116th Street–Columbia University station

116th Street–Columbia University is a local station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. It is located at the intersection of Broadway and 116th Street in Morningside Heights, Manhattan, just outside the west gate to the main campus of Columbia University and the southeast corner of the Barnard College campus. The station is served by the 1 train at all times.

 116 Street–Columbia University
 
New York City Subway station (rapid transit)
Platform for uptown trains
Station statistics
AddressWest 116th Street & Broadway
New York, NY 10027[1][2]:1
BoroughManhattan
LocaleMorningside Heights
Coordinates40°48′29″N 73°57′50″W
DivisionA (IRT)
Line   IRT Broadway–Seventh Avenue Line
Services   1  (all times)
Transit NYCT Bus: M4, M60 SBS, M104[3]
Columbia Transportation: all routes except Fort Lee Shuttle.
Barnard Public Safety Shuttle
StructureUnderground
Platforms2 side platforms
Tracks3 (2 in regular service)
Other information
OpenedOctober 27, 1904 (1904-10-27)[4]
Station code307[5]
Opposite-
direction
transfer
Yes
Traffic
20194,380,469[6] 3.3%
Rank112 out of 424[6]
Station succession
Next north125th Street: 1 
Next southCathedral Parkway–110th Street: 1 

116th Street–Columbia University Subway Station (IRT)
New York City Landmark No. 1096
MPSNew York City Subway System MPS
NRHP reference No.04001020[2]
NYCL No.1096
Significant dates
Added to NRHPSeptember 17, 2004
Designated NYCLOctober 23, 1979[7]

Built for the Interborough Rapid Transit Company (IRT), the 116th Street station was constructed as part of the city's first subway line, which was approved in 1900. Construction on the segment of the line that includes 116th Street started on June 18 of the same year. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The station's platforms were lengthened in 1948 to accommodate ten-car trains, the station's median entrance was replaced in the 1960s, and the station was renovated in the 2000s.

The 116th Street station contains two side platforms and three tracks; the center track is not used in regular service. The station was built with tile and mosaic decorations. The mezzanine above the platforms contains exits to 116th Street and Broadway, and the northbound platform contains an additional exit to 115th Street. The original section of the station is a New York City designated landmark and listed on the National Register of Historic Places.

History

Construction and opening

A view of the station in 1905

Planning for the city's first subway line dates to the Rapid Transit Act, authorized by the New York State Legislature in 1894.[8]:139–140 The subway plans were drawn up by a team of engineers led by William Barclay Parsons, chief engineer of the Rapid Transit Commission. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[7]:3 A plan was formally adopted in 1897, and legal challenges were resolved near the end of 1899.[8]:148 The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed Contract 1 with the Rapid Transit Commission in February 1900,[9] in which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[8]:182 In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[7]:4 Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[8]:182

The 116th Street station was constructed as part of the IRT's West Side Line (now the Broadway–Seventh Avenue Line) from 104th Street to 125th Street, for which construction began on June 18, 1900.[9] The section of the West Side Line around this station was originally planned as a two-track line, but in early 1901, was changed to a three-track structure to allow trains to be stored in the center track.[10]:93[11]:189–190 Construction on the section between 104th Street and 125th Street had already begun prior to the design change, requiring that a portion of the work be undone.[10]:240–241 A third track was added directly north of 96th Street, immediately east of the originally planned two tracks.[12]:14

The 116th Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway from City Hall to 145th Street on the West Side Branch.[8]:186[4] The opening of the first subway line, and particularly the 116th Street station, helped contribute to the development of Morningside Heights and Harlem.[2]:8

20th century

After the initial system was completed in 1908,[13] the station was served by West Side local and express trains. Express trains began at South Ferry in Manhattan or Atlantic Avenue in Brooklyn, and ended at 242nd Street in the Bronx. Local trains ran from City Hall to 242nd Street during rush hours, continuing south from City Hall to South Ferry at other times.[14] In 1918, the Broadway–Seventh Avenue Line opened south of Times Square–42nd Street, thereby dividing the original line into an "H" system. Local trains were sent to South Ferry, while express trains used the new Clark Street Tunnel to Brooklyn.[15]

