List of megaprojects
This is a list of megaprojects. The number of such projects is so large that the list may never be fully completed.
Legend
Terms used in the Status Column | Status Color |
---|---|
Proposed | |
In Planning, Approved, Under/In Development, Under Construction, Re-Construction In Progress, Nearly Complete | |
On Hold | |
Abandoned, Cancelled | |
Completed |
Definitions
Megaprojects may be defined as:
- Projects that cost more than US$1 billion and attract a large amount of public attention because of substantial impacts on communities, environment, and budgets.
- Projects can also be "initiatives that are physical, very expensive, and public".[1]
Megaprojects require care in the project development process to reduce any possible optimism bias and strategic misrepresentation. Examples of megaprojects include bridges, tunnels, highways, railways, airports, seaports, power plants, dams, wastewater projects, Special Economic Zones (SEZ), oil and natural gas extraction projects, public buildings, information technology systems, aerospace projects, and weapons systems.
This list identifies a wide variety of examples of major historic and contemporary projects that meet one or both megaproject criteria identified above.
Aerospace projects
- Airbus A380, a double-deck, wide-body, four-engine jet airliner manufactured by Airbus.
- Antonov An-225 is the longest and heaviest aircraft in service. Only one unit was ever completed.
- Boeing B-29 Superfortress, the first nuclear bomber, which cost 50% more than the development of the bombs in the Manhattan Project.
- Boeing B-52 Stratofortress, with six decades of service as a strategic nuclear bomber, it is one of the largest military aircraft ever built. Every other bomber produced in the US after the B-52 have been megaprojects; however, it has not been replaced nor will it be in the foreseeable future.
- Boeing 2707 and Lockheed L-2000 supersonic aircraft projects, initiated in 1963 via a US government-funded competition to build the United States' first Supersonic Transport (SST), prototypes never built, ultimately canceled due to political, environmental and economic reasons in 1971.
- Boeing 747, a wide-body commercial airliner first produced in 1970, often referred to by the nickname Jumbo Jet,[2][3] is among the world's most recognizable aircraft with uses for long-distance passenger transport, cargo, the US President's official shuttle plane, and as NASA's Shuttle Carrier Aircraft.
- Boeing 787, made in the United States with local and globally sourced parts, is the first major aircraft to be made largely out of composite materials.[4]
- Concorde, a supersonic passenger airliner, a product of an Anglo-French government treaty that combined the manufacturing efforts of Aérospatiale and the British Aircraft Corporation, first flown in 1969, Concorde entered service in 1976 and continued commercial flights for twenty-seven years.
- Convair B-58 Hustler, an all-weather, high altitude supersonic bomber with a fixed delta wing and 4 engines. The Hustler was operational from 1960 to 1970 in the US Air Force's Strategic Air Command for the deployment of up to 5 gravity nuclear weapons.
- Lockheed C-5 Galaxy was the largest and heaviest aircraft of any kind for over a decade (1970 to 1982). This military cargo plane has the dubious distinction of being the first development program with a billion dollar cost overrun.[5][6]
- F-22 Raptor, a single seat, twin-engine fifth-generation fighter manufactured by Lockheed Martin that uses stealth technology.
- F-35 Lightning II, a single seat, single engine, all-weather stealth multirole combat aircraft that is intended to perform both air superiority and strike missions.
- Sukhoi Su-57/HAL FGFA, two variants of fifth-generation stealth fighters jointly being developed by Sukhoi and Hindustan Aeronautics Limited for the Russian and the Indian Air Forces as a combined effort by Russia and India.
- Northrop Grumman B-2 Spirit, also known as the Stealth Bomber, a US heavy bomber with "low observable" stealth. Total program cost including development, engineering, and testing averaged $2.1 billion per aircraft in 1997.[7]
- KH-11 reconnaissance satellite, manufactured by Lockheed Corporation and launched between 1976 and 1990.
- Rockwell B-1 Lancer, a supersonic bomber with a variable-sweep wing built in the 1980s as a strategic bomber. It has since acquired conventional and multi-role capabilities.
- Tupolev Tu-144, the first supersonic transport aircraft, made by the Russian aircraft company Tupolev, first flown on 31 December 1968 and entered service on 26 December 1975.
- Tupolev Tu-160, the world's largest and heaviest combat aircraft, the world's largest supersonic aircraft, and the largest variable-sweep aircraft ever built. (The North American XB-70 Valkyrie had a higher empty weight and maximum speed but never entered production.)
Disaster cleanup
While most megaprojects are planned and undertaken with careful forethought, some are undertaken out of necessity after a natural disaster occurs. There have also been a few man-made disasters.
- The Chernobyl New Safe Confinement was built to enclose the #4 reactor that was destroyed in the Chernobyl disaster of 1986 (completed summer 2019[8][9])
- The Fukushima disaster cleanup is ongoing, and includes the removal of spent nuclear fuel stored at the site of the 2011 Fukushima Daiichi nuclear disaster.
- Cleaning up the Deepwater Horizon oil spill, Exxon Valdez oil spill, and AZF chemical factory explosion were megaprojects.
- Storing nuclear waste at Yucca Mountain nuclear waste repository is designed to prevent a disaster from leaking nuclear waste.
- Many hurricanes and typhoons have caused extensive damage and required large cleanup efforts, the largest of which included projects that targeted the damaged infrastructure. The list of costliest Atlantic hurricanes covers the ones in the Atlantic region, including Hurricane Katrina from 2005.
- Many earthquakes (and resultant tsunamis) have caused enough damage to infrastructure that enormous projects were undertaken. The 1994 Northridge earthquake, the 2004 Indian Ocean earthquake and tsunami, and the 2011 Tōhoku earthquake and tsunami are some of the most notorious and recent events that led to a megaproject.
- Flooding is the cause of many disasters. Some have caused enough damage that a megaproject would be used to recover. The Great Mississippi Flood of 1927 and the 2011 Mississippi River floods are examples.
- The cleanup and recovery from the 1980 eruption of Mount St. Helens in rural Washington state was of megaproject proportions.
- The rescue and recovery effort after the September 11 attacks on the World Trade Center.
- Major restoration was necessary after the destruction caused by World War I and II, some of which was paid for by German reparations for World War I and for World War II.
Energy projects
- Boundary Dam Power Station, the world's first large-scale, coal-fired Carbon Capture & Storage plant.[10]
- Olkiluoto 3, a nuclear power-plant in Eurajoki, Finland, planned to be completed in 2021.[11]
- Kemper Project, or Kemper County Energy Facility, is the world's first construction attempt of an Integrated Gasification Combined Cycle plant with Carbon Capture & Sequestration.[12] However, after significant delays and cost overruns, the gasification process is currently suspended and the power plant runs just on regular natural gas.
- The Panamanian Natural Gas electric power plant is a project with an investment of 1.15 billion US dollars located in Colon province. It is also meant as a port for supplying Natural Gas to other Central American countries.[13]
- Tres Amigas SuperStation, an interconnection to connect the Eastern Interconnection to the Western Interconnection and the Texas Interconnection.This will effectively connect nearly all electrical grids in North America.
- Three Gorges Dam, the largest hydro-electric facility in the world.
- Virgil C. Summer Nuclear Generating Station, was a project to construct some of the first new nuclear units in the United States in over 30 years, at an existing nuclear power plant in Jenkinsville, South Carolina. The project was cancelled and all work stopped in July 2017.[14]
- Vogtle Electric Generating Plant, is a project to construct two new nuclear units at an existing nuclear power plant in Waynesboro, Georgia.
- Australia–ASEAN Power Link, a proposed electricity infrastructure project that is planned to include the world's largest solar plant, the world's largest battery, and the world's longest submarine power cable.Current estimates place construction costs at A$16 Billion.
Name | Capacity (MW) |
Location | Year Completed |
---|---|---|---|
Bhadla Solar Park | 2,245 | Rajasthan, India | 2020[15][16][17] |
Pavagada Solar Park | 2,245 | Karnataka, India | 2019[18][19] |
Tengger Desert Solar Park | 1,547 | Ningxia, China | 2016[20][21] |
Benban Solar Park | 1,500 | Egypt | 2019 |
Noor Abu Dhabi | 1,177 | United Arab Emirates | 2019[22] |
Name | Capacity (MW) |
Location | Notes |
---|---|---|---|
Quaid-e-Azam Solar Park | 1000 | Bahawalpur, Pakistan | Phase-1 of 100 MW Operational since 2015. other under construction. |
Ivanpah Solar Power Facility | 392 | Mojave Desert, California, USA | Operational since February 2014. Located southwest of Las Vegas. |
Solar Energy Generating Systems | 354 | Mojave Desert, California, USA | Commissioned between 1984 and 1991. Collection of 9 units. |
Mojave Solar Project | 280 | Barstow, California, USA | Completed December 2014 |
Solana Generating Station | 280 | Gila Bend, Arizona, USA | Completed October 2013 Includes a 6h thermal energy storage |
Genesis Solar Energy Project | 250 | Blythe, California, USA | Completed April 2014 |
Science projects
- Atacama Large Millimeter Array
- Copernicus programme, €8.4 Billion European satellite project for global, total and permanent Earth observations.
- COVID-19 vaccine
- Deep Underground Neutrino Experiment (in work) Long Baseline Neutrino Facility
- Envisat, an Earth observation satellite of European Space Agency (2002–2012)
- European Spallation Source, strongest ever spallation source for advanced and new material research development.
- European X-ray free electron laser, used for material research (since 2017).
- Extreme Light Infrastructure, European centers for the most intense lasers (under construction)
- Extremely Large Telescope, world's largest optical to mid infrared telescope (under construction)
- Facility for Antiproton and Ion Research, in Germany (2012–)[23]
- Five hundred meter Aperture Spherical Telescope (FAST), the world's largest static/semi-static radio telescope measuring 500 meters across located in Guizhou Province, People's Republic of China.
- Giant Magellan Telescope, a large ground-based optical and near infrared telescope (under construction)
- Human Genome Project, investigation to determine human genetic sequence (1990–2003) – cost $14.5bn, but generated an output of $965bn, personal income exceeding $293bn and more than 4.3 million job-years of employment.[24]
- India-based Neutrino Observatory (under construction)
- ITER, International nuclear fusion project, in France (under construction) at a cost of $20bn.
- Large Hadron Collider, a 13 TeV CERN particle accelerator, in Switzerland and France (2000-ongoing)[25]
- Advanced LIGO, a large-scale physics experiment and observatory to measure gravitational waves, with total cost more than US$1 billion.[26]
- Manhattan Project, in the United States (1945) – 30bn in 2012 dollars[27]
- Materials Genome Initiative, an advanced manufacturing partnership[28]
- MYRRHA, prototype of an accelerator-driven system to transmute nuclear waste.
- National Ignition Facility, United States nuclear fusion project (1997-ongoing)
- Ocean Networks Canada cabled Observatories. Largest underwater observatories, providing 24/7 access to hundreds of instruments in the Pacific Ocean and the Salish Sea (2005–)
- Square Kilometre Array in South Africa (planned)
- Superconducting Super Collider, canceled 40 TeV particle accelerator in Texas (1991–1993)
- Tevatron 1 TeV particle accelerator, in the United States (1983–2011)
- Thirty Meter Telescope, a large optical and near infrared telescope (under construction)
- Very Large Array, a radio astronomy observatory in the US
- Wendelstein 7-X, an experimental stellarator (nuclear fusion reactor) in Greifswald, Germany.
Spacecraft
- Advanced Telescope for High Energy Astrophysics, a planned X-ray telescope being developed by ESA which will launch in 2028.
- Cassini–Huygens, a joint NASA/ESA/ASI spacecraft mission studying the planet Saturn and its many natural satellites since 2004. The total cost of this project is about $3.26 billion.[29]
- Chandrayaan program, a lunar exploration program of ISRO of India.
- Chang'e 1 to Chang'e 6, a series of lunar exploration spacecraft sent by People's Republic of China for their lunar exploration program, equipped with landers, orbiters and rover. It will for the first time in history explore the 'dark-side' of the Moon.
- Compass navigation system, an independent system of satellite navigation by People's Republic of China (Est. 2015–2017)
- Europa Clipper, an interplanetary mission in development by NASA to study Jupiter's moon Europa. (2022–)
- Gaia spacecraft, an ESA mission to create a 3D map of local Milky Way. ($1 billion,[30] since 2013)
- Galileo Navigation Satellite System, a European Union and European Space Agency global satellite navigation system, €5 billion[31] (since 2016)
- Galileo spacecraft, a mission to Jupiter (1989–2003) ($1.5 billion as 2003.[32][33])
- Global Positioning System, a global satellite navigation system created by the United States Department of Defense, $21.7 billion or more[34] (since 1973)
- GLONASS, the Russian global navigation satellite system (since 1982)
- Herschel Space Observatory, ESA space observatory sensitive to the far infrared and submillimetre bands (€1.1 billion[35])
- Hubble Space Telescope, an optical telescope orbiting in low Earth orbit, $10 billion (1978–)
- International Space Station, multinational space station in low Earth orbit (1998–), 150bn in 2010 dollars[36]
- James Webb Space Telescope (under construction, cost $8.8 billion in 2013[37])
- Juno spacecraft, a NASA New Frontiers mission to the planet Jupiter (2011– )
- Jupiter Icy Moon Explorer, a planned mission to Jupiter (Est. 2022)
- Laser Interferometer Space Antenna, an L3 class mission by ESA designed to detect and accurately measure gravitational waves.
- Lunokhod ("Moonwalker"), was a series of Soviet robotic lunar rovers designed to land on the Moon between 1969 and 1977. Lunokhod 1 was the first roving remote-controlled robot to land on another world.
- Mars program was a series of unmanned spacecraft launched by the Soviet Union between 1960 and 1973. The spacecraft were intended to explore Mars, and included flyby probes, landers and orbiters.
- Mars Science Laboratory (with Curiosity rover), $2.5 billion[38]
- Mars 2020, a Mars rover mission by NASA's Mars Exploration Program, launched 30 July 2020.
