Nuclear power in Pakistan
As of 2017, nuclear power in Pakistan is provided by five commercial nuclear power plants.[1] Pakistan is the first Muslim majority country in the world to construct and operate civil nuclear power plants.[2] The Pakistan Atomic Energy Commission (PAEC), the scientific and nuclear governmental agency, is solely responsible for operating these power plants.[3] As of 2012, the electricity generated by commercial nuclear power plants constitutes roughly 3.6% of electricity generated in Pakistan, compared to about 62% from fossil fuel and 33% from hydroelectric power.[4][5] Pakistan is not a party to the Nuclear Non-Proliferation Treaty but is a member of the International Atomic Energy Agency.[6][7][8] Pakistan plans on constructing 32 nuclear power plants by 2050.[9]
Electricity generation in Pakistan |
---|
History
Professor (and later Nobel laureate) Abdus Salam, as Science Advisor to the President, persuaded President Ayub Khan, to establish Pakistan's first commercial nuclear power reactor, near Karachi.[10][11] Known as Karachi Nuclear Power Plant (KANUPP), the commercial power plant is a small 137 MWe CANDU reactor, a Canadian pressurized heavy water reactor.
PAEC's Parvez Butt, a nuclear engineer, was project-director. The KANUPP began its operations in 1972, and it was inaugurated by President Zulfikar Ali Bhutto and Munir Ahmad Khan as PAEC chairman.[12] The KANUPP which is under international safeguards is operated at reduced power. In 1969, France's Commissariat à l'énergie atomique and United Kingdom's British Nuclear Fuels plc (BNFL) contracted with PAEC to provide plutonium and nuclear reprocessing plants in Pakistan. Per the agreement, the PAEC engineers were the lead designers of the power plants and nuclear-reprocessing facilities. While the BNFL and CEA provided the funds, technical assistance, and nuclear materials. The work on projects did not start until 1972, and as a result of India's Operation Smiling Buddha — a surprise nuclear test in 1974 — the BNFL cancelled the projects with PAEC. In 1974, PARR-II Reactor were commissioned, and its project directors were Munir Ahmad Khan and Hafeez Qureshi. The PARR-II is an indigenous reactor that was built under the auspices of PAEC's engineers and scientists.
In 1977, due to pressure exerted by U.S. Secretary of State Henry Kissinger, the CEA cancelled the projects with PAEC immediately. Without the assistance of United Kingdom and France, the PAEC engineers completed the plutonium nuclear reprocessing plant — New Labs — and the plutonium reactor — Khushab Nuclear Complex. Both power plants are commercial power plants control by PAEC. In 1989, People's Republic of China signed an agreement with Pakistan to provide 300 MWe CHASNUPP-I power plant under the IAEA safeguards. In 1990, both France and the Soviet Union considered Pakistan's request to provide the commercial nuclear power plants under the IAEA safeguards.[13] But, after the American Ambassador to Pakistan's Robert Oakley expressed U.S. displeasure at the agreements between the Soviet Union and France, the contracts were cancelled.[14] By the 2000, China had expanded its contract with PAEC and is currently assisting in construction of III, and IV power plants. II was completed in April 2011. Due to its growing electricity demands, the Pakistan Government ordered PAEC to set up nuclear power plants in the country. According to PAEC, the goal is to produce 8800 MW electricity by 2030. Prime minister Yousaf Raza Gillani announced the Pakistan national energy policy in 2010 while the feasibility report was submitted in Prime Minister's Secretariat — the official residence of the prime minister of Pakistan. The PAEC is currently planning to lead the construction of the KANUPP-II nuclear power plant — a 1100 MWe power plant — and the KANUPP-III — 1100 MWe. While the commercial plants will be indigenously built, the preliminary work is put on hold as of 2009. In 2010, the Nuclear Power Fuel Complex (PNPFC) — a nuclear reprocessing power plant — was commissioned. PAEC led the construction, designing, and maintenance of the facility, while China and IAEA provided funds to the facility. On 26 November 2013 prime minister Nawaz Sharif performed the groundbreaking ceremony for two nuclear power plants with a combined capacity of 2200 MW near Karachi.