In 1909, to address overcrowding, the New York Public Service Commission proposed lengthening platforms at stations along the original IRT subway.[16]:168 On January 18, 1910, a modification was made to Contracts 1 and 2 to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $41.2 million in 2019) spent on platform lengthening, $500,000 (equivalent to $13,719,643 in 2019) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[17]:15 The northbound platform at the 116th Street station was extended 130 feet (40 m) to the south,[17]:112 while the southbound platform was not lengthened.[17]:106 On January 24, 1911, ten-car express trains began running on the West Side Line.[16]:168[18] In conjunction with the platform lengthening, a new entrance was constructed to the northbound platform in 1912.[19] An entrance kiosk for the new staircase was taken from the 23rd Street and Fourth Avenue station and was installed in July 1913.[20]

In 1948, work was done to lengthen the platforms on the IRT Broadway–Seventh Avenue Line from 103rd Street to 238th Street, including at 116th Street, to 514 feet (157 m) to allow full ten-car express trains to stop. Previously, the station could accommodate six-car local trains, but ten-car trains could not open some of their doors. The platform extensions at these stations were opened in stages. On April 6, 1948, the platform extension at 116th Street opened.[21]:33 Simultaneously, the IRT routes were given numbered designations with the introduction of "R-type" rolling stock. The first such fleet, the R12, was put into service in 1948.[22] The Broadway/West Side route to 242nd Street became known as the 1.[23] In 1959, all 1 trains became local.[24]

The above-ground 116th Street entrance, 1910

Columbia University first requested the demolition of the station's original entrance in Broadway's median in 1954, ahead of its bicentennial.[25] Columbia brought up the issue again at a meeting of the New York City Board of Estimate in 1963,[26] after a student was killed while crossing the street.[25] The kiosk was seen as a safety hazard, with two deaths and several accidents occurring at the kiosk from 1962 to 1964. Sixty-eight hundred students and faculty members signed a petition to remove the kiosk in February 1964.[27] On March 13, 1964, the New York City Board of Estimate voted to allocate $600,000 (equivalent to $4,946,137 in 2019) to demolish the entrance and replace it with two new sidewalk entrances as part of the 1964–1965 City budget. The New York City Department of Highways had requested that funds be allocated to this project at the request of Columbia University. The New York City Transit Authority had not yet drawn up plans for the project.[26] Bids for the kiosk's demolition were initially scheduled to be solicited in July 1964.[28] That October, a NYCTA spokesperson announced that the demolition of the entrance would be delayed until the following spring. Work on the project had been expected to commence in December 1964. The NYCTA was expected to complete the design of the project in early 1965, after which the project could be put out for bids.[29]

On November 2, 1966, the New York City Planning Commission voted to grant an additional $300,000 (equivalent to $2,364,000 in 2019) for the project after the cost of the project was revised. The money for the project was reallocated within the Highway Department's budget.[30][31] It was estimated that following necessary approvals from the New York City Board of Estimate, bids on the project would be let on December 16, and work on the project would begin by the end of January 1967. Work on the project was set to be done in 22 months. In 1965, Columbia University and Barnard College had announced that they would each spend $5,000 (equivalent to $40,565 in 2019) to decorate the new entrances to fit in with their campuses.[32] Work on the project was completed in 1968.[33]

The station's downtown platform in 1978

In 1979, the New York City Landmarks Preservation Commission designated the space within the boundaries of the original station, excluding expansions made after 1904, as a city landmark. The station was designated along with eleven others on the original IRT.[7][34] In April 1988,[35] the NYCTA unveiled plans to speed up service on the Broadway–Seventh Avenue Line through the implementation of a skip-stop service: the 9 train.[36] When skip-stop service started on August 21, 1989, it was only implemented north of 137th Street–City College on weekdays, and 116th Street was served by both the 1 and the 9.[37][38][39]