- Mir, Russian space station in low Earth orbit (1986–2001).
- Nancy Grace Roman Space Telescope, a planned wide field infrared space telescope by NASA.
- NAVIC, the Indian equivalent of GPS developed by ISRO.
- Orion spacecraft, a planned spacecraft that is being built by Lockheed Martin for NASA.
- Planck spacecraft, an ESA's mission to measure the cosmic microwave background.
- Venera (Venus) series space probes were developed by the Soviet Union between 1961 and 1984 to gather data from Venus. Venera 7 became the first spacecraft to land on Venus and first to transmit data from there back to Earth.
- Sutherland Spaceport, a planned space port in the north of Scotland
Other spaceflight projects
- Alpha Magnetic Spectrometer, a $2 billion particle physics experiment module that is mounted on the International Space Station since 2011[39]
- Apollo program (1960–1975), as a centerpiece of the US Space Program, culminated in manned exploratory missions to the Moon, $203.4 billion in 2015 dollars[40]
- Ariane, a family of European launch vehicles; the most recent development is Ariane 6
- Avatar RLV, Indian version of the Space Shuttle, being developed by the DRDO and ISRO.
- Baikonur Cosmodrome is the world's first and largest operational space launch facility. It was originally built by the Soviet Union in the late 1950s as the base of operations for the Soviet space program.
- Buran program, canceled Soviet version of the Space Shuttle (1980–1993)
- Constellation program, canceled planned moon landing spacecraft and space shuttle replacement, part lives on as future Crew Escape Vehicle for ISS (2005–2010)
- SpaceX Mars transportation infrastructure, a privately funded spaceflight system capable of enabling human settlements on Mars (2016– )
- Kennedy Space Center, the main spaceport for US manned space flight, located in Cape Canaveral, Florida.
- Shenzhou program, Chinese human spaceflight program (since 1992)
- Soyuz program, Soviet/Russian human spaceflight program (since 1966)
- Soviet Moonshot, canceled Moon landing program (1962–1969)
- Space Launch System, an American Space Shuttle-derived heavy expendable launch vehicle (2011– )
- Space Shuttle program (1972–2011), low Earth orbiters designed as manned cargo vessels that could be reused after each spaceflight and landed like a glider, $203.6 billion in 2015 dollars[41]
- Vostochny Cosmodrome ("Eastern Spaceport") is a Russian spaceport on the 51st parallel north in the Amur Oblast, in the Russian Far East.
- Vostok program, Soviet program to put the first man in space (1959–1963)
Sports and culture projects
Every Olympic Games and FIFA World Cup in the latter part of the twentieth century and entering into the 21st century has cost more than $1 billion in arenas, hotels etc., usually several billions.
Olympic Games
- See Cost of the Olympic Games—Note: Some values here are not shown on the other list due to research, which needs verification. The costs listed here were converted to US Dollars at the time of the games.
Major League Baseball (MLB)
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Globe Life Field | Arlington, Texas | Completed | $1,100,000,000 | This retractable-roof stadium opened in 2020 as the new home of the Texas Rangers.[42] |
Yankee Stadium | New York City (Bronx), New York | Completed | $2,309,000,000 ($2.75 billion in 2019 dollars[43]) | This open-air stadium opened in 2009 as the replacement for the New York Yankees' original Yankee Stadium.[44] It has since become home to a Major League Soccer team, New York City FC. |
National Basketball Association (NBA)
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Barclays Center | Brooklyn, New York | Completed | $1,000,000,000 ($1.11 billion in 2019 dollars[43]) | Opened in 2012 as the new home of the Brooklyn Nets. Also served as full-time or part-time home of the NHL's New York Islanders from 2015 to 2020.[45] |
National Football League (NFL)
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Allegiant Stadium | Paradise, Nevada | Completed | $1,900,000,000 | This domed stadium opened in 2020 as home to the Las Vegas Raiders as well as a local college team, the UNLV Rebels.[46] |
AT&T Stadium | Arlington, Texas | Completed | $1,300,000,000 ($1.55 billion in 2019 dollars[43]) | A retractable-roof stadium that opened in 2009 as the new home of the Dallas Cowboys. It also hosts other major events, most notably the Big 12 Championship Game and Cotton Bowl Classic in college football.[47] |
Levi's Stadium | Santa Clara, California | Completed | $1,300,000,000 ($1.4 billion in 2019 dollars[43]) | An open-air stadium that opened in 2014 as the new home of the San Francisco 49ers.[48] |
Mercedes-Benz Stadium | Atlanta, Georgia | Completed | $1,600,000,000 ($1.67 billion in 2019 dollars[43]) | A retractable-roof stadium that opened in 2017 as the new home of the Atlanta Falcons, as well as Atlanta United FC of Major League Soccer. |
MetLife Stadium | East Rutherford, New Jersey | Completed | $1,600,000,000 ($1.88 billion in 2019 dollars[43]) | An open-air stadium that opened in 2011 as the new home of two NFL teams, the New York Giants and New York Jets. |
SoFi Stadium | Inglewood, California | Completed | $4,900,000,000 | This domed stadium opened in 2020 as home to two NFL teams, the Los Angeles Rams (which own the stadium) and Los Angeles Chargers.[49] |
U.S. Bank Stadium | Minneapolis, Minnesota | Completed | $1,061,000,000 ($1.13 billion in 2019 dollars[43]) | A domed stadium that opened in 2016 as the new home of the Minnesota Vikings.[50] |
National Hockey League (NHL)
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
UBS Arena | Elmont, Nassau County, New York | Under Construction | $1,000,000,000 | Construction of this new arena started in 2019 and completion is expected sometime in 2021. This new multi-use arena is being designed to handle 18,000 seats to host New York Islanders home games.[51] This new arena will also include other multi-use functions. |
Chinese megaprojects
Project | City, Province | Status | Cost (local currency) | Cost (USD) | Notes |
---|---|---|---|---|---|
Guangzhou Evergrande Football Stadium | Guangzhou, Guangdong | Under Construction | ¥12,000,000,000 | $1,700,000,000 | Construction on this 100,000-seat football (soccer) stadium, the future home of Guangzhou Evergrande Taobao F.C. of the Chinese Super League, began in April 2020 and is scheduled to be complete in 2022.[52] |
UK megaprojects
Project | City | Status | Cost (local currency) | Cost (USD) | Notes |
---|---|---|---|---|---|
Tottenham Hotspur Stadium | London, England | Completed | £850,000,000 | $1,120,000,000[lower-alpha 1] | Opened in 2019 as the new home of Tottenham Hotspur F.C. Also designed to host American football games in the NFL International Series.[53] |
Wembley Stadium | London, England | Completed | £798,000,000 (£1.12 billion in 2019 pounds[54]) | $1,564,000,000[lower-alpha 2] | Opened in 2007 as the new home of the England national football team; also designed to host many other large events.[55] |
- Based on conversion rate of $1.32 per pound on the stadium's opening date of 3 April 2019; rounded to nearest $1 million.
- Based on conversion rate of $1.96 per pound on the stadium's opening date of 9 March 2007; rounded to nearest $1 million.
Roads and transport infrastructure
Ground transportation systems like roads, tunnels, bridges, terminals, railways, and mass transit systems are often megaprojects. Numerous large airports and terminals used for airborne passenger and cargo transportation are built as megaprojects.
West Africa
Nigeria
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Abuja Light Rail | Abuja, FCT | Under Construction | $2,650,000,000 | The Abuja Light Rail project is a light rail transport system that is underway in Abuja in Federal Capital Territory. The first phase of the project connects the city centre to Nnamdi Azikiwe International Airport, stopping at the Lagos–Kano Standard Gauge Railway station in Idu. The first 12 stations opened in July 2018.[56] The first phase of the project cost $824 million, while the second phase will be costing $1.79 billion.[58] |
Fourth Mainland Bridge | Ikorodu to Lekki, Lagos State | Under Development | $4,200,000,000 | The fourth mainland bridge will join three other bridges connecting the Island of Lagos to the mainland. The 38 km bridge and expressway will become the longest bridge and expressway in the world when completed.[59] |
Lagos–Calabar Railway | From Lagos, Lagos to Calabar, Cross River | Under Development | $11,920,000,000 | The Lagos–Calabar Railway is a planned standard gauge railway that will run from Lagos through to Calabar. The first phase of the project (Calabar-Port Harcourt) is expected to be completed by 2018. The total length of the rail will be 1,402 kilometres.[60] |
Lagos–Kano Standard Gauge Railway | From Lagos, Lagos to Kano, Kano State | Under Construction | $8,300,000,000 | The Lagos–Kano Standard Gauge Railway is a standard gauge railway across Nigeria, from the port of Lagos to Kano, near the Niger border. The railway will run parallel to the British-built Cape gauge line, which has a lower design capacity and is in a deteriorated condition. The Abuja-Kaduna route is completed and operational, whilst the Lagos-Ibadan route is underconstruction, and several other routes are underdevelopment. The total length of the rail will be 2,733 kilometres.[61] |
Lagos Rail Mass Transit | Lagos, Lagos | Under Construction | $3,600,000,000 | The Lagos Rail Mass Transit is an urban rail system being developed and under construction in Lagos. The system is envisioned to consist eventually of seven lines.[62] The railway equipment including electric power, signalling, rolling stock, and fare collection equipment will be provided by the private sector under a Concession Contract, while LAMATA is responsible for policy direction, regulation, and infrastructure for the network. The first section of the network, Phase I of the Blue Line, was originally planned to be completed in 2011. After many delays caused by funding shortfalls, the opening date was revised to 2022.[63] |
Third Mainland Bridge | Lagos, Lagos State | Completed | Unknown | The Third Mainland Bridge is currently the longest of three bridges connecting the island of Lagos to the mainland. It was completed in 1990 and became the longest bridge in Africa. The bridge was built by Julius Berger Nigeria PLC and it measures about 11.8 km in length. |
People's Republic of China
Project | City/District/Province/Prefecture | Status | Cost | Notes |
---|---|---|---|---|
China–Pakistan Economic Corridor (CPEC) | Area from Kashgar, China to South coast of Pakistan | Under Development | $62,000,000,000 | The project aims to connect Gwadar Port in southwestern Pakistan (Central Asia/South Asia) to China's northwestern (East Asia) autonomous region of Xinjiang, via a network of highways, railways and pipelines to transport oil and gas.[64] The economic corridor is considered central to China–Pakistan relations and will run about 3,000 km from Gwadar to Kashgar. Other than transport infrastructure, the economic corridor will provide Pakistan with telecommunications and energy infrastructure. The project also aims to improve intelligence sharing between the countries. |
Beijing Daxing International Airport | Daxing District, Beijing & Guangyang District, Langfang, Hebei Province | Completed | $17,000,000,000 | Completed and Opened November 2019. |
Hong Kong-Zhuhai-Macao Bridge (HKZMB) | Pearl River Delta | Completed | $10,600,000,000 | Opened in 2018. |
Japan
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Japan's Maglev High-Speed Rail (Chūō Shinkansen) | Tokyo–Nagoya–Osaka, Japan | Under Construction | $85,000,000,000 | JR Central aims to begin commercial service between Tokyo and Nagoya in 2027, with the Nagoya–Osaka section to be completed by 2037. |
South Korea
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Incheon International Airport | Incheon | Completed | $5,000,000,000+ | Construction of Phase 1 began in November 1992.[65] Phase 1 of the project opened 22 March 2001, after 8 years of construction and 6 additional months of testing of the systems as well as the runways. |
Incheon International Airport Phase 2 | Incheon | Completed | $4,600,000,000 | Construction of Phase 2 began in February 2002 and was completed 20 June 2008 prior to the 2008 Summer Olympics in Beijing, China.[65] |
Incheon International Airport Phase 3 | Incheon | Completed | $4,500,000,000 | Construction of Phase 3 began in September 2013 and has been split into 2 phases itself.[65] Phase 3 was completed in 2016 ahead of the 2018 Winter Olympics in Pyeongchang. |
Incheon International Airport Phase 4[66] | Incheon | Under Construction | $3,700,000,000 | Construction of Phase 4 begins 2019 with the expansion of Terminal 2 and construction of an additional runway, which is expected to be completed by 2025. |
India
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Hyderabad Metro Rail | Hyderabad, Telangana | Under Construction | $2,500,000,000+ | To respond to the rising public transport need and mitigate escalating vehicular traffic. Partially opened in 2017[67] and phase 1 is Operational from November 2019.[68][69] |
Navi Mumbai International Airport | Navi Mumbai, Mumbai, Maharashtra | Under Construction | $2,500,000,000+ | The airport project, aimed at easing air traffic congestion at CSIA is expected to be completed by 2023.[70] |
Delhi–Mumbai Industrial Corridor Project | Multiple States in India | Under construction | $1,000,000,000+ | One of the world's largest infrastructure projects with an estimated investment of US$90 billion and is planned as a high-tech industrial zone spread across six states,[71] as well as Delhi, the national capital and itself a Union Territory.[72] The investments will be spread across the 1,500 km long Western Dedicated Freight Corridor which will serve as the industrial corridor's transportation backbone.[73] |
Mumbai–Ahmedabad high-speed rail corridor | Multiplte States in India | Under construction | $18,000,000,000+ | High-speed rail line connecting the cities of Ahmedabad, Gujarat, and Mumbai. When completed, it will be India's first high-speed rail line.[74] |
Bharatmala | Multiple States in India | Under construction | $11,000,000,000+ | Bharatmala Pariyojana (Project) is a centrally-sponsored and funded Road and Highways project of the Government of India.[75] The project will build highways from Gujarat, Rajasthan, Punjab, Haryana and then cover the entire string of Himalayan states – Jammu and Kashmir, Himachal Pradesh, Uttarakhand – and then portions of borders of Uttar Pradesh and Bihar alongside Terai, and move to West Bengal, Sikkim, Assam, Arunachal Pradesh, and right up to the Indo-Myanmar border in Manipur and Mizoram.[75] |
Char Dham Highway | Uttarakhand | Under construction | $1,500,000,000+ | Char Dham Expressway National Highway (Hindi: चार धाम महामार्ग), is an under construction two-lane (in each direction) express National Highway with a minimum width of 10 metres in the state of Uttarakhand. The proposed highway will complement the under development Char Dham Railway by connecting the four holy places in Uttarakhand states includes Badrinath, Kedarnath, Champawat, Pithoragarh, Gangotri and Yamunotri The project includes 900 km national highways will connect whole of Uttarakhand state. |