International co-operation
China
China has been a strong vocal and avid supporter of Pakistan's nuclear power generation programme from the early on. The history of Chinese-Pakistan cooperation dates back to the 1970s when Zulfikar Ali Bhutto, as prime minister, first visited China. The strong academic interaction between Chinese and Pakistan scientists was begun in the 1970s. In 1986, the scientists from KRL and military engineers of the Pakistan Army Corps of Engineers built a HEU enrichment plant in Hanzhong province of PRC, and provided technical assistance to China in weapon-grade centrifuge technology for Chinese nuclear weapons. From the 1980s to the present, China has contracted with Pakistan to use of civil and electricity purpose use of nuclear technology.
As of 1990 contract, the second commercial nuclear power plant is CHASNUPP-I in Punjab—a 325 MWe PWR—supplied by China's China National Nuclear Corporation (CNNC) under IAEA safeguards. The main part of the plant was designed by Shanghai Nuclear Engineering Research and Design Institute (SNERDI), based on Qinshan Nuclear Power Plant. The commercial nuclear power plant began its operations May 2000. In 2005, China expanded its contract with Pakistan, and vowed to build more nuclear power plants in Pakistan. Construction of its twin, CHASNUPP-II, started in December 2005. It is reported to cost PkR 51.46 billion (US$860 million, with $350 million of this financed by China). In a meeting with IAEA, an IAEA safeguard agreement with PAEC and IAEA was signed in 2006, and the grid connection is expected in spring of 2011. The enriched fuel takes place in Pakistan's PNPFC facility, which is also under IAEA safeguards.
In 2005, both Pakistan government and the Chinese government adopted an Energy Security Plan, calling for a huge increase in generating capacity to more than 160,000 MWe by 2030. Pakistan Government plans for lifting nuclear capacity to 8800 MWe, 900 MWe of it by 2015 and a further 1500 MWe by 2020.[15]
Plans included four further Chinese reactors of 300 MWe each and seven of 1000 MWe, all PWR. There were tentative plans for China to build two 1000 MWe PWR units at Karachi as KANUPP II and III, but China then in 2007 deferred development of its CNP-1000 type which is the only one able to be exported. However, Last November 2012, China rolled out its new advanced 1000 MW pressurised water nuclear power reactor, ACPR-1000 at the Hi-Tech Fair in Shenzhen. This reactor was "independently" developed by China Guangdong Nuclear Power Corporation with full IPR and made its debut at the 13th China Hi-Tech Fair, according to the official media. Since this reactor has been developed by China independently without the involvement of foreign suppliers, it is quite likely that China will export this reactor to Pakistan. PAEC is now currently preparing reports and planning to set up small but more commercial nuclear power plants indigenously.
In June 2008, the Pakistan Government announced plans to build commercial nuclear power plants III and IV commercial nuclear power plants at Chashma, Punjab Province, each with 320–340 MWe and costing PKR 129 billion, 80 billion of this from international sources, principally China. A further agreement for China's help with the project was signed in October 2008, and given prominence as a counter to the US–India agreement shortly preceding it. Cost quoted then was US$1.7 billion, with a foreign loan component of $1.07 billion.