In October 1988, the Metropolitan Transportation Authority (MTA) announced that the newsstand on the station's downtown platform would be removed as part of a citywide program to beautify stations and improve passenger flow. The agency began this program in late 1987. The owner of the newsstand was unsure of whether he would rebuild the stand as the cost of rebuilding it might have outweighed the benefits of reopening it. This newsstand was chosen for rebuilding as it was only 12 feet (3.7 m) away from a staircase.[40]

21st century

In June 2002, the MTA announced that ten subway stations citywide, including 103rd Street, 110th Street, 116th Street, 125th Street, and 231st Street on the IRT Broadway–Seventh Avenue Line, would receive renovations. As part of the project, fare control areas would be redesigned, flooring, and electrical and communication systems would be upgraded, and new lighting, public address systems and stairways would be installed. In addition, since 110th Street, 116th Street, and 125th Street had landmark status, historical elements would be replaced or restored, including wall tiles. At the ends of the station platforms at 103rd Street, 110th Street, and 116th Street, a small section of station wall, which would look identical to the existing station walls, would be added to provide space for scrubber rooms.[41][42] Work on the ten citywide renovation projects was estimated to cost almost $146 million, and was scheduled to start later that year, and be completed in April 2004, in time for the 100th anniversary of the station's opening, and the 250th anniversary of Columbia University.[43][44]

Columbia University contributed $1 million (equivalent to $1,389,834 in 2019) to the station renovation project after the MTA said it would have to put off the renovation projects in Manhattan due to funding issues. The university had also reached agreements to cover part of the costs of the station renovations at 103rd Street, 110th Street, and 125th Street.[45] As a condition of the funding allocation for the station renovation, the university wanted work on the project to be expedited. Residents of Morningside Heights approved of the renovation plans, but were concerned that the expedited repairs would come at the cost of damaging the stations' historic elements. The MTA was expected to decide whether preservation or speed would be prioritized in the station renovation projects by the end of 2002.[41]

At the 110th Street and 116th Street stations, local community activists opposed artwork that was planned to be commissioned through the MTA's Arts for Transit program. Though the proposed artwork was intended as a homage to the stations' history, the activists believed the art would damage the decorative tiling that dated from the stations' opening, and that the artwork would damage the landmark interiors of the stations.[45][46] The MTA had planned to install a small bronze subway track and train to be inlaid within the station walls surrounded by sepia-toned photographs of the neighborhood at 116th Street. In December 2002, Manhattan Community Board 7 voted in favor of the plan to include artwork from the MTA's Arts for Transit program at the 103rd Street station, which was not landmarked. Community Board 7 voted against the plan to include new artwork at the landmarked 110th Street and 116th Street stations, and the MTA dropped plans for the artwork at these stations.[44][45][47] The station renovation project at 116th Street began in January 2003.[41] From May 31 to July 12, 2003, the uptown platforms at the 116th Street and 103rd Street stations were closed at all times for their renovations.[48] The original interiors were listed on the National Register of Historic Places in 2004.[2] Skip-stop service ended on May 27, 2005.[49][50]

Station layout

G Street level Exit/entrance
M Mezzanine Fare control, station agent, MetroCard machines
P
Platform level
Side platform
Northbound local toward 242nd Street (125th Street)
Peak-direction express No regular service
Southbound local toward South Ferry (Cathedral Parkway–110th Street)
Side platform
Station mezzanine

This station has two side platforms and three tracks, the center one being an unused express track.[51] The platforms were originally 350 feet (110 m) long, as at other stations north of 96th Street,[7]:4[2]:3[52]:8 but as a result of the 1948 platform extension, became 520 feet (160 m) long.[21] The platform extensions are at the southern ends of the original platforms.[52]:39