Sagarmala | Multiple State of India | Under construction | $14,000,000,000+ | The Sagarmala Programme is an initiative by the government of India to enhance the performance of the country's logistics sector. The programme envisages unlocking the potential of waterways and the coastline to minimize infrastructural investments required to meet these targets.[76][77] |
Amaravati Smart City | Amaravati, Andhra Pradesh | Under construction | $4,000,000,000+ | It is a planned city in the state of Andhra Pradesh and will serve as the capital for the state after completion. It is being built on a 217 km2 riverfront designed to have 51% of green spaces and 10% of water bodies. |
Hyperloop | Proposed | Proposal to establish hyperloop infrastructure for the Pune-Mumbai corridor.[78]
In addition, the company Hyperloop Transportation Technologies is in a process to sign a Letter of Intent with the Indian Government for a proposed route between Chennai and Bengaluru. If things go as planned, the distance of 345 km could be covered in 30 minutes.[79] HTT also signed an agreement with Andhra Pradesh government to build India's first Hyperloop project connecting Amaravathi to Vijayawada in a 6-minute ride. Also, Indore-based Dinclix GroundWorks' DGWHyperloop advocates a Hyperloop corridor between Mumbai and Delhi, via Indore, Kota, and Jaipur.[80] |
Pakistan
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Karachi–Lahore Motorway | Multiple Provinces | Completed | $6,600,000,000 | The Karachi–Lahore Motorway (KLM) is a 1,694-kilometre-long (1,053 mi) six-lane, high-speed, limited-access motorway that will connect Karachi and Peshawar through Islamabad, Lahore, Multan and Sukkur. The KLM is divided into seven sections: Karachi-Hyderabad (M-9, 136 km); Hyderabad-Sukkur (M-6, 296 km); Sukkur-Multan (M-5, 387 km); Multan-Abdul Hakeem (M-4, 103 km); Abdul Hakeem-Lahore (M-3, 230 km); Lahore-Islamabad (M2, 376 km); and Islamabad-Peshawar (M1, 166 km). |
Karachi Circular Railway | Karachi | Under Development | $1,600,000,000 | Revival of the Karachi Circular Railway which became operational in 1969. It discontinued in 1999 as a result of mismanagement. In 2012, the governments on Pakistan and Sindh agreed to revive the railway to meet the needs of Karachi citizens. The project includes 23 stations, 3 lines and a total of over 50 kilometers of track. The government of Pakistan will have a 60% share in the project, Sindh will have a 25% share and Karachi will have a 15% share. Once completed, it will once again be Pakistan's largest local train. |
Karachi Metrobus | Karachi | Under Construction | $400,000,000 | A new rapid transit system in Karachi. With a planned length of about 115 kilometers, it will become the largest metro bus system in Pakistan. |
Malir Expressway | Karachi | Under Development | $400,000,000 | A 40.3 km three lane Expressway with controlled access along the Malir River in Karachi. It starts at the Qayumanbad Bridge and ends at the Karachi-Hyderabad Motorway (M-9). The project would cost around Rs40 billion. Construction is ordered to start in mid-2019. |
Gwadar International Airport | Gwadar | Under Development | $400,000,000 | Planned international airport in Gurandani, 26 km north-east of the existing airport in Gwadar City. |
Karachi–Peshawar Railway Line ML-1 | Multiple Provinces in Pakistan | Under Development | $7,000,000,000 | Karachi–Peshawar Railway Line (also referred to as Main Line 1 or ML-1) is one of four main railway lines in Pakistan, operated and maintained by Pakistan Railways. The total length of this railway line is 1,687 kilometers (1,048 mi). There are 184 railway stations from Kiamari to Peshawar Cantonment on this line. The line serves as the main passenger and freight line of the country. 75% of the country's cargo and passenger traffic uses the line. The line is currently undergoing a six-year ₨886.68 billion (US$7.4 billion) upgrade and renovation as part of the China Pakistan Economic Corridor, with average rail speeds expected be doubled to 160 kilometers per hour upon completion. |
Orange Line Metro | Lahore | Completed | $1,500,000,000 | Orange Line is an automated rapid transit system in Lahore, Punjab, PakistAN .When open in 2020, the line will be Pakistan's first metro in the entire country since the Karachi Metro that was started in 1969. Orange line is the first of the three proposed rail lines proposed for the Lahore Metro. The line will span 27.1 km (16.8 mi) with 25.4 km (15.8 mi) elevated and 1.72 km (1.1 mi) underground. The line will be served by 26 stations and is expected to handle 250,000 passenger daily. |
Indonesia
Project | City/Region | Status | Cost | Notes |
---|---|---|---|---|
Jakarta MRT | Jakarta | Completed | $2,860,000,000 | Currently consists of one line (North-South Line) and divided into two phases. Phase 1 was opened in March 2019, extensions of this line under Phase 2 shall open by 2024, and a second line (East-West) is expected by 2026. |
Jakarta–Bandung–Kertajati HSR | Java | Under Construction | $5,500,000,000 | |
Malaysia
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Klang Valley Mass Rapid Transit Project | Kuala Lumpur | Under Development | RM50,000,000,000 | A part of another mega project to transform Malaysia and Kuala Lumpur into one big Megapolis called as Greater Kuala Lumpur. |
ECRL | Kelantan,Terengganu,Pahang,Negeri Sembilan,Selangor | Under Development | RM 44,000,000,000 | |
KLIA 2 | Selangor | Completed | RM 3,920,000,000 | |
Penang Sentral | Penang | Completed | RM 230,000,000 | |
West Coast Expressway | Selangor and Perak | Under Development | RM 5,044,000,000 | |
Philippines
Project | City/Region/Province | Status | Cost | Notes |
---|---|---|---|---|
Bataan–Cavite Interlink Bridge | Bataan Cavite | Approved | $3,750,000,000 | A 32 km (20 mi) bridge over the Manila Bay that will connect Central and Southern Luzon.[81] |
Manila Metro Rail Transit System | Metro Manila Central Luzon Calabarzon | Partially operational | $15,845,000,000 | One line operational as of 2020. It is expected to have a total of eight lines with a total length of 142 km (88 mi), and to open from 2021 onward.[82][83][84][85][86][87] |
New Manila International Airport | Bulacan | Waiting approval | $14,111,000,000 | Aimed to decongest and eventually replace the Ninoy Aquino International Airport. It will be operated by the San Miguel Corporation.[88] |
North–South Commuter Railway | Metro Manila Central Luzon Laguna | Under Construction | $14,950,000,000 | Set to be fully operational by 2023, it will connect Clark International Airport with Metro Manila and Calabarzon.[89] |
Philippine National Railways intercity expansion | Central Luzon Calabarzon Bicol Region Mindanao | Waiting approval | $5,590,000,000+ | Includes South Main Line rehabilitation,[90] the freight-only Subic–Clark Railway and the first phase of the Mindanao Railway expansion.[91] |
Thailand
Project | City/Region | Status | Cost | Notes |
---|---|---|---|---|
High-speed rail in Thailand | Central, Western and Southern Thailand | Proposed | $30,000,000,000 | Consists of four proposed corridors with international extensions to Laos and Malaysia. |
Vietnam
Project | City/Region | Status | Cost | Notes |
---|---|---|---|---|
Long Thanh International Airport | Ho Chi Minh City | Under Construction | $7,800,000,000 | This first phase of the project has begun construction in 2019 and is being split into 3 sub-phases. Sub-Phase 1A will see the construction of one terminal and one runway ($5.6 Billion allocated to this sub-phase) to be completed by 2023. Sub-Phase 1B will be the construction of a 2nd runway starting in 2023 and be completed in 2025. Sub-Phase 1C will be the construction of the remaining facilities and land-clearance for future phase to begin and finish in 2025. |
Long Thang International Airport Phase 2 | Ho Chi Minh City | In Development | This phase will begin in 2025 after Phase 1 is completed and the airport opens that same year. Phase 2 will see the construction of a 3rd runway and expansion of the 1st Terminal or construction of a 2nd Terminal to increase passenger capacity to 50 million passengers. Phase 2 is expected to be completed by 2035. | |
Long Thang International Airport Phase 3 | Ho Chi Minh City | In Development | This phase will begin in 2035 after Phase 2 is completed and the airport opens that same year. Phase 3 will see the construction of a 4th runway with the possibility of another terminal or additional concourses to increase passenger capacity up to 100 million passengers. Phase 3 is expected to be completed sometime after 2035. |
Bahrain
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Bahrain International Airport Expansion Project | Muharraq, Muharraq Island | Under Construction | $1,100,000,000 | |
Bahrain Light Rail Network | Bahrain | Under Construction | $2,000,000,000 |
Iran
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Tehran-Shomal Freeway | Iran | Under Construction | Around US$1 Billion to finish | 121 km freeway connecting Tehran to Chalus[92] |
Israel
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Tel Aviv–Jerusalem railway | Between Tel Aviv and Jerusalem | Nearing Completion | $1,900,000,000–$2,800,000,000 | 1. Construction on the line between Tel Aviv HaHaganah and Ben Gurion Airport (western part of Railway 27) was completed in 2004 and is currently open.
2. Construction on the line between Ben Gurion Airport and Kfar Daniel (eastern part of Railway 27) completed in 2007 with service commencing in September 2007. 3. Construction on the line between Kfar Daniel and Latrun (Section A) was completed in 2011 and is currently open. 4. Construction on the line between Latrun and Sha'ar HaGai (Section B) was completed in 2015 and is currently open. 5. Construction on the line between Sha'ar HaGai and Mevaseret Zion (Section C) was completed between 2014 & 2016 and is currently open. 6. Construction on the line between Mevaseret Zion and Jerusalem Binyanei HaUma Railway Station, Jerusalem (Section D) began either sometime in 2010. Electrification works on the existing railway between Tel Aviv Central and Herzliya are expected to be finished in the fall of 2020 and would allow trains from Jerusalem to terminate in Herzliya instead of Tel Aviv Central. |
Tel Aviv Light Rail | Tel Aviv Metropolitan Area | Under Construction | $55,000,000,000/187.5 billion ILS | The project will consist of four new light rail lines and three new metro lines: the light rail lines will cost around a combined ILS 37.5 billion ILS & the Tel Aviv Metro is planned to cost around 45 billion ILS. |
Kuwait
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project | Kuwait Bay | Completed | $3,000,000,000 | Completed in 2019, it is the launching point Madinat Al-Hareer in Subiya, Kuwait; which is north of Kuwait City across Kuwait Bay. |
Kuwait International Airport Passenger Terminal 2[93] | Kuwait City | Under Construction | $4,310,182,400 | Construction began in May 2017 to expand the capacity of the airport. Expected to be Completed in 2022. |
Qatar
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Doha Metro | Doha | Under Construction | $36,000,000,000 | Planned length of 300 km; set for completion in 2026. |
Qatar Expressway Programme | Doha | Under Construction | US$28 billion (CAPEX) | The Expressway Programme aims to deliver more than 800 kilometres of new or upgraded roads and more than 200 interchanges in Qatar. It is part of the Qatar National Vision 2030. One of the motivating factors is the planned 2022 FIFA World Cup.[94] |
Saudi Arabia
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
King Abdulaziz Airport Expansion | Jeddah | Completed | $7,200,000,000 | Completed on 1 January 2019. |
Riyadh Metro | Riyadh | Under Construction | $23,500,000,000 | Set to begin operation by 2020. |
United Arab Emirates
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Al Maktoum International Airport | Dubai | Under Construction | $82,000,000,000 | Upon completion it will be the fourth largest airport in the world.[95] |
Costa Rica
Project | City | Status | Cost | Notes |
---|---|---|---|---|
Orotina Mega Airport | ||||
Green Costa Rican Canal | ||||
Electric Train of The Great Metropolitan Area |
Panama
Project | City | Status | Cost | Notes |
---|---|---|---|---|
4th bridge over the Panama Canal | Panama | Under Construction | $1,400,000,000 | |
Panama Metro line 1 | Panama | Completed | $1,800,000,000 | |
Panama metro line 2 | Panama | Completed | $2,000,000,000[96] | |
Panama metro line 3 | Panama | In planning | $2,600,000,000[97] |
Serbia-North Macedonia-Greece
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Danube–Morava–Vardar–Aegean Canal | Serbia–North Macedonia–Greece | In Planning | $17,000,000,000 | The Danube-Morava-Vardar-Aegean Canal is in planning for a very long time, significant progress has been made in 2013 and 2014, with China having interests in building a canal. The project would cost around $17,000,000,000. Serbia is most interested country in building this project, which would make Great Morava and South Morava passable for boats from Thessaloniki. There would be many hydropower plants as well as 9 ports in Jagodina, Stalać, Kruševac, Kraljevo, Niš, Leskovac, Vranje, Kumanovo and Skopje. It would connect new rivers into three main rivers, and make Morava and Vardar navigable rivers, and clean them for passage of boats. The project was a major theme of the January 2020 Thessaloniki summit, when all three leaders met.[98] |
Serbia-Hungary
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Budapest–Belgrade railway | Serbia, Hungary | Under Construction | around $5,000,000,000 | The Budapest–Belgrade railway project aims to connect Budapest and Belgrade by high-speed rail. The project is the first stage of the planned Budapest–Belgrade–Skopje–Athens railway, which itself is part of China's Belt and Road Initiative and would connect the China-run Piraeus port in Greece with the "heart" of Europe. |
Serbia
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Belgrade Metro | Serbia | In Planning | around $5,000,000,000 | Belgrade Metro is a project in planning for over a century, but recently, new progress has been made in planning, and construction is set to start by end of 2021. It would have 43 stations and 2 lines, and would cost around $5,000,000,000. Line 1:Route:Železnik ↔ Mirijevo,Length:21.3 km (13.2 mi),23 stations.Line 2:Route:Zemun railway station ↔ Mirijevo,Length:19.2 km (11.9 mi),20 stations. It would be built by French and many other companies. |
Belgrade-Boljare motorway | Serbia | Under Construction | $2,389,800,000 | Belgrade-Boljare Motorway is part of Belgrade-Bar motorway motorway,and will connect Serbian Capital Belgrade and Montenegro Port city of Bar. Serbian Section is set to cost $2,389,800,000 with first and Completed Section of Belgrade-Pozega 151.63 kilometres long costing 889.8 million euros, and because of favourable terrain it will be the cheapest section of the motorway.Second Section under Construction is Pozega-Boljare Section,and it would cost at least US$1.5 billion,for approximately 110 km.Second Section is most expensive section of whole Belgrade-Boljare motorway,because of not favourable terrain with many tunnels and bridges. |
