijayawada Bus Rapid Transit Systemవిజయవాడ BRTVJWDABRTSVijayawada-6--
Hubli-Dharwad Bus Rapid Transit System ಚಿಗರಿ HDBRTS Hubli-Dharwad 1 November 2018 6 33 70
Raipur and Naya Raipur Bus Rapid Transit System रायपुर-नया रायपुर BRTS Raipur-Naya Raipur 2016 2 10 60
Visakhapatnam Bus Rapid Transit System విశాఖపట్నం BRTS Visakhapatnam 2016 2 42

Indonesia

TransJakarta Scania K310IB 6x2 serving Corridor 2 towards Harmoni
Trans Semarang Hino FB130 medium bus serving Corridor 7

TransJakarta (13 lines), the world's longest BRT network (251.2 km),[64] carries more than 1 million passengers daily[65] with a fleet of over 3,900 buses.

BRT systems in Indonesia
System Script name City Began Main lines Stations[lower-alpha 3] Length (km)[lower-alpha 4] Passenger (daily) Source
Transjakarta Jakarta 15 January 2004 13 241 251.2 1,006,579 [64][65]
Trans Batam (id) Batam 24 September 2004 8 39 [66]
Trans Jogja Javanese: ꦠꦿꦤ꧀ꦱ꧀​ꦗꦺꦴꦒ꧀ꦗ​ꦆꦱ꧀ꦠꦶꦩꦺꦮ Yogyakarta 17 February 2008 11 267 [67]
Trans Metro Pekanbaru (id) Pekanbaru 18 June 2009 10 80 [68]
Trans Metro Bandung (id) Sundanese: ᮒᮢᮔ᮪ᮞ᮪ ᮙᮨᮒᮢᮧ ᮘᮔ᮪ᮓᮥᮀ Bandung 23 September 2009 6 52 [69]
Trans Musi (id) Palembang January 2010 6 129 156 [70]
Trans Semarang (id) Javanese: ꦠꦿꦤ꧀ꦱ꧀​ꦯꦼꦩꦫꦁ Semarang 1 October 2010 8 35 [71][72]
Trans Sarbagita Denpasar 18 August 2011 4 31 42 5,000 [73][74]
Trans Metro Dewata Denpasar 7 September 2020 4 30 [75][76]

Iran

Israel

Japan

Yutorīto Line

Jordan

Amman Bus Rapid Transit is under construction and expected to begin operation in 2020. Phase one has three routes: Route 1 ( Mahatta to Sweileh, 15.46 km), Route 2 (Muhajireen to Sports City, 6.79 km) and Route 3 ( Mahatta to Customs Square, 7.88 km).

Malaysia

RapidKL BYD K9 electric bus on an elevated guideway, separate from road traffic
  • BRT Sunway Line, Malaysia's first BRT system, is 5.4 km long and connects major areas of Bandar Sunway on a dedicated, elevated road. It is Asia's first electric BRT system.
  • Iskandar Malaysia BRT will be the second BRT system to be develop in Malaysia with 51 km in length consist of 3 trunk routes for Tebrau, Skudai and Iskandar Puteri corridors.

Pakistan

Rawalpindi-Islamabad Metrobus in Islamabad
TransPeshawar Buses

The Rawalpindi-Islamabad Metrobus system is 24 km long and has 24 stations. The buses run on segregated lanes in Islamabad (the capital) and on an elevated track in Rawalpindi, Pakistan's fourth-most-populous city. Daily ridership exceeds 150,000 passengers.

Lahore's Metrobus was the country's first BRT system. Metrobus operates a fleet of 86 buses,[78] which run on a 28.7-km corridor which includes Ferozepur Road, Model Town, Badshahi Mosque, Mozang Chungi and Gaddafi Stadium. Buses have an average speed of 26 km/h.[79] According to the Lahore Transport Company, Metrobus' daily ridership exceeds 180,000 and peak ridership is 10,000 passengers per direction per hour (ppdph).

Philippines

South Korea

Sejong BRT bus near Government Complex

Taiwan

Chiayi BRT

Chiayi Bus Rapid Transit has two routes: 7211 (between Chiayi City Centre and Puzi) and 7212, between the Chiayi TRA station and the Chiayi HSR station.

Taichung has a "Optimized Bus Lane" formerly designated as Taichung BRT. It is still using most of the facilities built in BRT era, only the priority bus signals were cancelled.[84]

Taipei also has 8 routes that are considered a BRT system.