Two staircases from each platform lead to a mezzanine above the platforms, which contains the fare control area. Outside fare control, the mezzanine connects to stairways on either side of Broadway.[2]:4

The southbound local track is technically known as BB1 while the northbound one is BB4; the BB designation is used for chaining purposes along the Broadway–Seventh Avenue Line from 96th Street to 242nd Street. Although it cannot be accessed at 116th Street–Columbia University, the center track is designated as M. These designations are rarely, if ever, used in ordinary conversation.[51]

Design

Name identification tablet
Faience plaque of the seal of Columbia University
Faience plaque of the number 116

As with other stations built as part of the original IRT, the tunnel is covered by a "U"-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than 4 inches (100 mm) thick.[2]:3–4[52]:9 Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The original platforms contain circular, cast-iron Doric-style columns spaced every 15 feet (4.6 m), while the platform extensions contain I-beam columns. Additional columns between the tracks, spaced every 5 feet (1.5 m), support the jack-arched concrete station roofs.[2]:3–4[7]:4[52]:9 There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.[52]:9 The ceiling is about 8 feet (2.4 m) above platform level in the southern part of the station, but is higher above the northern part, reaching 12 to 15 feet (3.7 to 4.6 m) above the platform.[2]:5

The walls along the platforms consist of a buff-colored brick wainscoting on the lowest part of the wall, and white glass tiles above. The platform walls are divided at 15-foot (4.6 m) intervals by blue tile pilasters, or vertical bands.[2]:4[7]:10 The pilasters are topped by alternating blue-and-cream faience plaques of the number "116" and the Columbia University seal; both of these motifs are surrounded by faience wreaths. The seal shows a seated woman with a book of knowledge in her hand and three children standing near her feet. A blue-and-green cornice, made of faience, runs atop the wall and around the mosaic tablets.[2]:4–5[7]:9–10 Mosaic wall tablets with the name "Columbia University" are installed along the platform walls.[2]:5[7]:10 The decorative work was performed by tile contractor John H. Parry and faience contractor Grueby Faience Company.[52]:39

Exits

Northwestern corner stairs

The station has four entrance/exit stairs that serve both platforms. One pair ascends to the northwest corner of Broadway and 116th Street, while the other pair goes to the northeast corner of the same intersection.[2]:3 There is also an exit-only staircase near the southern end of the northbound platform that leads to the east side of Broadway at 115th Street, outside the Alfred Lerner Hall.[53]

There was a station house in the median of Broadway, just north of 116th Street, which was designed by Heins & LaFarge and dated to the station's opening in 1904. It was built as one of several station houses on the original IRT; similar station houses were built at Atlantic Avenue, Bowling Green, Mott Avenue, 72nd Street, and 103rd Street.[54]:46[55]:2 The station house, which was identical to the one at 103rd Street, occupied an area of 50 by 20 feet (15.2 by 6.1 m). The one-story station house contained exterior walls made of buff brick, with a foundation made of granite blocks. A limestone string course ran atop the exterior wall. At the corners of the station house were limestone quoins, which supported a copper-and-terracotta gable roof facing west and east. The ridge of the station house's roof was a skylight made of glass and metal. The doorways were centrally located on the north and south walls of the control house, topped by terracotta finials and a rounded gable. There were terracotta crosses on each rounded gable with the number "116" embossed onto them. Above the doorway was a pediment and an arched window made of glass and wrought iron.[52]:12 The control house was closed and demolished in 1968.[33]