Belgrade Waterfront | Serbia | Under Construction | $3,500,000,000 | Belgrade Waterfront is an urban renewal development project headed by the Government of Serbia aimed at improving Belgrade's cityscape and economy by revitalizing the Sava amphitheater, a neglected stretch of land on the right bank of the Sava river, between the Belgrade Fair and Branko's bridge. It was started in 2014 with the reconstruction of the Belgrade Cooperative building, which was finished in June of the same year. |
European Union (As a whole)
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
TEN-T Core Network | Europe | Under Construction | $550,000,000,000 | The purpose of the project is connect nine European Corridors, east–west and north–south. The nine corridors are the Baltic-Adriatic Corridor, the North Sea-Baltic Corridor, the Mediterranean Corridor, the Orient/East-Med Corridor, the Scandinavian-Mediterranean Corridor,[99] the Rhine-Alpine Corridor, the Atlantic Corridor, the North Sea-Mediterranean Corridor, and the Rhine-Danube Corridor.[100] The Trans-European conventional rail network is part of the EU Mega-Project to help alleviate and assist in the transport of goods throughout the 27 EU member states. |
Czech Republic
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Blanka tunnel complex | Prague | Completed | $1,970,000,000 | The longest city tunnel in Europe at 5.5 km. The three continuous tunnels improve traffic in the northern part of Prague as well as reducing the load on the main transit route through the city center. |
France
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Grand Paris Express | Paris | Under Construction | $45,000,000,000 | Construction began in 2015 and is expected to be completed as well as opened in stages between 2020 & 2030. |
Germany
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Verkehrsprojekt Deutsche Einheit Nr. 8 | Between Berlin Main Station and Nuremberg Main Station | Mostly Completed | $10,000,000,000 | Including the Erfurt–Leipzig/Halle high-speed railway, the Nuremberg–Erfurt high-speed railway, upgrades to the existing Berlin–Halle railway and linking onward to the Nuremberg–Munich high-speed railway |
Greece
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Athens Metro | Athens | Under Construction | $6,480,000,000 | Line 2 and Line 3 of Athens Metro were constructed between 1992 and 2000 (Line 1 began operation in 1869).[101] The construction of lines 2 and 3 (including their ongoing extensions) cost €4.30 billion.[102] Line 4 is set to begin construction in 2019 with a budget of €1.45 billion.[103] |
Egnatia Odos | Greece | Completed | $6,690,000,000 | Construction began in 1995, and a total of 670 kilometres (420 mi) of motorways running along the general route of the ancient Roman Via Egnatia.[104] It runs from Igoumenitsa, in Epirus, crosses Western Macedonia, Central Macedonia, and ends on Greece's border with Turkey in Eastern Macedonia and Thrace. The project cost €5.93 billion.[104] |
Egnatia Railway | Greece | In planning | $11,270,000,000 | Proposed in 2017 at a cost of €10 billion,[105] the Egnatia Railway will be Europe's largest railway megaproject.[106] The original stated start date was March 2019.[105] |
Ionia Odos | Greece | Completed | $1,240,000,000 | Construction began in 2006, and a total of 196 kilometres (122 mi) of motorways running north–south through Western Greece, from Ioannina to the Rio-Antirio Bridge, were built.[107] The project had a budget of over €1.1 billion.[107] |
Thessaloniki Metro | Thessaloniki | Under Construction | $2,550,000,000 | The purpose of the project is to create a 35-station underground rapid transit system in Greece's second-largest city. Currently phases 1 and 2 (18 stations) are under construction and will be operational by late 2020 at a price tag of €2.26 billion.[108] |
Thessaloniki–Kavala–Xanthi railway | Greece | In planning | $1,475,000,000 | A new electrified railway line connecting the northern Greek cities of Thessaloniki, Kavala, and Xanthi, at a cost of €1.25 billion.[109] It will run in parallel with the Egnatia Odos highway, cutting travel times and will replace the existing Thessaloniki–Alexandroupoli railway which was built during Ottoman times.[109] |
Tithorea-Domokos bypass | Greece | Completed | $2,030,000,000 | Construction began in 1997, and a total of 106 kilometres (66 mi) of high-speed railways running between the towns of Tithorea and Domokos were built as a bypass to the existing conventional mountainous railway line linking Thessaloniki in the north with Athens in the south, including 35.5 kilometres (22.1 mi) of tunnels and 6.8 kilometres (4.2 mi) of bridges.[110] The project had a budget of over €1.8 billion.[107] The bypass was opened in January 2019.[111] |
Hungary
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Budapest–Belgrade Railway | Budapest-Kiskőrös-Kiskunhalas-Kelebia | Under Construction | $3,900,000,000 | Budapest–Belgrade railway is a railway project under construction, at end, people could go from Budapest to Belgrade, and vice versa 200 km\h by fast railway. Hungary is set to complete Budapest-Serbian Border by 2023. Project on both sides would cost around $5,000,000,000 with $2,000,000,000 on Hungarian side. The Budapest–Belgrade railway is also a part, and the first stage, of the planned Budapest–Belgrade–Skopje–Athens Railway international connection in Central and Southeast Europe, a Chinese-CEE "hallmark" project of Beijing's Belt and Road initiative, connecting the China-run Piraeus port in Greece with the "heart" of Europe. The expansion of this project to Nis is under Planing, which would add new $800,000,000 into this project, and a new 120–160 km\h Railway in Nis-Presevo and Nis-Dimitrovgrad both costing around $200,000,000, and are set to start construction by 2021 and end it by end of 2021 or 2022. It would be built by Russian and Chinese companies. |
Montenegro
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Bar-Boljare motorway | Montenegro | Under Construction | $3,000,000,000 | Construction began on 11 May 2015; The length of the route of the highway is 40.871 km, and national road standards of Montenegro are adopted, with reference to the European specifications as well. These construction standards will be applied for the two-way four-lane highway, with the speed of 100 km/h according to the design, and the construction period of 4 years. The highway stretches from south to the north across the mountains. In technical terms it is very demanding, and the construction is very challenging. Bridges and tunnels make up to about 60% of the entire route. In recent years, it is the largest infrastructure project in Montenegro, and the implementation of the project is very challenging. |
Norway
Project | City/Country | Status | Cost | Notes | |
---|---|---|---|---|---|
Coastal Highway E39 | Trondheim to Kristiansand | In Planning | $42,400,000,000 | The purpose of the project is to replace all the ferry links along the route with fixed connections in order to reduce travel time from 21 hours to 11 hours. The first part, Rogfast is since 2018 under construction at a cost of $1.9 bn, but the rest is controversial and not decided. Some of the fjords are too deep for pillars or undersea tunnels and too wide for suspension bridges, so floating bridges in untested sizes are suggested. Initial cost estimates placed the project around 150 bn kroner, but an August 2020 updated estimate moved the cost to 382 bn. A study is underway with the goal of cutting costs, and it is possible the project may be scaled back. | |
InterCity | Østlandet | Under Construction | $36,300,000,000 | Project to connect all major towns in the vicinity of Oslo by a double rail line. 270 km of new line will be added and existing infrastructure will be upgraded, improving passenger flow and experience, as well as allowing train speeds up to 250 km/h throughout the region. Expected to be completed by 2034. |
Poland
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Central Transport Hub | Gmina Baranów | In planning | $8,000,000,000+[112] | The project involves the construction of the largest airport in Poland and one of the largest in Europe, Solidarity Airport (initially able to handle 45 million passengers a year, with the possibility of extension up to 100 millions), along with highway and high-speed rail infrastructure connecting major Polish citities and the airport. Phase 1 scheduled to open in 2027.[112] |
Portugal
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Vasco da Gama Bridge | Lisbon | Completed | $1,100,000,000 | Construction began in February 1995; the bridge was opened to traffic on 29 March 1998, just in time for Expo 98, the World's Fair that celebrated the 500th anniversary of the discovery by Vasco da Gama of the sea route from Europe to India.
It is the longest bridge in Europe (including viaducts), with a total length of 12.3 kilometres (7.6 mi), including 0.8 kilometres (0.50 mi) for the main bridge and 11.5 kilometres (7.1 mi) in viaducts. The Bridge is served by 4.8 kilometres (3.0 mi) of dedicated access roads. It was built to alleviate the congestion on Lisbon's 25 de Abril Bridge, and eliminate the need for traffic between the country's northern and southern regions to pass through the capital city. |
Serbia-North Macedonia-Greece
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Danube–Morava–Vardar–Aegean Canal | Serbia–North Macedonia–Greece | In Planning | $17,000,000,000 | The Danube-Morava-Vardar-Aegean Canal is in planning for a very long time, significant progress has been made in 2013 and 2014, with China having interests in building a canal. The project would cost around $17,000,000,000. Serbia is most interested country in building this project, which would make Great Morava and South Morava passable for boats from Thessaloniki. There would be many hydropower plants as well as 9 ports in Jagodina, Stalać, Kruševac, Kraljevo, Niš, Leskovac, Vranje, Kumanovo and Skopje. It would connect new rivers into three main rivers, and make Morava and Vardar navigable rivers, and clean them for passage of boats. The project was a major theme of the January 2020 Thessaloniki summit, when all three leaders met.[98] |
Serbia-Hungary
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Budapest–Belgrade railway | Serbia, Hungary | Under Construction | around $5,000,000,000 | The Budapest–Belgrade railway project aims to connect Budapest and Belgrade by high-speed rail. The project is the first stage of the planned Budapest–Belgrade–Skopje–Athens railway, which itself is part of China's Belt and Road Initiative and would connect the China-run Piraeus port in Greece with the "heart" of Europe. |
Switzerland
Project | City/Canton | Status | Cost | Notes |
---|---|---|---|---|
Gotthard Base Tunnel | Bodio, Canton of Ticino (End) & Erstfeld, Canton of Uri (Start) | Completed | CHF 9.560 billion ≈ $10,300,000,000 | At 57 km, the world's longest and deepest rail tunnel upon its completion in 2015. |
United Kingdom
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Expansion of Heathrow Airport | England | Approved | $25,234,620,000 | Building a 3rd Runway and an additional Terminal. |
Irish Sea Bridge | Scotland/Northern Ireland | Planned | $20,000,000,000 | Completion planned for 2030s[113] |
High Speed 2 | England | Under Construction | $96,000,000,000 | Completion planned for 2026 (phase 1), 2033 (phase 2) |
High Speed 3 | England | Planned | $19,000,000,000 | Completion planned for 2033 |
London Crossrail Project | London, England | Under Construction | $26,000,000,000 | Entire project to be completed by 2021. |
M8 motorway (Scotland) | Glasgow, Scotland | Completed | £30,000,000 | Most completed by 1980. |
North America
Canada
Project | City/Province | Status | Cost | Notes |
---|---|---|---|---|
Southwest Calgary Ring Road | Calgary, Alberta | Under Construction | $5,000,000,000+ | "...extend from Lott Creek Boulevard on Glenmore Trail/Highway 8 south to Macleod Trail (Highway 2A) and is approximately 21 kilometres long."[114] Set for Completion in Fall 2022. |
West Calgary Ring Road | Calgary, Alberta | Under Construction | $1,000,000,000+ | Set for Completion in 2021. |
Calgary LRT Expansion | Calgary, Alberta | Under Construction | $4,500,000,000+ | Set for Completion in 2026. |
Crowchild Trail Upgrades | Calgary, Alberta | Under Construction | $3,000,000,000+ | Set for Completion in 2030 |
New Champlain Bridge Corridor Project | Montréal to Brossard, Québec | Completed | $4,239,000,000 | Construction completed 2019 with the full opening of the Samuel-de-Champlain Bridge by July 2019. Shortly after the opening, the old Champlain Bridge will start to be demolished at a cost of about $400,000,000 and take 4 years to complete. |
Réseau express métropolitain | Montréal, Québec | Under Construction | $6,300,000,000 | Set for Completion in 2023.[114] |
Confederation Bridge | The Maritimes, Prince Edward Island | Completed | $1,300,000,000 | The 12.9 km bridge is the longest bridge in the world crossing ice-covered water. |
Line 5 Eglinton | Toronto, Ontario | Under Construction | $9,100,000,000 | Set for Completion in 2021.[114] |
Port Mann Bridge | Vancouver, British Columbia | Completed | $1,930,000,000 | The widest bridge in the world (until the Bay Bridge's east span recently opened), the bridge east of Vancouver, B.C., which opened in 2012, remains the second-longest bridge in North America. The cable-stay bridge uses an impressive 288 cables to reach a total bridge length of 6,866 feet. |
Confederation Line | Ottawa, Ontario | Completed | $2,100,000,000 | The largest project in Ottawa since the Rideau Canal. Opened in September 2019[115] (Phase 1). |
Mexico
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Durango-Mazatlán Highway | Durango-Sinaloa | Completed | $1,400,000,000 | Construction in 2008 and was completed in 2012. Upon this projects completion, President Felipe Calderón received a Guinness record certifying that the Baluarte Bicentennial Bridge is the highest suspension bridge in western Mexico. |
New International Airport for Mexico City | Mexico City | Cancelled | $13,300,000,000 | After taking office, President Andrés Manuel López Obrador, cancelled this mega-project at Texcoco in favor of a "metropolitan airport system", which keeps the Benito Juárez International Airport (with 2 Runways) from being decommissioned and adds the now under construction Felipe Ángeles Airport (with 3 Runways) as well as Toluca International Airport (with 2 Runways). |
Felipe Ángeles Airport | Mexico City | Under Construction | $7,100,000,000 | Being built at the Santa Lucía Air Force Base north of Mexico City and named after Mexican General Felipe Ángeles Ramírez |
United States
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Project Connect | Austin, Texas | Under Construction | $7,100,000,000 | Project Connect is a public transit expansion in Austin, adding the Blue and Orange light rail lines, the Green commuter rail line, and the Gold bus rapid transit line along with other network improvements.[116] The project started construction in 2021 and is expected to be complete by 2034.[117] |
Big Dig | Boston, Massachusetts | Completed | $14,600,000,000 | Estimated to cost $24.3 billion after interest. |