Thailand

Bus at the Sathon Terminus in Bangkok

The Bangkok BRT runs 16.5 kilometres from Sathon to Ratchapruek. The route begins at Sathon and runs along Narathiwat Ratchanakharin Road, turns right at Rama III Road, crosses the Chao Phraya River on the Rama III Bridge and follows Ratchadaphisek Road before turning right at Ratchahruek Road. At the Sathon-Narathiwat Ratchanakharin intersection, a walkway connects BRT Sathon and the BTS Chong Nonsi station. The system began operating on 29 May 2010.

Turkey

  • Istanbul: Metrobus, between Tuyap and Söğütlüçeşme, is Turkey's first full-service bus rapid transit system. It has a fully separated right-of-way (except crossing the Bosphorus Bridge) and off-bus fare collection.
  • Denizli: Mixed-traffic BRT system
  • Malatya: Trambus is a mixed-traffic BRT system with bi-articulated trolleybuses.

Vietnam

Hanoi BRT 01 (Line 99) bus at the Kim Ma terminal

The 14.7-km Hanoi BRT system runs from the downtown Kim Mã terminal to the Yên Nghĩa terminal in Hanoi's southern suburbs. The line opened on 31 December 2016 with a one-month free trial. The system is a component of the Hanoi Urban Transport Development Project, which was approved by the Hanoi People's Committee in Decision 1837/QĐ-UBND on May 10, 2007. The World Bank-funded ODA project is a step in improving the city's urban transport network and increasing public-transport capacity.

Europe

Austria

  • Vienna's entire bus system includes many BRT features such as stop distancing, place name signs on all bus stop signs, all door boarding and an entirely proof of payment, off-board fare collection system.

Belgium

Finland

Helsinki, Tampere and Turku have extensive bus-lane networks in their city centers.[85]

France

Évéole bus in Douai

Paris region

  • Créteil TVM (Trans-Val-de-Marne), operated by RATP, is a BRT system linking the RER A, B, C, D, Metro line 8 and tramway line T7 in Paris' southern suburbs. It was the second BRT system implemented in France during the 1980s; in Saint-Maur-des-Fossés, for political reasons, there are no bus lanes through the conservative city.
  • Créteil 393 (Ligne de bus RATP 393) also operated by RATP, is an 11-km line which opened in 2011. Like the TVM, the line links the southern Paris suburbs in the département of Val de Marne. Line 393 shares the bus lane and stations with TVM for five kilometres, and serves Metro line 8 and recently developed districts.
  • Corbeil-Essonnes TZen 1 (Ligne 1 du T Zen) opened in 2011, connecting two branches of the RER D and providing public transport to Sénart's business and commercial parks.
  • Évry has a segregated, elevated system.

Germany

  • Essen: Guided buses use a busway in the center of a motorway.

Italy

  • Metromare bus rapid transit, between Rimini and Riccione.

Netherlands

Spain

Sweden

  • Gothenburg: Stombussar Four bus lines (16-19) have frequent service. Routes usually share the right-of-way with trams or have a busway.
  • Stockholm: Blåbussar (Blue buses). Five bus lines (1-4, 6) run frequently and have a higher priority than other buses. The buses are blue; other buses are red. Differences between blue and red buses are very slight however.
  • Malmö: Huvudlinjer (main lines) Eight lines (1-8), which run every seven or eight minutes on weekdays.
  • Jönköping: Citybussarna Three lines (1-3), which usually run about every 10 minutes.
  • Örebro: Stombussar
  • Linköping: Stomlinjer

United Kingdom

  • Belfast: Belfast Rapid Transit is a bus rapid transit system operating on a 15.2 mile (24.5 km) route. Service G1 serves east–west and service G2 serves Titanic Quarter. It opened in September 2018.
  • Hampshire: South East Hampshire Bus Rapit Transit between Gosport and Fareham. A 2.8-mile (4.5 km) bus-only road along the former Fareham–Gosport line has been opened from Titchborne Way in Gosport to Redlands Lane in Fareham as phase one of a larger scheme. Operated by First Hampshire & Dorset as Eclipse.
  • Bradford: 1 mile (2 km) of guided busway and a further 0.6 miles (1 km) of un-guided bus lanes on Manchester Road to the city centre.
  • Cambridgeshire: A guided busway, opened in 2011, runs north-west from Milton Road to St Ives and south from the station to the Trumpington park and ride.
  • Crawley: Fastway
  • Leeds: guided busway along York Road (the A64)
  • Luton: The Luton to Dunstable Busway, running between Luton Airport and Houghton Regis via Dunstable following the Dunstable branch line, which closed in 1989, running parallel to the A505 (Dunstable Road) and A5065 (Hatters Way). t runs for 6.1 miles, of which 4.8 is guided track with a maximum speed of 50 mph. The £91 million scheme opened on 25 September 2013.
  • Manchester: Leigh-Salford-Manchester Bus Rapid Transit, from Leigh and Atherton to Manchester via Tyldesley and Ellenbrook. The 29-stop scheme totals 14 miles (22 km) and uses part of a former railway line to form a 4 miles (7 km) guided busway with a pedestrian and cycle lane and bridleway. It then joins the East Lancashire Road in a dedicated bus lane.[88]
  • Runcorn: the Runcorn Busway, opened in 1971, was the first BRT system in the world and runs for 22 kilometres (14 mi) in a figure of 8 across the town.[89][90]
  • Swansea: Swansea FTR Metro – partially segregated, specialised BRT vehicles, on-board payment to customer-care attendant, runs every 15 minutes from 7 am to 7 pm (a conventional bus at other times).