In March 2009, SNERDI announced that it was proceeding with design of CHASNUPP-III and IV, with China Zhongyuan Engineering as the general contractor. The PAEC said Beijing was financing 85% of the US$1.6 billion project. Contracts for CHASNUPP-I and II were signed in 1990 and 2000, before 2004 when China joined the Nuclear Suppliers Group (NSG), which maintains an embargo on sales of nuclear equipment to Pakistan, but there are questions about China's supply of Chasma-3 and 4. On 24 September 2010, China informed the IAEA that it will implement an agreement with Pakistan on the export of two nuclear reactors for Islamabad's Chashma nuclear complex. Beijing has said that the reactor deal is part of a 2003 agreement between the two countries, a claim many have questioned, though Germany has accepted.[16] These will be the third and fourth reactors at the complex. According to the Chinese communication to the IAEA, the reactors will be placed under international safeguards.[17] Concerns have been expressed over the lack the safety features incorporated into the Chashma-3 and Chashma-4 reactors, which are alleged to use a design which is not considered safe enough to build in China.[18]
In March 2013, Pakistan and China agreed to build a 1000 MW CHASNUPP-5 at Chashma Nuclear Power Complex.[19] In July 2013, it was announced that Pakistani officials were considering approval of KANUPP-2, a 1,000 megawatt reactor to be built with assistance from China.[20][21]
France
In May 2009, France agreed to cooperate with Pakistan on nuclear safety, which Pakistan's Foreign Minister called a 'significant development' related to the transfer of civilian nuclear technology to Pakistan. But later a spokesman for the French presidency was careful to rein in expectations, saying Mr Sarkozy had "confirmed France was ready, within the framework of its international agreements, to co-operate with Pakistan in the field of nuclear safety."[22] In October 2013, French Ambassador Philippe Thiebaud said "my country is ready to consider the request for enhancing civil nuclear cooperation in line with international obligations."[23]
United States
In a U.S.–Pakistan strategic dialogue on 24 March 2010, Pakistan pressed for a civil nuclear cooperation deal similar to that with India.[24] One analyst suggested that such a deal was unrealistic at present but might be possible in 10–15 years.[25]
Japan
In 2011, Dr. Irfan Yusuf Shami, the Director-General (Disarmament) of the Ministry of Foreign Affairs of Pakistan and Makyo Maya Gawa, the Director-General of Disarmament and Non-Proliferation Department of the Japanese Ministry of Foreign Affairs signed an agreement for nuclear non-proliferation in Tokyo. Both countries agreed on maintaining stability in South Asia.[26]
In 2011, during the state visit of President Asif Zardari, Pakistan sought civil nuclear power cooperation with Japan, similarly to a previous deal between Japan and India. According to the Jang News group, the Japanese government refused the deal with Pakistan.[27] According to the Pakistan Media, the Pakistan officials were highly disappointed with Japanese denial. On the other hand, Japanese officials were left disappointed as Pakistan had denied the Japanese request to support Japan's candidacy for permanent seat for the United Nations Security Council.
Fuel cycle
The government has set a target of producing 350 tonnes (U3O8)per year from 2015 to meet one third of anticipated requirements then. Low grade Ore is known in central Punjab Province at Bannu Basin and Sulaiman Mountains.
A small (15,000 SWU/yr) uranium centrifuge enrichment plant at Kahuta has been operated by the KRL since 1984 and does not have any apparent civil use. It was expanded threefold about 1991. A newer plant is reported to be at Gadwal which is operated by PAEC. The plant is not under safeguards of IAEA.
In 2006, the PAEC announced that it was preparing to set up separate and purely civil conversion, enrichment and fuel fabrication plants as a new US$1.2 billion Nuclear Power Fuel Complex which would be under IAEA safeguards and managed separately from existing facilities. At least the enrichment plant would be built at Chak Jhumra, Faisalabad, in the Punjab and have a 150,000 SWU/yr capacity in five years — about 2013, then be expanded in 150,000 SWU increments to be able to supply one third of the enrichment requirements for a planned 8800 MWe generating capacity by 2030.
Radioactive wastes management
The Pakistan Atomic Energy Commission (PAEC) is responsible for the radioactive waste management. From 1972, the PAEC has undertaken to establish the safety objectives, management, and radioactive waste management.[28] In 2004, the PNRA issued guidelines for the management of nuclear and radioactive waste management in nuclear and medical research centers under PAEC.[29] In 2010, the PNRA issued regulatory policy on radioactive waste materials, and Pakistan lawmakers presented the regulatory policy in Pakistan Parliament. The Parliament passed the PNRA regulatory policy unanimously, making it into laws.[30]
The PNRA proposed new Waste Management offices to control of the radiation and radioactive materials. The Waste Management Centres are proposed for Karachi, Rawalpindi, Nilore, Lahore and Chashma. Used fuel is currently stored at each reactor in pools. Longer-term dry storage at each site is proposed. The question of future reprocessing remains open. A National Repository for low- and intermediate-level wastes is due to be commissioned by 2015.