C.R.E.A.T.E. | Chicago, Illinois | Under Construction | $4,600,000,000 | C.R.E.A.T.E. is a railway improvement project in Chicago.[118] Completion of the entire project is expected to occur sometime in 2025. |
O'Hare Modernization | Chicago, Illinois | Under Construction | $8,800,000,000 | Construction began in 2001 with an initial cost of $6.6 billion, however, over the last few years, additions to the Modernization Plan brought on by the Chicago City Council's approval on new leases to American and United has increased to the cost by $2.2 billion, which will include a new terminal where Terminal 2 now, sits as well as two more remote concourses. The completion of the O'Hare Modernization is expected to occur sometime in 2026. |
Gordie Howe International Bridge | Detroit, Michigan-Windsor, Ontario, Canada | Under Construction | $5,700,000,000 | The project was first proposed in 2004. Construction started in 2018 and is expected to be completed in 2024. The Windsor-Detroit crossing is the busiest crossing between the US and Canada and is currently handled by the Ambassador Bridge, the Windsor-Detroit Tunnel and the Michigan Central Railway Tunnel. The Gordie Howe Bridge will add needed capacity to these crossings. |
Crescent Corridor Expansion | Eastern Coast States-East South Central States-Gulf Coast States | Under Construction | $2,500,000,000 | The freight rail company Norfolk Southern will utilize special intermodal trains on its freight rail network running from New York to Louisiana. This project covers 4023 km (2,500 miles) and thirteen states, and is expected to be fully developed by 2020."[119] |
California High-Speed Rail | Los Angeles-San Francisco, California | Under Construction | $70,000,000,000 | A 1300 km (808 miles) high-speed rail system is expected to be Completed in phases up to 2030. Currently some of the funding is being held up in Congress by lack of agreement between Democrats and Republicans. |
Los Angeles International Airport | Los Angeles, California | Under Construction | $14,000,000,000 | |
Ohio River Bridges Project | Louisville, Kentucky | Completed | $2,300,000,000[120] | A Louisville metropolitan area transportation project involving the reconstruction of the Kennedy Interchange (locally known as "Spaghetti Junction"), the completion of two new Ohio River bridges and the reconstruction of ramps on Interstate 65 between Muhammad Ali Boulevard and downtown. |
Second Avenue Subway Project | Manhattan, New York City, New York | Under Construction | $17,000,000,000 | The proposed full line would be 13.7 km (8.5 miles) long with 16 stations and a projected ridership of 560,000 people. Phase 1 of the project, which runs from 96th Street to 57th Street and 7th Avenue, opened 1 January 2017. Other phases of the project are either under development or are under construction. |
Newark Airport Terminal One | Newark, New Jersey | Under Construction | $2,300,000,000 | A redevelopment plan to build a new Terminal A to replace the existing, which opened in 1973. The new terminal will be called Terminal One. It will include a new parking garage, 33 gates, and a walkway to connect the Airtrain station, parking garage, and terminal. It is expected to be completed by 2022. |
LaGuardia Airport Project | Queens, New York City, New York | Under Construction | $8,000,000,000 | A complete retrofit of the entire airport slated to be completed by 2022. |
JFK Airport Redevelopment | Queens, New York City, New York | Under Construction | $17,000,000,000 | Plan to rebuild passenger facilities and approaches to JFK Airport. Two new international terminals would be added. The redevelopment construction of JFK Airport began on 7 January 2020. Also, "on February 11, 2020, Cuomo and the Port Authority, alongside with Delta Air Lines, announced a $3.8 billion plan to add sixteen domestic gates to the 'A' side of Terminal 4," bring the total cost to almost $17 billion. |
San Francisco-Oakland Bay Bridge Eastern Span | San Francisco-Oakland, California | Completed | $6,400,000,000 | The Eastern span replacement of the San Francisco-Oakland Bay Bridge began in 2002 and was Completed in 2013. Currently the Old East Span is being deconstructed and removed for recycling while the foundations are being demolished with explosives or converted for other uses. |
San Francisco International Airport Redevelopment | San Francisco, California | Under Construction | $2,400,000,000 | The airport began a multiphase renovation project in June 2016, which will see Terminal 1 be transformed into a world-class, environment-friendly passenger facility when Completed in 2024. |
Alaskan Way Viaduct replacement tunnel | Seattle, Washington | Completed | $3,100,000,000 | South-End Viaduct replacement started in 2008 and was completed in 2014. The SR 99 Tunnel started work in 2011, and is set for completion in 2021. Mitigation Projects started work in 2008, and are set for completion in 2019. Other miscellaneous projects started in 2007 and are set for completion in 2023. |
The Puget Sound Gateway Program | Washington | Under Construction | $1,960,000,000 | This project has been in planning phases since 1990, and includes the completion of SR 167 between Puyallup and Tacoma, as well as completion of SR 509 from I-5 to Burien. |
Evergreen Point Floating Bridge (2016) | Seattle, Washington | Completed | $4,560,000,000 | This 2,350m (7,710ft) long floating bridge is the longest of its type in the world. The new SR 520 bridge replaced the previous record-holder, the original Evergreen Point Floating Bridge across Lake Washington, connecting Seattle to points east. The new structure, rising 6.1m (20 ft) above the water, opened to traffic in spring 2016. |
Sound Transit 3 | Seattle, Washington | Under Construction | $50,000,000,000 | This project is to expand the current Light Rail and Bus system currently in use in Seattle, which is to be completed in stages from 2020 until 2041. |
Silver Line (Washington Metro) | Washington, D.C. | Under Construction | $6,800,000,000 | Phase 1 on the project was planned to link the Capital to Dulles International Airport and to four edge cities: Tysons, Reston, Herndon, and Ashburn. This phase completed and was opened to the general public on 26 July 2014. Phase 2 is set to help with urban development of Tysons and reduce overall reliance on highway traffic in the business district, Virginia's largest and 12th-largest in the country. This project is set to be completed by 2020. |
Australia
Project | City/Province | Status | Cost | Notes |
---|---|---|---|---|
Cross River Rail | Brisbane, Queensland | Under Construction | $5,400,000,000 | To be completed in 2024. The crossing will be a tunnel under the river, and the first rail-only Brisbane River crossing since the completion of the Merivale Bridge in 1978.[121] |
OneSKY | Canberra, ACT | Under Development | $2,000,000,000 | To be completed in 2024. National Air Traffic Control System Australia.[122] |
Metro Tunnel | Melbourne, Victoria | Under Construction | $11,000,000,000 | To be completed late 2025. The line will run from South Kensington, underground via North Melbourne, Parkville, CBD, Domain and South Yarra. It will include a tunnel under the Yarra River. |
North East Link | Melbourne, Victoria | Under Development | $15,000,000.00 | To be completed late 2027. This project will connect the M80 Ring Road to the Eastern Freeway. |
Suburban Rail Loop | Melbourne, Victoria | Proposed | $50,000,000,000 | To be completed in 2050. The line will run from Cheltenham to Werribee in an orbital loop circling the suburbs of Melbourne. Proposed to be completed in 4 stages[123] |
Central Station to Eveleigh Redevelopment | Sydney, New South Wales | Proposed | $10,000,000,000 | Extension of Sydney's CBD. The renewal corridor approximately 3 km in length.[124] |
Sydney Metro City & Southwest | Sydney, New South Wales | Under Construction | $12,000,000,000 | 30 km (19 mi) rapid transit railway line. Planned to open by 2024.[125] |
Planned cities and urban renewal projects
Infrastructure systems that include electricity, sewer, telecommunications, and transportation. Building cities that include Skyscrapers, housing, etc. requires concrete, steel, glass, and most especially that workers in all the trades to undertaker the massive scale of these megaprojects.
Kenya
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Konza Technology City | Konza | Under Construction | $14,500,000,000 |
Egypt
Project | City/Governorate | Status | Cost | Notes |
---|---|---|---|---|
Madinaty | Cairo Governorate | Under Construction | $10,000,000,000 | Housing project.[126] |
Proposed new capital of Egypt | Cairo Governorate | Under Construction | $58,000,000,000 | Construction began in 2015 and is spread out into three phases with Phase 1 expected to be completed sometime in 2022. The full project is expected to be fully Completed by 2050, housing a population of 6,500,000 people. |
New Mansoura City | Cairo Governorate | Under Construction | $3,700,000,000 | Construction began in 2017. |
New Alamein City | Matrouh Governorate | Under Construction | $60,000,000,000 | Construction began in 2015 spread out over 3 phases. |
Galala City | Suez Governorate | Under Construction | $63,000,000,000 | Construction began in March–April 2018 spread out in phases with the 1st phase set for completion in June 2020.[127] |
South Africa
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Modderfontein New City — New Gauteng City | South Africa | Abandoned[128] | $7,800,000,000 | Modderfontein infrastructure development of residential, industrial and commercial space by Chinese developer Shanghai Zendai. Start dated 2015 completion dated 15 to 20 years later.[129][130] |
Western Africa
Nigeria
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Abuja | FCT | Completed | The planned capital city of Nigeria, which was built mainly in the 1980s. It officially became Nigeria's capital on 12 December 1991, replacing Lagos, and has since witnessed a huge influx of people into the city. As at 2006, the city of Abuja had a population of 776,298, making it one of the ten most populous cities in Nigeria, with an estimated metropolitan population of well over three million. Abuja is currently amongst the four largest urban areas in Nigeria.[132] | |
Asokoro Island[133] | Abuja, FCT | Under Construction | $1,000,000,000 | A peninsula development located in Asokoro district, in Abuja. The mixed-use development is approximately 60 hectares of land, located at the shores of Pendam Lake. Its residential development ranges from apartment buildings to villas. They are majorly luxury properties with private balconies, mezzanines, floor-to-ceiling windows, swimming pool and sun terrace etc. The commercial and work section presents hotels, offices, shopping malls, business and primary schools.[134] |
Centenary City | Abuja, FCT | Under Construction | $18,000,000,000 | Project by the Nigerian Government, Eagle Hills of Abu Dhabi and Julius Berger Nigeria PLC to build a smart city to mark the country's centennial anniversary. Project broke ground on 19 June 2014 and has an anticipated timeline of 10 to 15 years to completion. The city, which is located in the Federal Capital Territory, anticipates over 400,000 residents.[135] |
Eko Atlantic | Lagos State | Under Construction | $6,000,000,000 | A planned city of Lagos State, Nigeria, being constructed on land reclaimed from the Atlantic Ocean. The project broke ground in 2007 and is being spearheaded by South Energyx Nigeria Ltd. Upon completion the project anticipates at least 250,000 residents and an additional daily flow of 150,000 commuters.[136] |
FESTAC Phase 2 | Lagos, Lagos State | Under Development | $2,400,000,000 | In 2014, The Ministry of Housing and Urban Development signed deal with the New Festac Property Development Company, to develop the second phase of Festac Town. Since the award, the company has been carrying out extensive preliminary project development activities including surveys, field studies, site investigation, environmental impact assessment, and town planning for the project.[137] |
Lekki | Lagos State | Under Construction | A peninsula city which is 755 square kilometres. Lekki Phase 1 has been completed and it currently houses several Estates and gated residential developments; other phases of the project include, areas allocated for a Free Trade Zone, with an airport, and a sea port under construction. The proposed land use master plan for the Lekki envisages the Peninsula as a "Blue-Green Environment City", expected to accommodate well over 3.4 million residential population and an additional non-residential population of at least 1.9 million.[138] |
China
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Todtown | Shanghai | Under Construction | $1,500,000,000 | A mixed-use development. Started construction in 2014 and is set for completion in 2022. |
Japan
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Roppongi Hills | Tokyo | Completed | $4,000,000,000 | One of Japan's largest integrated property developments. |
Sky Mile Tower | Tokyo | Proposed | UNKNOWN | If built, completion would probably be in the year 2045 and stand at 1.7 km in height with a capacity of around 55,000 people. |
South Asia
India
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Amritsar-Kolkata Industrial Corridor | Area from Amritsar to Kolkata, India | Proposed | ||
Bengaluru-Mumbai Economic Corridor | Area from Bengaluru to Mumbai, India | Proposed | ||
Chennai-Bengaluru Industrial Corridor | Area from Chennai to Bengaluru, India | Proposed | ||
Delhi Mumbai Industrial Corridor | Area from Delhi to Mumbai, India | Under Construction | $90,000,000,000 | Conceived as a global manufacturing and trading hub, the project is expected to double employment potential, triple industrial output and quadruple exports from the region in five years. The total employment to be generated from the project is 3 million, the bulk of which will be in the manufacturing/processing sectors. The project initially aims to create seven smart cities distributed along the backbone of the dedicated freight corridor between Delhi and Mumbai. Completion of the Corridor is expected for 2037. |
Navi Mumbai | India | Under Construction | $13,346,000,000 | World's largest planned city. Contains a population of 2.6 million.[139] |
Gujarat International Finance Tec-City | India | Operational | $20,000,000,000 | The smart city is being built as a global financial hub to provide world class infrastructure for the Indian financial industry to grow.[140] It aims to outclass France's La Défense, Tokyo's Shinjuku and London's London Docklands in every aspect.[141] |
Vizag-Chennai Industrial Corridor | Area from Vizag to Chennai, India | Proposed | ||
Pakistan
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Islamabad | Islamabad | Completed | The new capital city of Pakistan. A planned city located on north of Rawalpindi. The city has population of 2.2 million.[142] | |
Bahria Town | Karachi | Under Development | $1,000,000,000 | Bahria Town Karachi is a planned community near Pakistan's largest port city Karachi.[143] |
DHA City, Karachi (DCK) | Karachi | Under Development | To be built on a 4,700 hectares piece of land located several kilometres northeast of Karachi.[144] Upon completion, the new city which is still under development is anticipating at least 250,000 residents and a daily flow of 50,000 commuters.[145] | |