References

  1. "Borough of Manhattan, New York City". Government of New York City. Retrieved December 28, 2020.
  2. "New York MPS 116th Street—Columbia University Subway Station (IRT)". Records of the National Park Service, 1785 – 2006, Series: National Register of Historic Places and National Historic Landmarks Program Records, 2013 – 2017, Box: National Register of Historic Places and National Historic Landmarks Program Records: New York, ID: 75313889. National Archives.
  3. "Manhattan Bus Map" (PDF). Metropolitan Transportation Authority. July 2019. Retrieved December 1, 2020.
  4. "Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train". The New York Times. October 28, 1904. p. 1. ISSN 0362-4331. Retrieved April 21, 2020.
  5. "Station Developers' Information". Metropolitan Transportation Authority. Retrieved June 13, 2017.
  6. "Facts and Figures: Annual Subway Ridership 2014–2019". Metropolitan Transportation Authority. 2020. Retrieved May 26, 2020.
  7. "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Retrieved November 19, 2019.
  8. Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  9. Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  10. Report of the Board of Rapid Transit Railroad Commissioners For And In The City of New York Up to December 31, 1901. Board of Rapid Transit Railroad Commissioners. 1902.
  11. Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1909. New York State Public Service Commission. 1910.
  12. "New York City's Subway Turns 100" (PDF). The Bulletin. Electric Railroaders' Association. 47 (10). October 2004. Archived from the original (PDF) on April 3, 2018. Retrieved April 2, 2018.
  13. "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now". The New York Times. August 2, 1908. p. 10. Retrieved November 6, 2016.
  14. Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. 1916. p. 119.
  15. "Open New Subway Lines to Traffic; Called a Triumph" (PDF). The New York Times. August 2, 1918. p. 1. ISSN 0362-4331. Retrieved October 4, 2011.
  16. Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
  17. Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911.
  18. "Ten-car Trains in Subway to-day; New Service Begins on Lenox Av. Line and Will Be Extended to Broadway To-morrow". The New York Times. January 23, 1911. ISSN 0362-4331. Retrieved April 5, 2018.
  19. Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1912 Vol. I. New York State Public Service Commission. 1913. p. 161.
  20. Report of the Public Service Commission For The First District Of The State Of New York For The Year Ending December 31, 1913 Vol. I. New York State Public Service Commission. 1914. p. 153.
  21. Report for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949. hdl:2027/mdp.39015023094926.
  22. Brown, Nicole (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious". amNewYork. Retrieved January 27, 2021.
  23. Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960). "A Summary of Services on the IRT Division, NYCTA" (PDF). New York Division Bulletin. Electric Railroaders' Association. 3 (1): 2.
  24. "Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side Changes Take Effect". The New York Times. February 7, 1959. p. 21. Retrieved November 6, 2016.
  25. "Removal of Kiosk In Columbia Area Proposed by City". The New York Times. December 4, 1963. ISSN 0362-4331. Retrieved January 11, 2021.
  26. Spiegel, David S. (March 16, 1964). "New York Board of Estimate Votes Kiosk Removal Funds". Columbia Daily Spectator. Retrieved January 5, 2021.
  27. "Ask New Kiosk Sites". New York Daily News. February 23, 1964. p. 29. Retrieved January 1, 2021 via newspapers.com .
  28. "IRT Bids to Be Let". The New York Times. June 10, 1964. ISSN 0362-4331. Retrieved January 11, 2021.
  29. "City to Raze Subway Kiosk During Spring Contractors will Submit Bids Early Next Year". Columbia Daily Spectator. October 6, 1964. Retrieved January 5, 2021.
  30. Bennett, Charles G. (November 3, 1966). "2 Renewal Areas Chosen Under New Policy; Harlem and Brooklyn Sites Approved by Planning Agency Funds for Removing Kiosk at Columbia to Be Increased". The New York Times. ISSN 0362-4331. Retrieved January 11, 2021.