Oceania

Australia

The O-Bahn Busway in Adelaide, South Australia is one of the world's longest, fastest and most heavily-used guided busways.

New Zealand

See also

Notes

  1. Stations connected by transfers are counted as one station, unless otherwise noted.
  2. Track length; lines which share track are counted once.
  3. Stations connected by transfers are counted as one station, unless otherwise noted.
  4. Corridor length; lines which sharing the same corridor are counted once.

References

  1. "Lamata Assures On Bus Rapid Transit Project". allAfrica. 22 April 2007. Retrieved 30 June 2018.
  2. "BRT/BFS – Lagos State Transport Management". lamata-ng.com. Retrieved 2017-10-11.
  3. "MyCiTi IRT: Project information". capetown.gov.za. Archived from the original on 2013-07-25. Retrieved 2013-08-01.
  4. Malgas, Natalie (24 August 2015). "Full Fleet of Go George Buses to Hit the Roads Amid Tension". Eyewitness News.
  5. BRT offers celebratory free rides on opening day M&G
  6. Laura Tyrer. "REA VAYA BRT SYSTEM". Engineering News.
  7. "Archived copy". Archived from the original on 2008-10-10. Retrieved 2008-10-10.CS1 maint: archived copy as title (link)
  8. "Host Cities for 2009 Confederations Cup: City of Mangaung (Vodacomd Park), City of Johannesburg (Ellis Park), City of Tshwane (Loftus Versveld), City of Mafikeng (Royal Bafokeng), Nelson Mandela Metro (PE)".
  9. Independent Newspapers Online. "BRT marches to Pretoria". Independent Online.
  10. Irma Venter. "City of Tshwane bus rapid transit (BRT) system". Engineering News.
  11. "Rustenburg Rapid Transport". rustenburgrapidtransport.co.za.
  12. http://www.brampton.ca/en/residents/transit/zum/Pages/Planning.aspx Archived 2010-05-09 at the Wayback Machine
  13. "Integrated PIE-IX BRT Project". Société de transport de Montréal. Retrieved 17 November 2020.
  14. "Spadina Subway Extension""Archived copy". Archived from the original on 2010-01-10. Retrieved 2010-03-13.CS1 maint: archived copy as title (link).
  15. http://www.grt.ca/web/transit.nsf/5f22897663adffc585256e5a005c53df/b87230fe20d8ed5b85256f4e005adad2!OpenDocument Archived 2011-01-25 at the Wayback Machine
  16. http://myride.winnipegtransit.com/en/rapid-transit/what-is-bus-rapid-transit-brt/ Archived 2010-06-12 at the Wayback Machine
  17. "Viva Rapid Transit Construction Underway."http://www.vivanext.com/391, December 14, 2009.
  18. "Viva buses operate along new Enterprise rapidly, starting March 6" http://transittoronto.ca/archives/weblog/2011/03/04-viva_buses.shtml.
  19. "Global BRT Data". BRTDATA.ORG. Retrieved 22 August 2014.
  20. Insititute for Transportation and Development Policy, Appendix 1 System Comparisons, BRT Planning Guide
  21. FTA_ Commissioned report, Advanced Network Planning for Bus Rapid Transit The Quickway Model as a Modal Alternative to "Light Rail Lite"
  22. "Applicability of Bogotá's TransMilenio BRT System to the United States" Archived 2011-07-26 at the Wayback Machine NBRTI (May 2006). Retrieved 15 March 2010.
  23. http://correo.leon.gob.mx/admon03_06/transporte/sitioweb Archived 2005-04-09 at the Wayback Machine
  24. "Metrobus". Archived from the original on September 30, 2013. Retrieved July 3, 2018.
  25. "Archived copy". Archived from the original on 2015-10-12. Retrieved 2015-10-07.CS1 maint: archived copy as title (link)