Crescent Bay | Karachi | Under Development | $2,400,000,000 | Covering 440,000 meters, Crescent Bay is one of the biggest projects in Pakistan. It is a mixed-use oceanfront development in Karachi. It features multiple high rise buildings, shopping malls, 5-star hotels, and mosques. The project is managed by Emaar properties who built the Burj Khalifa complex in Dubai. This project is one of the most modern projects ever built in Pakistan. |
Gwadar Port City | Gwadar | Under Development | $62,000,000,00 | A future mega city which is in progress under CPEC.It is located in Balochistan province of Pakistan. |
Port Tower Complex | Karachi | Under Development | $350,000,000 | A 593m tall skyscraper situated at Karachi Port Trust. The building will be located on a man-made island with other skyscrapers. It will be located along the Mai Kolachi Bypass. Once completed, it will be the tallest building in South Asia. |
Bahria Paradise | Karachi | Under Development | A part of Bahria Town Karachi. | |
Ravi Riverfront Urban Development Project | Lahore | Under Development | $41,040,000,000 | Sprawling over an area of 70,000 acres, the RRUDP entails high-quality residential, commercial, institutional, cultural and recreational zones along both sides of the river at a stretch of 33 km.[146] The riverfront will be dotted with highrise condominiums, modern piers, boardwalks and 70 percent area dedicated to trees to make it environment friendly.[147] Around 25,000 acres of riverfront would be sold to investors for business, cultural and lifestyle activities.[148] |
LDA City | Lahore | Under Development | LDA City is the biggest housing society project ever undertaken by LDA,[149] and is the largest housing society in Punjab, Pakistan. The city is to be built on a 3,059 hectares (7560 acres) piece of virgin land located several kilometers south of Lahore. |
Sri Lanka
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Colombo Port City | Colombo | Under Construction | $15,000,000,000 | A planned offshore city in Colombo, Sri Lanka which is to be built on reclaimed land adjacent to the Galle Face Green. The city will use construction resources from the Colombo Harbour Expansion Project, currently under construction near the site of this proposed city.[150] Set for Completion in 2041. |
Indonesia
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
BSD City | Greater Jakarta | Completed | An area half the size of Paris, BSD City encompasses an area of about 6000 hectares. | |
Lippo Cikarang | Greater Jakarta | Completed | $18,750,000,000 | Lippo Cikarang is an industrial park with an area of 332 hectares, which also has apartment, hotel, office, shopping center, retail, school and university, hospital, convention center and other supporting facilities. |
Pantai Indah Kapuk | Jakarta | Completed | Pantai Indah Kapuk (PIK) is a well-planned model town in North Jakarta, spreading over 1200 hectares of land. | |
Ancol Dreamland | Jakarta | Completed | Ancol Dreamland is an integrated tourism area in South East Asia with an area of about 600 hectares. |
Malaysia
Project | City/District | Status | Cost | Notes |
---|---|---|---|---|
KL River City | Kuala Lumpur | In Development | $11,638,736,500 | Rehabilitation project along the Gombak River.[151] |
Forest City | Johor Bahru | Under Construction | $100,000,000,000 | To Be Completed in 2035. |
Iskandar Malaysia | Johor Bahru | Under Construction | $100,000,000,000 | |
Putrajaya | Putrajaya, Sepang District | Completed | $8,100,000,000 | In 1999 most of the seats of government moved from Kuala Lumpur to Putrajaya. |
Melaka Gateway | Malacca City | Under Construction | $ 40,000,000,000 | |
Philippines
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Lancaster New City Zone 1 and Zone 2 | Cavite | Under Construction |
2,000 hectare planned community in Cavite | |
Nuvali | Laguna | Under Construction | 2,290 hectare planned community in Santa Rosa, Laguna. | |
Entertainment City | Manila Bay | Under Development | $15,000,000,000 | An entertainment complex which is intended to be the Philippine counterpart of Macau and Las Vegas. It is built upon reclaimed land along Manila Bay. |
Eastwood City | Quezon City | Completed | A high-density mixed-use development. | |
Bonifacio Global City | Taguig | Completed | Previously occupied by the Philippine Army headquarters, it is currently one of Metro Manila's main central business districts. | |
New Clark City | Tarlac and Pampanga | Under Construction | $59,288,000,000 | A 9,450-hectare planned city modeled after South Korea's Songdo City. Singapore's SSR C-Solar power plant will provide the city's power supply. |
Azerbaijan
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Khazar Islands | Azerbaijan | Under Construction | $100,000,000,000 | Artificial archipelago 25 km (16 mi) south of Baku, Azerbaijan consisting of 41 islands spreading 3,000 hectares (about 11.6 sq mi) over the Caspian Sea. Expected to be finished by 2020–2025, and house a population of 1 million. |
Iran
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Iran Mall | Tehran, Iran | Under Construction | The project spans more than 1.6 million square meters that includes shopping mall, two tower, two 5 star hotels, and a lake.[152] | |
Iraq
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
The Bride of the Gulf | Basra | Proposed | Basra is in the midst of rebuilding and is in need of something that will return it to its pre-Hussein period. |
Jordan
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Abdali Project[153][154] | Amman, Jordan | Under Construction | $5,000,000,000 | Project is being developed on 384,000 square metres (0.148 sq mi) of land, intending to create a total built-up area of over 1,700,000 square metres (0.66 sq mi) consisting of hotels, apartments, offices, commercial outlets and entertainment.[153][154] |
Kuwait
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Madinat al-Hareer | Kuwait | Under Development | $632,000,000,000 | Proposed 250 km2 (62,000-acre) planned urban area in Subiya, Kuwait an area just opposite Kuwait City across Kuwait Bay. |
Qatar
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Lusail | Al Daayen Municipality | Under Development | $45,000,000,000 | Planned to be a host city of the 2022 FIFA World Cup, planned population of 260,000 people |
Saudi Arabia
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Jeddah Economic City | Jeddah | Under Construction | $20,000,000,000 | Will host both commercial and residential development including homes, hotels, and offices. The centerpiece of the development project will be the $1.2 Billion Jeddah Tower, a tower planned to become the tallest in the world. |
Masjid Al-Haram | Mecca | Under Construction | $100,000,000,000 | The Saudi government is reportedly paying as high as 500,000 Saudi riyals (around $133,000) per square meter to the owners of the buildings close to the mosque in return for the expropriation. This brings the total figure to around $100 billion. Slated to Completed by 2020. |
Neom (Neo-Mustaqbal) | Neom | In Development | $500,000,000,000 | Saudi Arabia's most ambitious mega-city project ever, which is to build a new city in northwestern Saudi Arabia.[155] At the core of this new city will be Artificial Intelligence.[156] |
King Abdullah Financial District | Riyadh | Under Construction | $78,000,000,000 | About a fifth (Phase 1) of the project is completed. |
King Abdullah Economic City | Saudi Arabia | Under Construction | $100,000,000,000 | Currently in various stages of Construction and Completion stages. |
United Arab Emirates
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Masdar City | Abu Dhabi | Under Construction | $22,000,000,000 | The city will rely entirely on solar energy and other renewable energy sources, with a sustainable, zero-carbon, zero-waste ecology and will be a car free city. |
Yas Island | Abu Dhabi | Under Development | $36,000,000,000 | It occupies a total land area of 2,500 ha (25 km2), of which 1,700 ha will be claimed for development. The island holds the Yas Marina Circuit, which hosts the Formula One United Arab Emirates Grand Prix since 2009. |
Burj Al Arab | Dubai | Completed | $1,000,000,000 | Completed and Opened in 1999, it is the 3rd tallest hotel in the World. |
Burj Khalifa | Dubai | Completed | $1,500,000,000 | Originally call the Burj Dubai, the Burj Khalifa is currently the tallest building in the World and has held that title since its Completion and Grand Opening on 4 January 2010. |
Dubai Meydan City | Dubai | Under Construction | $2,200,000,000 | Expected Completion date about 2020. |
Falconcity of Wonders | Dubai | Under Development | $36,500,000,000 | |
Business Bay | Dubai | Under Development | $30,000,000,000 | Comprises 240 high and low rise buildings, mostly residential and mixed use skyscrapers. |
The World | Dubai | Under Development | $14,000,000,000 | Artificial archipelago of various small islands constructed in the rough shape of a world map. Development has slowly restarted. |
Palm Jumeirah | Dubai | Completed | $12,300,000,000 | It is the world's largest man-made island. |
Dubai Marina | Dubai | Completed | World's largest man-made marina, with 200 residential and hotel high rises. | |
Palm Jebel Ali | Dubai | On-Hold | $4,000,000,000 | Will accommodate over 250,000 people by 2020. |
Palm Deira | Dubai | On-Hold | Will be the largest palm island, in Dubai. | |
Dubai International City | Dubai | Under Construction | $95,000,000,000 | A country-themed architecture of residences, business, and tourist attractions. |
Jumeirah Garden City | Dubai | On-Hold | $95,000,000,000 | Will be built across an area north of Sheikh Zayed Road between Diyafa Street and Safa Park. |
Dubai Waterfront | Dubai | Under Development | Expected to become the largest waterfront and largest man-made development in the world. | |
Dubailand | Dubai | Under Construction | $64,300,000,000 | Will be world's largest Retail and Entertainment World, twice the size of Walt Disney World Resort, it include 45 mega projects and 200 sub projects. Currently, there are 22 projects under development. Expected Completion Date about 2025. |
The Universe | Dubai | On-Hold | A planned artificial archipelago in the shape of the Milky Way and Solar System. | |
The Tower | Dubai | Under Construction | $1,000,000,000 | Located at Dubai Creek Harbour, The Tower will be a mixed-use skyscraper that will be a notch taller than the Burj Khalifa when Completed in 2020. |
Mall of the World | Dubai | Under Construction | $6,806,425,500 | To be located along the Sheikh Mohammed bin Zayed Road and set to Open in 2029. |
Republic of Turkey (Europe West and Asia East of the Bosphorus, the Sea of Marmara, and the Dardanelles)
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
İstanbul Finance Center | İstanbul | Under Development | $5,000,000,000 | Apart from the main urban renewal project of İstanbul. It will station in Ataşehir |
Turkey Urban Renewal Project | Turkey | Under Development | $400,000,000,000[157][158] | Renewals are being conducted all over Turkey but mainly on İstanbul[159] as Law 6306 announced by Ministry of Environment and City Planning (Turkey).[160] Fikirtepe, a neighborhood of Kadıköy has been chosen as pilot area for project.[161] Construction started in 2012 and is expected to take 20 years to complete setting for 2032. |
Russia (Europe West and Asia East of the Ural Mountains)
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Moscow International Business Center | Moscow | Under Construction | $12,000,000,000 | Construction on Plots 1, 2–3, 4 (Tower 1) & (Tower 2), 6–8, 9, 10, 11, 12, 13, 14, 16, and 19 is completed. Construction on Plots 15 and 17–18 is in progress. |
Lakhta Center | Lakhta, Saint Petersburg | Completed | $2,500,000,000 | Replaces the Okhta Center, which was cancelled due to official objections of UNESCO World Heritage Committee. |
Okhta Center | Saint Petersburg | Cancelled | $2,500,000,000 | Never built, will be replaced by the new project Lakhta Center |
France
Project | Commune | Status | Cost | Notes |
---|---|---|---|---|
La Défense (1958–2014) | Courbevoie Nanterre Puteaux | Completed | $10,000,000,000+ | The Central Business District of the Paris Metropolitan area, La Défense provides France with a modern set of skyscrapers while Paris itself retains most of its original architecture and character. |
La Défense (2016–Present) | Courbevoie Nanterre Puteaux | Under Construction | $1,000,000,000+ | The Central Business District of the Paris Metropolitan area, La Défense provides France with a modern set of skyscrapers while Paris itself retains most of its original architecture and character. This current round of the project includes modernize, refurbish and green the area. |
Europa City | Gonesse | Cancelled | $3,400,000,000 | Construction began on the 8.6-million-square foot mixed-use development north of downtown in 2016 but was cancelled on 8 November 2019. |
Germany
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Potsdamer Platz Redevelopment | Berlin | Completed | Project divided onto four parts in which four investors bids in turn. | |
HafenCity | Hamburg | Under Development | Completion expected in 2020–2030 |
Romania
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Esplanada City Center | Bucharest | Cancelled | $4,200,000,000 |
Spain
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Bilbao Renovation Project | Bilbao | Completed | In the 1990s, the city began a de-industrialisation process, which radically changed its image. After closing several factories and decontaminating the city's river, several mega projects were built. A whole new airport, designed by Spanish world-famous architect Santiago Calatrava, a metro system designed by British Lord Norman Foster, a recovery of the city's old fashioned tram network changed the city's public transport system. The Iberdrola Tower, which is Bilbao's tallest building, the Alhondiga, the Zubizuri bridge and several other significant buildings changed the city center's polluted past. The whole renovation process started because of the construction of The Guggenheim Museum Of Bilbao, the city's landmark and main museum. | |
CTBA – Madrid Financial District | Madrid | Completed | est. $1,000,000,000 | A complex of four skyscrapers, each about 240 metres high, located on one of Madrid's most expensive avenue, La Castellana. The towers were built on Real Madrid's former Ciudad Deportiva, and were completed in 2008. The tallest building is Torre Cepsa, designed by world-famous architect Norman Foster, and has a height of 249 meters, making it Spain's tallest structure. |
Madrid New North | Madrid | Approved | $10,550,000,000 | Expansion of the existing Paseo de la Castellana. If completed as planned, it will include a business complex, 10,500 homes, and multiple skyscrapers. |
Southeast developments | Madrid | Under construction | +$3,500,000,000 | A strategy that aims to expand the city in the southeast of the city with the creation of six neighborhoods (Los cerros, Ensanche de Vallecas, Valdecarros, el Cañaveral, los Berrocales, los Ahijones) At the moment one of the neighborhoods is already built, another one is under construction, two other neighborhoods already have the ground ready, while the two remaining neighborhoods have nothing built.
