Sequalitchew Creek

Sequalitchew Creek, located in DuPont, Washington emanates from Sequalitchew Lake, Fort Lewis, Washington, was the location of the original Fort Nisqually trading post established in 1833 by the Hudson's Bay Company. The historic, natural flow of Sequalitchew Creek runs from Sequalitchew Lake, through Edmonds Marsh, down the canyon and out to the Puget Sound.[1][2]

Sequalitchew Creek
Sequalitchew Creek, lower canyon
Location of the mouth of Sequalitchew Creek in Washington
Sequalitchew Creek (the United States)
Physical characteristics
Source 
  locationSequalitchew Lake
Mouth 
  location
DuPont Warf, Nisqually Reach
Length38.4 mi (61.8 km)
Discharge 
  average812,500 US gallons per day (1.2571 cu ft/s; 0.03560 m3/s)
Basin features
WatershedChambers-Clover Watershed

History

Methodist Episcopal Mission marker at Sequalitchew Creek, N47 06 30.5, W122 38 57.7, WGS 84
  • In 1832 the area that became Fort Nisqually was sited by Hudson's Bay Company's chief trader, Archibald McDonald. In cooperation with the Nisqually people, a storehouse for blankets, seeds, and potatoes was built at the mouth of Sequalitchew Creek.
  • 1839 Nisqually Methodist Episcopal Mission was established, bringing the first U.S. citizens into the Puget Sound region near the creek canyon.
  • 1841 Wilkes U.S. Exploring Expedition set up an observatory on the bluff near the creek to survey, map and chart the waters of Puget Sound. They joined the Americans at the mission to hold the first Fourth of July celebration west of the Mississippi River.
  • 1843 Second Fort Nisqually. Business became mainly agricultural, and the fort was relocated on a flat-plains area near the banks of Sequalitchew Creek.
  • 1904 First joint Army-National Guard training exercises on west coast were held. The massive encampment near Sequalitchew Creek included the “Buffalo Soldiers” of the 9th Cavalry.[3]

In 1959 and 1960, Sequalitchew Lake was utilized by the Washington Department of Fisheries as a fish farm that reared and released coho salmon to Sequalitchew Creek. From 1976 until the mid-1990s the Washington Department of Fisheries operated a coho salmon fish hatchery and rearing facility on Sequalitchew Lake. In the past, Native Americans caught from 3,500 to 4,000 fish annually in Sequalitchew Creek.

Course

Sequalitchew Creek Beach

The total drainage basin of the Creek encompasses 38.4 square miles (99 km2). This watershed begins at Kinsey Marsh, draining via Murray Creek into American Lake. Seasonal overflow from American Lake feeds Sequalitchew Lake. The water level of both lakes is maintained year-round by springs and water table seepage. A diversion dam, built by Fort Lewis around 1950, lies near the headwaters of the Creek. The dam drains through a canal that originates in Hamer Marsh, east of the Creek. Just south of Sequalitchew Lake, the canal passes under the Creek through a series of complicated culverts. It continues west for one mile (1.6 km), and turns north to empty into Puget Sound at Tatsolo Point, off Steilacoom-DuPont Road, DuPont. The creek bed still carries water, in the form of ground water runoff, down the same historic creek path, finally emptying into the Puget Sound.

Sequalitchew Beach and railroad tracks

Creek trail and beach

The area can be traversed on an old narrow gauge railway roadbed that ran from the DuPont Company area to Puget Sound. The trail leads to Sequalitchew beach. The creek corridor is used by hundreds of species, including eagles, hawks, song birds, herons, ducks, owls, frogs, salamanders, snakes, beaver, raccoons, coyotes, deer, and rabbits.[1][4] The waters off Sequalitchew Beach are inhabited by harbor seal and gray whale.[4]

Proposed mining expansion

A proposed 177-acre (0.72 km2) expansion of Glacier Northwest's (recently renamed as Cal-Portland, previously known as Lone Star Gravel) existing gravel mine will involve the removal of 184 acres (0.74 km2) of forest and topsoil surrounding Sequalitchew Creek. If allowed, it will create a 550-acre (2.2 km2) hole in the underlying gravel as 40 million tons of gravel is extracted over the next 14 years. The pit will be 80 feet (24 m) deep and expose the underlying Vashon Aquifer. The flow from this exposed aquifer (estimated at approximately 6.5 million gallons per day) will be directed down a man made ditch to Sequalitchew Creek with a flow eight times that of present Sequalitchew Creek. The dewatering of the aquifer will lower the groundwater level in the vicinity by as much as 30 feet (9.1 m), thereby draining nearby Edmonds Marsh, a Class I wetland.[5][6][7] Nearby Pond Lake, McKay Marsh, Bell Marsh and Hammer Marsh will be adversely affected.[8]

DuPont staff recommendation

On January 16, 2009, Bill Kingman, DuPont Planning Department signed on behalf of the City of DuPont to accept the proposed mining expansion as follows, (directly quoting):

Approval of expansion of the aggregate mine into the area proposed is recommended, but with conditions that change some of the characteristics of the proposal.

This approval would include:

  1. Expansion of aggregate removal throughout the 177 acres (0.72 km2) proposed would be allowed.
  2. Groundwater aquifer dewatering to lower the water table for access to additional aggregate would be allowed. This initially would be accomplished through interceptor wells. In the long term, construction of a portion of the proposed new North Sequalitchew Creek channel would permanently intercept groundwater and discharge to the existing Sequalitchew Creek.
  3. Mitigation for potential groundwater aquifer drawdown impacts on Edmond Marsh would be accomplished by replacing invasive vegetation by native vegetation that will result in equal or greater wetland function and values.
  4. Removal of the “Kettle Wetland” would be allowed with mitigation consisting of creation of replacement wetlands that may be located adjacent to the proposed new North Sequalitchew Creek channel.
  5. Displacement of wetland functions at the Seep and Riparian Forest wetlands adjacent to Sequalitchew Creek due to interception of groundwater from the excavation for aggregate removal would be approved with mitigation consisting of replacement wetlands.
  6. The conditions of approval would not allow the excavation of the north side of the existing Sequalitchew Creek ravine but would, instead, require installation of a bored pipeline approximately 500 feet (150 m) long.[9]

Glacier Northwest's current Conditional Use Permit to expand the mine, and dewater the aquifer and creek violates the 1994 Settlement Agreement as established by the Nisqually Delta Association. DuPont Municipal Code specifically protects wetlands.[10] Although a signatory, the city of DuPont ignored the '94 agreement and their own municipal code and did not discourage Glacier from applying to expand their mining extraction.[5] In accordance with the '94 Agreement, parties are now meeting regularly to determine next steps.[7]

Sequalitchew Village

City of DuPont's 2008 Draft Comprehensive Land Use Plan, p. 47 describes future use of the mining area, Sequalitchew Creek and dewatering of the aquifer to include total build out of approximately 2,138 residences. The proposed neighborhood would be named Sequalitchew Village.[11]

Memorandum of Understanding

A Memorandum of Understanding has been crafted regarding the supplemental review process for Glacier NW's mining expansion at Sequalitchew Creek.[12] The document was introduced to the council at their October 13, 2009 meeting, to be signed and approved. Several council members expressed concern about lack of public review. Public review and comment is currently being solicited, after which the document will then be again considered at the November 10, 2009 meeting.

Fauna

In a 1982 Weyerhaueser environmental impact statement, the following vertebrate species were found in the creek:[13]

Fish

Birds

Mammals

Reptials and amphibians

Footnotes

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.