  26. "Route Puebla: Urban Articulated Transport Network". Retrieved July 3, 2018.
  27. http://www.sitt.org.mx/inicio/rutasymapas/ Archived 2017-10-17 at the Wayback Machine
  28. https://www.itdp.org/2017/11/27/albuquerque-gold-standard-brt/
  29. https://www.globenewswire.com/news-release/2017/11/27/1206471/0/en/ART-System-Receives-Rare-Gold-Standard-from-ITDP.html
  30. https://www.metro-magazine.com/10033361/albuquerque-brt-receives-rare-gold-standard-recognition
  31. https://www.ridetherapid.org/silver-line Archived 2015-09-05 at the Wayback Machine
  32. https://lakerline.org/ |date=2019-08-16
  33. https://www.ridetherapid.org/future-planning/Laker-Line-Study |date=2019-08-16
  34. "CTfastrak.com - HOME". ctfastrak.com.
  35. https://www.ridemetro.org/Pages/BusShuttles.aspx#
  36. https://www.ridemetro.org/Pages/METRORapid.aspx
  37. "Red Line — IndyGo". 2019-09-04.
  38. "Purple Line — Rapid Transit: Indy to Lawrence!". 2019-05-27.
  39. "Blue Line". 2019-05-27.
  40. "About - First Coast Flyer". JTA First Coast Flyer. Jacksonville Transportation Authority. Retrieved 5 February 2020.
  41. http://www.estreet-sbx.com/docManager/1000000450/sbx%20Winter2011%20FINAL.pdf Archived 2011-07-10 at the Wayback Machine
  42. "AC TRANSIT ANNOUNCES THE GROUNDBREAKING CEREMONY FOR THE EAST BAY BUS RAPID TRANSIT | AC Transit". www.actransit.org. Retrieved 2018-08-13.
  43. Wirtschafter, Eli. "Hey Area: What help is there for Oakland businesses impacted by bus rapid transit?". Retrieved 2018-08-13.
  44. "Route 522". Santa Clara Valley Transportation Authority. Retrieved July 4, 2018.
  45. "Livermore Amador Valley Transit Authority : Tri-Valley Rapid". Retrieved 2019-09-26.
  46. http://www.itdp.org/index.php/projects/update/a_new_generation_of_bus_rapid_transit_systems_open_in_china/ Archived 2008-05-09 at the Wayback Machine
  47. "银川新闻网--快速公交 幸福在路上". www.ycen.com.cn. Retrieved 2019-04-01.
  48. "银川公交公司-银川市公共交通有限公司". www.ycgjgs.com. Archived from the original on 2019-04-01. Retrieved 2019-04-01.
  49. "我市首条快速公交示范线今开通_本地新闻_新闻频道_中山网". www.zsnews.cn. Archived from the original on 2019-04-01. Retrieved 2019-04-01.
  50. "温州快速公交BRT一号线试运营". 2016-03-04. Archived from the original on 2016-03-04. Retrieved 2019-04-01.
  51. "武汉首条BRT开通:快速公交贯通雄楚大道-武汉新房网-房天下". newhouse.wuhan.fang.com. Retrieved 2017-05-12.
  52. "体验过中运量公交 有一句话我一定要讲 | 观察-搜狐汽车". auto.sohu.com. Retrieved 2017-05-12.
  53. "Go, free to sit Guiyang BRT! January 21 opening of February 12 are free Oh - News". www.top-news.top. Retrieved 2017-03-03.
  54. "呼和浩特开启全新交通出行方式——BRT快速公交 —— 新华网内蒙古频道". www.nmg.xinhuanet.com (in Chinese). Archived from the original on 2017-09-27. Retrieved 2017-09-27.
  55. "浙江义乌开通首条城区快速公交BRT - 津范儿". tjfer (in Chinese). Retrieved 2017-06-28.
  56. "临沂BRT快速公交模拟线路B-1开通 设站点28处". www.ql1d.com. Retrieved 2017-09-10.
  57. "南宁快速公交1号线开通运营 无缝对接地铁高铁-广西新闻网". www.gxnews.com.cn. Retrieved 2017-05-12.
  58. "奉浦快线运营:像坐地铁一样坐公交 感觉真不错-brt 快线 公交专用道 收藏 单程票-上海频道-东方网". sh.eastday.com. Retrieved 2019-04-01.
  59. ""奉浦快线"首日通车,邀请20位市民一起见证历史_发布台_新民网". newsxmwb.xinmin.cn. Retrieved 2019-04-01.
  60. "抚州BRT二期试运行_抚州新闻网". www.zgfznews.com. Retrieved 2020-12-05.
  61. "注意!抚州BRT开通后,城区这些路口禁止左转...(附通行攻略)".
  62. "江西日报整版报道:抚州快速公交成功运营的启示_政务_澎湃新闻-The Paper". www.thepaper.cn. Retrieved 2020-12-05.