This strategy aims to create some 145,637 homes in the south of Madrid, of which 30,000 have been built so far. These developments would extend the surface of Madrid by 8.2% and could house more than 350,000 inhabitants. The entire strategy is not expected to be completed until 2040/2050. |
Sweden
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Million Programme | All of the country | Completed | neighborhood of $5 bn | 1965–1975 |
Movement of Kiruna Centrum | Kiruna | Under Development | $2,100,000,000 | Entire project to be completed between 2020 and 2021.[162] |
Northvolt Gigafactory | Skellefteå & Västerås | Under Development | $4,700,000,000 | Lithium ion battery factory.[163] |
Redevelopment of the Slussenområdet | Stockholm | Under Development | SEK12,000,000,000 | "The construction of the New Slussen is one of the largest urban transformation projects in Sweden".[164] |
United Kingdom
Project | City/Country | Status | Cost (£) | Notes |
---|---|---|---|---|
Big City Plan | Birmingham, England | Under Construction | £12,750,000,000 | Entire project to be completed sometime in the 2030s. |
Battersea Power Station | London, England | Under Construction | £13,250,000,000 | Entire project to be completed by 2025. |
Embassy Gardens | London, England | Completed | £2,100,000,000 | Completed in Spring to Summer 2019. |
Greenwich Peninsula | London, England | Under Construction | £8,000,000,000 | Entire project to be completed by the 2030s. |
Pilgrim Street East | Newcastle upon Tyne, England | Under Construction | +£400,000,000 | Entire project to be completed by 2025. |
Royal Wharf | London, England | Under Construction | £3,100,000,000 | To be Completed sometime in 2020. |
Stratford City | London, England | Under Construction | £3,500,000,000 | Entire project to be completed by 2020. |
Wembley Park | London, England | Under Construction | £1,100,000,000 | Entire project to be completed by 2024, the project has garnered $1.1 billion in funding so far. |
North America
Canada
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Downtown Markham | Markham, Ontario | Under Construction | $4,000,000,000 | One of the many city center projects in York Region. Scheduled for Completion in 2025. |
Mexico
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Cancún | Quintana Roo | Completed | One of main tourist destinations in the world. | |
Santa Fe, Mexico City | Mexico City | Completed | Before the city dump, today one of largest CBDs in the world. |
United States
Project | Borough/County/City/State | Status | Cost | Notes |
---|---|---|---|---|
Port Covington | Baltimore, Maryland | Under Construction | $5,500,000,000 | Groundbreaking began June 2019. Expected to be Completed by 2040. |
Pacific Park | Brooklyn, New York City, New York | Under Construction | $8,000,000,000 | The project's centerpiece, Barclays Center, opened in September 2012. The project name Atlantic Yards has been renamed Pacific Park, Brooklyn. The Project is expected to be Completed by 2025 at the earliest. |
Lincoln Yards Project | Chicago, Illinois | Approved | $6,000,000,000 | The development of 55 acres of riverfront land in Chicago. |
Vista Tower Project | Chicago, Illinois | Under Construction | $1,000,000,000 | Set for Completion in 2020. Tallest structure designed by a woman. |
Brickell Key | Claughton Island, Miami, Florida | Completed | $2,000,000,000+ | A man-made island called Claughton Island[165] off the mainland Brickell neighborhood of Miami, Florida. |
Apple Park | Cupertino, California | Completed | $3,000,000,000+ | The "spaceship", as it is nicknamed, is Apple's new flagship headquarters (formally named Apple Campus 2). Taking the shape of a giant ring, it is expected to house over 14,000 employees. It was completed and opened in April 2017. |
Encore Boston Harbor | Everett, Massachusetts | Completed | $2,500,000,000 | Opened in 2019, the casino resort property is the largest single private development in Massachusetts history. |
Generation Park | Houston, Texas | Under Construction | $10,000,000,000+ | A 4,200 acre privately owned and master-planned commercial development 20-minutes from Downtown Houston. The project broke ground in 2014 with TechnipFMC's 173-acre corporate campus.[166] Generation Park is owned and developed by McCord. |
CityCenter | Las Vegas, Nevada | Completed | $11,000,000,000 | The largest privately financed development in the United States. |
Wilshire Grand Center | Los Angeles, California | Completed | $1,200,000,000 | Opened on 23 June 2017. It is the tallest building in Los Angeles, the tallest building in California, and the tallest building west of the Mississippi at a height of 1,100 feet. |
Riverside South | Manhattan, New York City, New York | Under Construction | $3,000,000,000 | An urban development project in the Lincoln Square neighborhood of the Upper West Side of Manhattan, New York City. |
Battery Park City | Manhattan, New York City, New York | Completed | $1,400,000,000+ | Mainly a residential 92-acre (37 ha) planned community at the southwestern tip of the island of Manhattan in New York City, New York, United States, more than 1⁄3 of which is parkland.[167] |
Cornell Tech Campus | Manhattan, New York City, New York | Under Construction | $2,000,000,000 | Construction began in 2014 on the South end of Roosevelt Island. The first of three phases is set to be completed in stages between 2017 and 2019 and Phase 2 to be Completed sometime later. |
Hudson Yards Redevelopment Project | Manhattan, New York City, New York | Under Construction | $20,000,000,000 | A mixed-use real estate development currently being built over the 28-acre West Side Rail Yard. |
Rebuilding of the World Trade Center | Manhattan, New York City, New York | Re-Construction In Progress | $32,000,000,000[168] | Recovery from the September 11 attacks. One, Three, Four, and Seven World Trade Center Towers completed 2006–2018. Two, Five, and Six World Trade Center Towers are either in development, currently on hold, or will never be rebuilt. |
53W53 | Manhattan, New York City, New York | Completed | $1,200,000,000 | Formerly the Tower Verre is a Supertall Skyscraper with a Museum and Residential Condominiums. Completed in 2019[169] |
Brickell City Centre | Miami, Florida | Construction in Progress | $1,050,000,000 | A shopping and mixed-use project that will span up to give blocks in the Brickell district of Downtown Miami. Currently consists of three towers each just over 500 feet and is proposed to add One Brickell City Centre, an 80-story, 1049 ft skyscraper. |
Miami Worldcenter | Miami, Florida | Construction in Progress | $4,000,000,000 | A large mixed-use development of over 25 acres of land on the north side of Downtown Miami. Eventually will include lots of shopping, apartment buildings, hotels, office buildings, and even a convention center. Though not much has been built as of yet, one notable building is Paramount Miami Worldcenter, which stands at 700 ft tall. |
Comcast Technology Center | Philadelphia, Pennsylvania | Completed | $1,500,000,000 | Ninth-tallest building in the Western Hemisphere as well as the tallest building in the Western Hemisphere outside of Manhattan and Chicago at a height of 1,121 feet, which opened in 2018. |
Shell Pennsylvania Petrochemicals Complex | Potter Township, Beaver County, Pennsylvania | Under Construction | $6,000,000,000 | Commencing in 2017, the cracker plant currently holds over 3,000 construction jobs, and will have 600 permanent jobs when the plant is completed. It will produce over 1.6 million tonnes of ethylene per year. |
Gigafactory 1 | Reno, Nevada | Under Construction | $5,000,000,000 | 6.3 Blocks (30%) of the total 21 Blocks of the factory Completed and the remaining 14.7 Blocks to be completed by 2020. |
The Transbay Redevelopment Area | San Francisco, California | Under Construction | $4,500,000,000 | The redevelopment of began in June 2005 and is expected to be fully Completed around 2030, includes a new Transbay Transit Center and the newly opened Salesforce Tower. The Salesforce Tower is a 1,070-foot Supertall Office Skyscraper just completed in the South of Market district of downtown San Francisco at a cost of $1,100,000,000. |
San Francisco Shipyard and Candlestick Redevelopment | San Francisco, California | Under Construction | $8,000,000,000 | Set to be Completed sometime after 2028. |
Treasure Island Redevelopment | San Francisco, California | In Development | $6,000,000,000 | Set to be Completed by 2028. |
The Mission Bay Redevelopment | San Francisco, California | Under Construction | $1,000,000,000 | |
Parkmerced | San Francisco, California | Under Construction | $1,350,000,000 | Expected to be Completed by 2035. |
Washington State Convention Center | Seattle, Washington | Under Construction | $1,600,000,000 | This expansion project is expected to be Completed in 2020. |
Sasol Ethane Cracker Complex Project | Westlake-Mossville-Lake Charles, Calcasieu Parish, Louisiana | Under Construction | $8,900,000,000 | Large-scale petrochemical complex in Southwestern Louisiana. |
Australia
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Queen's Wharf, Brisbane | Brisbane, Queensland | Under Construction | $3,000,000,000 | Integrated Resort Development located on the north bank of the Brisbane River in the Brisbane central business district. Entire project to be completed by 2024.[170] |
Barangaroo | Sydney, New South Wales | Under Construction | $6,000,000,000 | Entire project to be completed by 2023 |
Victorian Desalination Plant | Williamsons Beach, Dalyston-Wonthaggi, Bass Coast Shire, Victoria | Completed | $4,000,000,000 | Built to provide more drinking water to Melbourne because in the mid-2000s the city's water reserves were at 28% of capacity. |
New Zealand
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Rebuilding of Christchurch | New Zealand | Re-Construction In Progress | $17,000,000,000 | Recovery from earthquakes in 2010–2011. Rebuild of central business district, demolition and remediation of several residential neighbourhoods now deemed unsuitable for building. Infrastructure upgrades and addition of commuter rail. Entire project to be completed by 2020. |
Brazil
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Brasília | Brasília | Completed | $21,900,000,000 | At the close of the 20th century, Brasília was the largest city in the world which had not existed at the beginning of the century.[171] Construction cost for Brasília in 1957 was about $2.5 Billion.[172] |
Colombia
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Bogota Urban Renewal | Bogota | Under Development | $50,000,000,000 | Includes building over 60 skyscrapers, 500 highrises, 3 new CBDs, a subway system, and a smart city near Usaquén. |
Water-related
Ports, waterways, canals, and locks for Passenger Ships and Cargo Ships carrying passengers and cargo from country to country and islands nations are built as megaprojects
Ethiopia
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Grand Ethiopian Renaissance Dam | Benishangul-Gumuz Region | Under Construction | $4,800,000,000 | The dam is located on the Blue Nile River in Ethiopia. Construction began in 2011 and is expected to be completed sometime between 2020 and 2022. |
Kenya
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
LAPSSET Corridor Program | Lamu | Under Construction | $13,000,000,000 |
Tanzania
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Bagamoyo Port | Bagamoyo | Under Construction | $10,000,000,000 |
Northern Africa
Egypt
Project | Province(s) | Status | Cost | Notes |
---|---|---|---|---|
New Suez Canal | Ismailia and Suez | Completed | $8,400,000,000 | In August 2014, work started on expanding the Suez Canal, dubbed the "New Suez Canal" was completed and opened on 6 August 2015. |
Suez Canal | Ismailia and Suez | Completed | $1,725,950,238.22 | A man-made canal that connects the Mediterranean Sea with the Red Sea cost $100 million in 1869. |
Nigeria
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Badagry Deep Sea Port | Badagry, Lagos State | Under Construction | $2,300,000,000 | Construction started in January 2016, and the project is expected to have a "soft Launch" in 2018.[173][174] |
Lekki Port | Lekki, Lagos State | Under Construction | $1,650,000,000 | The Port at Lekki is a new seaport in Lekki, and construction commenced in 2015. The port is planned to be developed in phases to meet the growing demand; phase one opened in 2018.[175] The port is financed by private investors and a consortium of banks who have funded the project with $1.65 billion so far.[176] |
China
Project | City/District/Province | Status | Cost | Notes |
---|---|---|---|---|
Three Gorges Dam | Sandouping, Yiling District, Yichang, Hubei Province | Completed | $59,000,000,000 | The Yangtze River Project began in 1994 and was Completed in 2003. |
South–North Water Transfer Project | South to North China | Under Construction | $79,000,000,000[177] | No timeline to indicate a completion date of this project and no telling how much more the project will cost. |
Japan
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Kamaishi Tsunami Protection Breakwater | Kamaishi, Iwate | Completed | $1,500,000,000 | Completed in March 2009, it soon became the tsunami barrier that failed to protect Kamaishi during the 2011 Tōhoku earthquake and tsunami. |
Sri Lanka
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Colombo Harbour Expansion Project | Colombo | Completed | $1,200,000,000 | Construction began in 2008 and completely finished on 8 August 2013. |
India