Nuclear reprocessing
The country also has operated one indigenous reprocessing plant, built by PAEC, which was known as the New Labs — outside PINSTECH, Nilore, near Islamabad.[31] The PAEC had contracted with British BNFL for a reprocessing facility which was cancelled in 1974. It was built under the leadership of Mr. Munir Ahmad Khan[32] The plant became functional in the early 1980s, and it is not under IAEA inspection. The second nuclear reprocessing plant was also started by PAEC under Munir Ahmad Khan, in 1976, at Chashma, under a contract agreement with France However, France cancelled the agreement for the said plant under US influence in August 1978 .[33] In 2006, the PAEC started work another nuclear fuel fabrication plant — Pakistan Nuclear Power Fuel Complex — located 175 kilometers south near Islamabad. An indigenous Nuclear Fuel Fabrication Complex at Kundian, known as Kundian Nuclear Fuel Complex (KNFC), already exists which was built by PAEC under Munir Ahmad Khan and completed by 1980. Kundian Nuclear Fuel Complex makes nuclear fuel for KANUPP. However, the 2006 PNPFC project is being financed by the joint Sino-Pak Nuclear Technology Consortium, and the PAEC is leading the designing and construction of the plant. It will be under safeguards but KNFC is not under safeguards.[34] The Pakistan Nuclear Power Fuel Complex is under the IAEA safeguards and inspections as the IAEA also contributed in the mega project financially.
Radiation control
The PAEC's directorate for Nuclear Safety and Radiation Control (NSRC) was responsible for the radiation and high radioactive material control in the country. However, in 2001, with the establishment of the Pakistan Nuclear Regulatory Authority (PNRA), the responsibilities were shifted to PNRA. In 2003, the responsibilities and agency's goals were expanded, as PNRA were given the status of an executive agency. The PNRA oversees reactor safety and security, reactor licensing and renewal, radioactive material safety, security and licensing, and spent fuel management (storage, security, recycling, and disposal).[35] The PNRA closely work with Chinese CNNC, and is frequently visited by Chinese staff as its technical advisers.
Nuclear accidents
On 18–19 October 2011, the KANUPP Karachi nuclear power plant imposed a seven-hour emergency after heavy water leaked from a feeder pipe to the reactor. The leakage took place during a routine maintenance shut down, and the emergency was lifted seven hours later, after the affected area was isolated.[36]
Industry and academic
The Pakistan Nuclear Society (PNS) is a scientific and educational society that has both industry and academic members.[37] The organization publishes large amount of scientific literature on nuclear technology on several journals. The PNS also allied itself with American Nuclear Society (ANS), European Nuclear Society (ENS), Indian Nuclear Society (INS), Korean Nuclear Society (KNS), Chinese Nuclear Society (CNS), Hungarian Nuclear Society (HNS), and the Spanish Nuclear Society (SNS).[38] The Pakistan Atomic Energy Commission also published large sums of publication, and published a quarterly magazine — The Nucleus.[39] The PAEC's academic scientists and engineers also publishes the newsletter — The PakAtom — concerning on nuclear technology and lobbying for the commercial nuclear power plants.[40]
Academic research
The academic research on nuclear technology began in 1956, with the establishment of Pakistan Atomic Energy Commission. In 1965, United States provided a 10 MW research reactor – Pakistan Atomic Research Reactor-I (PARR) – to Pakistan. The PARR-Reactor consists of three research reactors with a single nuclear particle accelerator. The first reactor was supplied by the U.S. government in 1965 and it is operated by the Pakistan Institute of Nuclear Science and Technology (PINSTECH). In 1969, the Center for Nuclear Studies was established, and it began its research in a small reactor that was provided by the PAEC. In 1989, the PAEC had built another small research reactor, known as Pakistan Atomic Research Reactor-II reactor. The PARR-II reactor is an indigenously built reactor by the PAEC, and is under IAEA safeguards since IAEA had funded this mega-project.
In 1986, another "multipurpose" heavy water reactor, a 50 MWe pressurised heavy water reactor (PHWR) near Khushab, was built. Known as Khushab-I, it went critical and started its operations in April 1998. The complex is evidently for producing weapons-grade plutonium, isotope production and nuclear reprocessing. A similar or possibly larger heavy water reactor has been under construction at Khushab since about 2002. Khushab is reported to be making demands upon the country's limited uranium resources. Reprocessing of weapon-grade material is reported to take place at Chashma Nuclear Complex, 80 km west.