  63. "Growth of Bus Rapid Transit in India -". 2016-04-06. Retrieved 2017-10-11.
  64. "Koridor". transjakarta.co.id (in Indonesian). Transjakarta. 2020. Retrieved 7 February 2021.
  65. "Achievement unlocked: Transjakarta breaks record for serving one million customers in a day". The Jakarta Post. 5 February 2021. Retrieved 8 April 2020.
  66. "Jadwal Keberangkatan Bus Trans Batam di Semua Koridor (Masa Pandemi Covid-19)" (in Indonesian). Government of Batam. 11 August 2020. Retrieved 8 February 2021.
  67. "Data Trans Jogja" (in Indonesian). Government of Yogyakarta. Retrieved 7 February 2021.
  68. "Ada Dua Rute Koridor Baru Bus TMP" (in Indonesian). Government of Pekanbaru. 20 February 2020. Retrieved 7 February 2021.
  69. "BUS RAPID TRANSIT (BRT) TRANS MUSI" (in Indonesian). PT Sarana Pembangunan Palembang Jaya. 2012. Retrieved 8 February 2021.
  70. "BUS RAPID TRANSIT (BRT) TRANS MUSI" (in Indonesian). PT Sarana Pembangunan Palembang Jaya. 2012. Retrieved 8 February 2021.
  71. "COMPANY PROFILE BLU UPTD TRANS SEMARANG" (in Indonesian). Government of Semarang. 31 August 2020. Retrieved 8 February 2021.
  72. "Trans Semarang's Main Corridor Line Diagram" (in Indonesian). BLU Trans Semarang. 1 October 2020. Retrieved 8 February 2021.
  73. The Jakarta Post (25 May 2011). "New traffic control system, buses hoped to ease congestion". The Jakarta Post. Retrieved 7 February 2021.
  74. "Trans Sarbagita: Denpasar-Jimbaran route starts Friday". 10 August 2012. Archived from the original on 24 August 2012. Retrieved 10 August 2012.
  75. Yusuf, Naufal Fikri; Yudha, Pande (11 December 2020). "Pemkab Tabanan luncurkan Bus Trans Metro Dewata Koridor I" (in Indonesian). Antara. Retrieved 7 February 2021.
  76. "Melongok Bus Trans Metro Dewata yang Sudah Beroperasi Empat Bulan" (in Indonesian). Bali Express. 14 January 2021. Retrieved 7 February 2021.
  77. "Bandarlampung to unveil BRT as passenger-friendly transport". 22 September 2011.
  78. Khan, Rameez. "Public transport: Govt to order studies on new Metro Bus projects". The Express Tribune. Retrieved 6 August 2013.
  79. "Lahore BRT System Study" (PDF). Lahore Transport Company. Archived from the original (PDF) on 2 November 2013. Retrieved 7 August 2013.
  80. Zurbano, Joel (June 24, 2020). "EDSA Busway seamless and faster—DOTr". Manila Bulletin. Retrieved July 13, 2020.
  81. 헤럴드경제. "고양∼수색 BRT 개통 1주일 연기". heraldcorp.com.
  82. 기호일보. "하남 BRT 차고지 준공 1200명 참가 축하 인사". 기호일보.
  83. "[인천/경기]'청라∼강서 BRT' 이용객 꾸준히 증가". donga.com.
  84. "優化公車專用道" (PDF). Bureau of Transportation, Taichung City. Retrieved 18 April 2020.
  85. Hsy / Hsl Archived 2008-03-30 at the Wayback Machine
  86. Evry, un réseau TCSP conçu en cohérence avec la ville nouvelle
  87. Ann Brody Guy. "Using ITS Research, Barcelona Launches BRT Network". Berkeley Transportation Letter. Retrieved 2010-06-08.
  88. "Greater Manchester bus priority package consultation" (PDF). Transport for Greater Manchester. August 2012. Archived from the original (PDF) on 2016-04-15.
  89. Lesley, Lewis (1983). "Runcorn - A Rapid Transit New Town?". Built Environment. 9 (3/4): 234. JSTOR 23286723.
  90. "Runcorn New Town - 7.3 Transport". rudi.net. Archived from the original on 18 October 2014. Retrieved 24 July 2020.