  31. "Kiosk Work to Start in 2 Months". Columbia Daily Spectator. December 13, 1966. Retrieved January 5, 2021.
  32. Heim, Dave (November 3, 1966). "Predict February Demolition of 116th Street Subway Kiosk". Columbia Daily Spectator. Retrieved January 4, 2020.
  33. Stern, Robert A. M.; Mellins, Thomas; Fishman, David (1995). New York 1960: Architecture and Urbanism Between the Second World War and the Bicentennial. New York: Monacelli Press. p. 1122. ISBN 1-885254-02-4. OCLC 32159240.
  34. "12 IRT Subway Stops Get Landmark Status". The New York Times. October 27, 1979. ISSN 0362-4331. Retrieved December 26, 2020.
  35. Brozan, Nadine (June 4, 1989). "'Skip-Stop' Subway Plan Annoys No. 1 Riders". The New York Times. ISSN 0362-4331. Retrieved June 15, 2016.
  36. Moore, Keith (June 10, 1988). "TA's skip-stop plan hit". New York Daily News. Retrieved November 8, 2018.
  37. "#1 Riders: Your Service is Changing". New York Daily News. August 20, 1989. Retrieved November 8, 2018.
  38. "Announcing 1 and 9 Skip-Stop Service on the Broadway-Seventh Avenue Line" (PDF). New York City Transit Authority. August 1989. Archived from the original (PDF) on June 26, 2020. Retrieved August 1, 2009.
  39. Lorch, Donatella (August 22, 1989). "New Service For Subways On West Side". The New York Times. ISSN 0362-4331. Retrieved June 15, 2016.
  40. Sparks, Cory (October 24, 1988). "MTA slates subway stand for removal". Columbia Daily Spectator. Retrieved January 5, 2021.
  41. Nowakowski, Xan (September 11, 2002). "Columbia Invests in Area Subway Stations". Columbia Daily Spectator. Retrieved January 5, 2021.
  42. Homans, Charlie (February 6, 2003). "CB7 Rejects MTA's Arts For Transit Proposition". Columbia Daily Spectator. Retrieved January 5, 2021.
  43. Donohue, Pete (June 11, 2002). "Renovation Is Set For 10 Subway Stations". New York Daily News. Retrieved January 8, 2018.
  44. Angara, Harini (January 23, 2004). "116th Subway Station Gets a Face Lift". Columbia Spectator. Retrieved January 5, 2021.
  45. Homans, Charlie (January 24, 2003). "Tunnel Vision: MTA, Locals Don't See Eye to Eye". Columbia Daily Spectator. Retrieved January 5, 2021.
  46. Kennedy, Randy (January 10, 2003). "Plan to Renovate Stations Draws Ire". The New York Times. ISSN 0362-4331. Retrieved January 10, 2021.
  47. Angara, Harini (January 23, 2004). "116th Subway Station Gets a Face Lift". Columbia Spectator. Retrieved January 5, 2021.
  48. "1 9 Uptown Platforms at 103 St. and 116 St. will be closed". Columbia Daily Spectator. May 28, 2003. Retrieved January 5, 2021.
  49. Chan, Sewell (May 25, 2005). "On Its Last Wheels, No. 9 Line Is Vanishing on Signs". The New York Times. ISSN 0362-4331. Retrieved August 29, 2016.
  50. "Noteworthy – 9 discontinued". mta.info. Metropolitan Transportation Authority. May 7, 2005. Archived from the original on May 7, 2005. Retrieved September 18, 2016.
  51. Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 via Google Books.
  52. Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412). Retrieved December 20, 2020. This article incorporates text from this source, which is in the public domain.
  53. "116th Street—Columbia University Neighborhood Map". mta.info. Metropolitan Transportation Authority. April 2018. Retrieved January 5, 2021.
  54. Stern, Robert A. M.; Gilmartin, Gregory; Massengale, John Montague (1983). New York 1900: Metropolitan Architecture and Urbanism, 1890-1915. New York: Rizzoli. ISBN 0-8478-0511-5. OCLC 9829395.
  55. "Interborough Rapid Transit System, 72nd Street Control House" (PDF). New York City Landmarks Preservation Commission. January 9, 1979. Retrieved November 19, 2019.

Further reading

  • Stookey, Lee (1994). Subway ceramics : a history and iconography of mosaic and bas relief signs and plaques in the New York City subway system. Brattleboro, Vt: L. Stookey. ISBN 978-0-9635486-1-0. OCLC 31901471.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.