References
- (PAEC), Pakistan Atomic Energy Commission (12 May 2011). "Prime Minister inaugurates 340 MW Chashma Nuclear Power Plant Unit-2: Govt to provide full support to PAEC for Nuclear Power Projects Urges International Community to make nuclear technology accessible to Pakistan for power generation". Pakistan Atomic Energy Commission's Press Directorate. Pakistan Atomic Energy Commission Directorate for Public Press and International News Relations.
- Nuclear power in Pakistan, Dr. Zia H. Siddiqui and Dr. I.H. Qureshi, pp.31–33.
- (PAEC), Pakistan Atomic Energy Commission. "Nuclear Power Generation Programme". Government of Pakistan. PAEC. Archived from the original on 9 February 2005.
- Syed Yousaf, Raza (31 July 2012). "Current Picture of Electrical Energy In Pakistan". Pakistan Atomic Energy Commission. Directorate-General for Nuclear Power Generation. Retrieved 28 November 2012.
- Zulfikar, Saman (23 April 2012). "Pak-China energy cooperation". Pakistan Observer. Archived from the original on 27 September 2013. Retrieved 23 April 2012.
- UN Press Release. "IAEA Publications: Pakistan Overview". IAEA, P.O. Box 100, Wagramer Strasse 5, A-1400 Vienna, Austria. IAEA Membership states. Archived from the original on 12 June 2007. Retrieved 17 April 2012.
- Associate Press of Pakistan (APP) (25 April 2011). "IAEA declares nuclear energy programme safe". Dawn. Pakistan. Retrieved 17 April 2012.
- Dahl, Fredrik (27 September 2010). "Nuclear-armed Pakistan chairs board of U.N. atom body". Reuters, Vienna. Retrieved 17 April 2012.
"Pakistan is a long-standing and "very law-abiding" member of the IAEA, got no opposition from any side at all
- "The News International: Latest News Breaking, Pakistan News". The News International. Retrieved 1 April 2018.
- Professor Riazuddin (13 October 2005). "Contribution of Abdus Salam as Member of PAEC" (PDF). The Nucleus. Nilore, Islamabad: The Nucleus PINSTECH publication. 42 (1–2): 31–34. ISSN 0029-5698. Archived from the original (PDF) on 27 June 2014.
- Siddiqui, Dr. Zia; Dr. Iqbal Hussain Qureshi (13 October 2005). "Nuclear power in Pakistan" (PDF). The Nucleus. Nilore, Islamabad: The Nucleus PINSTECH publication. 42 (1–2): 63–66. ISSN 0029-5698. Archived from the original (PDF) on 6 March 2012.
- "Pakistan Makes Achievements in Peaceful Use of Nuclear Energy". Xinhua General Overseas News Service. 27 October 1979. Archived from the original on 18 September 2011.
- "Soviet Ambassador Says Soviets Might Sell Pakistan A Nuclear Plant". 26 February 1990. Archived from the original on 8 November 2010.
- Nizami, Majid; Salim Bukhari (26 February 1990). "Paper Says US To Object To Nuclear Plant Deal". The Nation. Islamabad, Islamabad Capital Territory: Nawa-i-Waqt Media Group. pp. 1–2. Archived from the original on 8 November 2010.
- Ijaz, Muhammad, Director of Scientific Information and Public Relation (SIPR) (December 2010). "PAEC assigned 8,800 MWe nuclear power target by 2030:PAEC contributing to socio-economic uplift of the country" (PDF). PakAtom Newsletter. Islamabad, Islamabad Capital Territory: Pakistan Atomic Energy Commission. 49 (1–2): 1–8. Retrieved 201. Check date values in:
|access-date=
(help) - "Germany Opposes United States on China-Pakistan Nuclear Deal". armscontrolnow.org. 21 June 2011. Retrieved 1 April 2018.
- Samanta, Pranab Dhal (24 September 2010). "Out in open: China tells IAEA it'll sell n-reactors to Pakistan". The India Express. Archived from the original on 18 August 2011.
- Chari, P.R. (13 July 2011). "Why Indians are not welcome members at the NSG club". Daily News and Analysis (DNA). Retrieved 1 August 2011.
- "China, Pakistan reach controversial deal on nuclear power plant, sources say". Fox News Channel. 21 March 2013. Retrieved 1 April 2018.
- "With Chinese assistance: ECNEC set to approve three nuclear power plants – The Express Tribune". The Express Tribune. 4 July 2013. Retrieved 1 April 2018.
- "Commitment for new Pakistan reactors". World Nuclear News. 11 July 2013. Retrieved 30 September 2013.
- "Pakistan in 'French nuclear deal'". BBC News. 15 May 2009.
- "Civil-nuclear cooperation: French govt says option can be explored at request". The Express Tribune. 3 October 2013.
- "Pakistan Pursues Nuclear Deal at High-Level Talks With U.S. – Analysis – NTI". gsn.nti.org. Retrieved 1 April 2018.
- "Pakistan-United States nuclear deal long way off". State-owned Assets Supervision and Administration Commission. Xinhua News Agency. 29 March 2010. p. 1.
- "Pakistan and Japan signed Nuclear non-proliferation Agreement". Daily Jang (in Urdu). Tokyo, Japan: Jang Group of Newspapers. 2011. p. 1. Archived from the original on 20 January 2011.
- Michealson, David (27 February 2011). "Japan denied the civil nuclear power cooperation with Pakistan". Daily Jang (in Urdu). Tokyo, Japan: Jang Group of Newspapers. pp. 3–4. Archived from the original on 2 March 2011.[ Japan denied the civil power cooperation with Pakistan]
- (NSD), Nuclear Safety Directorate (March 2010). "Nuclear Safety Policy of Pakistan Atomic Energy Commission". PAEC. Pakistan Atomic Energy Commission. Archived from the original on 12 November 2010.
- PNRA (March 2010). "Guidelines for the Management of Radioactive Waste (MRW) in hospitals/nuclear research and nuclear medical centers" (google docs). PAEC. Pakistan Atomic Energy Commission.
- PNRA, Pakistan Nuclear Regulatory Authority (March 2010). "Regulations of Radioactive Waste Management" (google docs). PNRA. Pakistan Nuclear Regulatory Authority.
- Albright, David (1 June 1998). "The New Labs".
- Munir Ahmad Khan, How Pakistan made nuclear fuel, The Nation, 1998
- Chaudhry, M.A. (1998). "Pakistan's Nuclear History: Separating Myth from Reality". Defence Journal of Pakistan. Defence Journal Publication Media Group. Missing or empty
|url=
(help) - (WNA), World Nuclear Association. "Fuel cycle Management". Nuclear power consortium management desk. The Pakistan Atomic Energy Commission and World Nuclear Association.
- Pakistan Nuclear Regulatory Authority (PNRA), PNRA official site.
- Aziz, Faisal (20 October 2011). "Leak at Pakistani nuclear plant, but no damage". Reuters. Retrieved 22 October 2011.
- (PNS), Pakistan Nuclear Society. "Pakistan Nuclear Society". Archived from the original on 20 March 2012.
- (PNS), Pakistan Nuclear Society's affiliation, Related Links, archived from the original on 20 March 2012
- Qureshi, Riffat M.; Hussain, Nazar (2011), The Nucleus
- Dr. Inam-ur-Rahman, PakAtom, archived from the original on 21 June 2010
Suggested reading
- Siddiqui, Dr. Zia H.; Qureshi, I. H. (2005), "Nuclear Power in Pakistan" (PDF), The Nucleus, Nilore, Islamabad Capital Territory: Pakistan Institute of Nuclear Science and Technology (PINSTECH), 42 (1–2): 63–66, ISSN 0029-5698, archived from the original (PDF) on 6 March 2012, retrieved 11 May 2010
- Nuclear Power for Pakistan: Reviving the 3Es (Energy, Economy, and Environment), by Abdul Rehman Abbasi and Anwar ul Hasson Syed, in Proc. ICESE-2010.