Sagarmala Project- The Sagarmala Programme is an initiative by the government of India to enhance the performance of the country's logistics sector. The programme envisages unlocking the potential of waterways and the coastline to minimize infrastructural investments required to meet these targets.[1][2] It entails investing Rs. 8.5 trillion (2018) to set up new mega ports, modernizing India's existing ports, developing of 14 Coastal Economic Zones (CEZs) and Coastal Economic Units, enhancing port connectivity via road, rail, multi-modal logistics parks, pipelines & waterways and promoting coastal community development, with the aim of boosting merchandise exports by US$110 billion and generating around 10,000,000 direct and indirect jobs. Six megaports are planned in Sagarmala project.[178]
S.No. | Location | State | Status |
1. | Sagar Island | West Bengal | DPR under preparation |
2. | Paradip Outer Harbour | Odisha | DPR under preparation. |
3. | Sirkazhi | Tamil Nadu | Techno Economic Feasibility Report(TEFR) prepared. |
4. | Kanniyakumari | Tamil Nadu | Major Transhipment Port at Kanniyakumari. SPV formed for the purpose - March 2019. |
5. | Belikeri | Karnataka | Techno Economic Feasibility Report (TEFR) prepared. |
6. | Vadhavan | Maharashtra | DPR under preparation. |
Israel
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
National Water Carrier of Israel | Completed | ~$1,100,000,000 | Completed in 1956 |
United Arab Emirates
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Dubai Marina | Dubai | Completed | World's largest man-made marina, with 200 residential and hotel high rises. | |
Dubai Waterfront | Dubai | Suspended | Expected to become the largest waterfront and largest man-made development in the world. |
Cuba
Project | City/Province(s) | Status | Cost | Notes |
---|---|---|---|---|
New Port of Mariel Development Project | Mariel, Artemisa | Completed | $900,000,000[179] |
Nicaragua
Project | City/Province(s) | Status | Cost | Notes |
---|---|---|---|---|
Nicaragua Canal | Proposed | est. $100,000,000,000 | Formally the Nicaraguan Canal and Development Project (also referred to as the Nicaragua Grand Canal, or the Grand Interoceanic Canal) is a planned shipping route through Nicaragua to connect the Caribbean Sea (and therefore the Atlantic Ocean) with the Pacific Ocean. Its viability has been questioned by shipping experts and engineers[180] |
Panama
Project | Province(s) | Status | Cost | Notes |
---|---|---|---|---|
Panama Canal | Colón Province and Panamá Province | Completed | $8,961,664,698.46 | Originally constructed by the United States for about $360 million. Opened on 15 August 1914 with a series of locks, canals, and lakes which connect ships traveling between the Atlantic Ocean and the Pacific Ocean. |
Panama Canal Expansion | Colón Province and Panamá Province | Completed | $5,250,000,000 | The Expansion Opened 26 June 2016. |
Netherlands
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Zuiderzee Works | Central | Completed | A man-made system of dams and dikes, land reclamation and water drainage work, in total the largest hydraulic engineering project undertaken by the Netherlands during the twentieth century. | |
Delta Works | Southwest Middelburg to Dordrecht | Completed | $13,000,000,000 | A series of construction projects in the southwest of the Netherlands to protect a large area of land around the Rhine-Meuse-Scheldt delta from the sea. The project was proposed after the North Sea Flood of 1953. |
Canada
Project | City/Province | Status | Cost | Notes |
---|---|---|---|---|
Rideau Canal | Kingston to Ottawa | Completed | £822,804 (January 1834) | A 202 km waterway opened in 1832 to provide a secure supply and communications route between Montreal and the British naval base in Kingston. |
Mexico
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Port of Veracruz Expansion | Veracruz | Under Construction | $5,000,000,000 | |
Dos Bocas Refinery | Tabasco | Under Construction |
United States
Project | City/State | Status | Cost | Notes |
---|---|---|---|---|
Intracoastal Waterway | Boston, Massachusetts to Brownsville, Texas | A 3,000-mile (4,800 km) inland waterway along the Atlantic and Gulf of Mexico coasts of the United States, running from Boston, Massachusetts, southward along the Atlantic Seaboard and around the southern tip of Florida, then following the Gulf Coast to Brownsville, Texas. |
Brazil
Project | City/Country | Status | Cost | Notes |
---|---|---|---|---|
Porto Maravilha | Rio de Janeiro | Completed | $35,700,000,000 | Entire project to be completed by 2015. |
References
- Altshuler, Alan; Luberoff, David (30 April 2003). Mega-Projects: The Changing Politics of Urban Public Investment. Brookings Institution Press. ISBN 978-0-8157-0129-3. Archived from the original on 18 January 2017. Retrieved 9 February 2016.
- "Woman to build house out of 747". BBC News. 20 April 2006. Archived from the original on 27 August 2010. Retrieved 30 December 2010.
- Sutter, Joe; Spenser, Jay (1 May 2007). 747: Creating the World's First Jumbo Jet and Other Adventures from a Life in Aviation. Collins. ISBN 978-0-06-088242-6.
- Norris, G.; Thomas, G.; Wagner, M. & Forbes Smith, C. (2005). Boeing 787 Dreamliner – Flying Redefined. Aerospace Technical Publications International. ISBN 0-9752341-2-9.
- Irving, Clive. Wide Body: The Triumph of the 747. New York: W. Morrow, 1993. ISBN 0-688-09902-5, pp. 189–190.
- Garwood, Darrell. "Newest Air Force planes grounded". Archived 4 February 2016 at the Wayback Machine Times-News, 17 January 1970.
- "B-2 Bomber: Cost and Operational Issues Letter Report, 14 August 1997, GAO/NSIAD-97-181". Archived 8 April 2015 at the Wayback Machine United States General Accounting Office (GAO). Retrieved: 13 September 2009.
- Vidal, John (1 August 2019). "What should we do with radioactive nuclear waste?". The Guardian. ISSN 0261-3077. Archived from the original on 1 August 2019. Retrieved 2 August 2019.
- Dedaj, Paulina (3 July 2019). "Chernobyl's $1.7B nuclear confinement shelter revealed after taking 9 years to complete". Fox News. Archived from the original on 2 August 2019. Retrieved 2 August 2019.
- "World's First Carbon Capture Power Plant Switches On". Climate Central. 5 October 2014. Archived from the original on 7 October 2014. Retrieved 7 October 2014.
- "OL3 EPR's regular electricity generation starts in March 2021" (Press release). TVO. 19 December 2019. Archived from the original on 19 December 2019. Retrieved 19 December 2019.
- "Kemper County: constructing the world's first IGCC with CCS" (PDF). KBR. Archived from the original (PDF) on 11 October 2014. Retrieved 7 October 2014.
- "Panamá inaugura su primera planta de gas natural". tvn-2.com. Retrieved 1 November 2018.
- "U.S. Nuclear Comeback Stalls as Two Reactors Are Abandoned". The New York Times. Archived from the original on 29 March 2020. Retrieved 1 November 2018.
- "With 2,245 MW of Commissioned Solar Projects, World's Largest Solar Park is Now at Bhadl". Archived from the original on 20 March 2020. Retrieved 20 March 2020.
- "SECI tenders another 750MW at record-luring Bhadla Solar Park". PV Tech. Archived from the original on 1 December 2017. Retrieved 22 March 2018.
- "Country's Biggest Solar Park In Rajasthan, At The Heart Of India's Clean Energy Push". NDTV.com. Archived from the original on 12 February 2018. Retrieved 6 June 2017.
- "World's Largest Solar Park at Karnataka's Pavagada is Now Fully Operational". Archived from the original on 27 December 2019. Retrieved 27 December 2019.
- "Karnataka's Pavagada Solar Park to be Fully Operational by December 2019". Archived from the original on 12 April 2019. Retrieved 12 April 2019.
- "10 really cool Solar Power installations in (and above) the world". Archived from the original on 29 January 2018. Retrieved 30 January 2018.
- "宁夏在腾格里沙漠南缘建成全国最大沙漠光伏集成区 – 今日热点 – 中国储能网". www.escn.com.cn. Archived from the original on 3 May 2018. Retrieved 20 May 2017.
- "Benban, Africa's largest solar park, completed". European Bank for Reconstruction and Development. Archived from the original on 27 December 2019. Retrieved 29 November 2019.
- "FAIR: New German particle accelerator clears first hurdle". phys.org. Archived from the original on 15 November 2016. Retrieved 13 June 2012.
- "The Impact of Genomics on the U.S. Economy" (PDF). Batelle Technology Partnership Practice. June 2013. Archived (PDF) from the original on 12 October 2013. Retrieved 1 November 2014.
- Webb, Jonathan (21 May 2015). "LHC smashes energy record with test collisions". Archived from the original on 8 September 2015. Retrieved 28 August 2015.
- Lee Billings (12 February 2016). "The future of Gravitational wave Astronomy". Scientific American. Archived from the original on 13 February 2016. Retrieved 13 February 2016.
- "The price of the Manhattan Project". Restricted Data: The Nuclear Secrecy Blog. Archived from the original on 7 October 2014. Retrieved 31 October 2014.
- "Materials Genome Initiative". Archived from the original on 13 October 2018. Retrieved 1 November 2018.
- "Cassini Solstice Mission-FAQs". Jet Propulsion Laboratory. Archived from the original on 1 February 2014. Retrieved 24 January 2014.
- "Gaia spacecraft set for launch on mission to map a billion stars". The Guardian. Archived from the original on 15 December 2013. Retrieved 15 December 2013.
- "Galileo navigational system enters testing stage". Deutsche Welle. Archived from the original on 15 October 2012. Retrieved 30 January 2018.
- Kathy Sawyer (17 December 1991). “Galileo Antenna Apparently Still Stuck”. Washington Post: A14; Kathy Sawyer (18 December 1991). “$1.4 Billion Galileo Mission Appears Crippled.” Washington Post: A3 Archived 14 February 2017 at the Wayback Machine in Mission to Jupiter. p.180.
- Galileo: Facts & Figures Archived 12 November 2013 at the Wayback Machine. NASA.gov. Retrieved 12 November 2012.
- https://www.cs.cmu.edu/~sensing-sensors/readings/GPS_History-MR614.appb.pdf
- "Herschel: Fact Sheet" (PDF). ESA.int. ESA Media Relations Office. 28 April 2010. Archived (PDF) from the original on 13 October 2012.
- "The Space Review: Costs of US piloted programs". thespacereview.com. Archived from the original on 12 July 2018. Retrieved 28 February 2015.
- "Technical Frequently Asked Questions (FAQ)". NASA-JWST. Archived from the original on 18 January 2014. Retrieved 24 January 2014.
- D. Leone. "MSL Readings Could Improve Safety for Human Mars Missions". Space News. Retrieved 24 January 2014.
- George Musser (May 2011). "Cosmic-Ray Detector on Space Shuttle Set to Scan Cosmos for Dark Matter". Scientific American. Archived from the original on 2 February 2014. Retrieved 24 January 2014.
- "Moon Worth Apollo's $170 Billion?". Guardian Liberty Voice. Archived from the original on 31 October 2014. Retrieved 31 October 2014.
- "Space Shuttle Total Cost: More Than AIG Bailout, Less Than War". Fox News. 5 July 2011. Archived from the original on 24 January 2015. Retrieved 23 December 2014.
- Brumfield, Loyd (21 September 2017). "Rangers Unveil First Renderings of New Globe Life Field, Set to Break Ground Next Week". The Dallas Morning News. Retrieved 21 September 2017.
- Federal Reserve Bank of Minneapolis. "Consumer Price Index (estimate) 1800–". Retrieved 1 January 2020.
- Demause, Neil (January 2009). "Private/Public Cost Breakdowns for New Yankees/Mets Stadiums" (PDF). FieldOfSchemes.com. Retrieved 26 July 2020.
- "The NBA Comes to Brooklyn". Construction Digital. 1 August 2011. Archived from the original on 18 October 2011. Retrieved 4 August 2011.
- Barrabi, Thomas (6 January 2020). "Las Vegas Raiders' Allegiant Stadium, by the numbers". Fox Business. Retrieved 12 January 2020.
- Mosley, Matt (15 September 2008). "Jones building a legacy with $1.3 billion Cowboys stadium". Retrieved 28 November 2008.
- Rosenberg, Mike (19 April 2012). "49ers' Kick Off Move to Santa Clara With Far-From-Traditional Groundbreaking". San Jose Mercury News. Retrieved 6 May 2012.
- Brinson, Will (27 March 2018). "NFL Reportedly Raising Debt Limit on Rams Stadium after L.A. Project nears $5B Price Tag". Retrieved 27 March 2018.
- "Wilfs pledge $19.5M more to stadium". ESPN. 26 March 2015. Retrieved 27 March 2015.
- "Cuomo, Islanders Make Belmont Official". New York Islanders. 20 December 2017. Archived from the original on 29 December 2017. Retrieved 20 December 2017.
- Duerden, John (17 April 2020). "Chinese club Guangzhou Evergrande building world's biggest stadium for $1.7bn". ESPN.com. Retrieved 17 April 2020.
- Garner-Putkis, Zak (5 June 2020). "Why Tottenham Hotspur's $1 Billion Stadium Will Be The Last Of Its Kind". Forbes. Retrieved 9 November 2020.
- UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 2 February 2020.
- "Stadium Facts & Features". Wembley Stadium. Retrieved 9 November 2020.
- Abraham Achirga (18 July 2018). "Light rail line in Nigeria's capital opens to passengers". Reuters. Archived from the original on 9 July 2019. Retrieved 9 July 2019.
- "China Exim Bank to bankroll $1.79bn Abuja light rail". Sun News Online. Archived from the original on 26 March 2017. Retrieved 14 April 2017.
- "Lagos sign deal for construction of 38km-long fourth mainland bridge". The Nerve Africa. 25 May 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
- "Lagos-Calabar railway project: FG, CCECC sign $11.12bn MoU". Vanguard. 1 July 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
- Israel, Olumide (2 March 2014). "Railway: The return of the economic live wire!". Vanguard. Archived from the original on 2 July 2017. Retrieved 14 April 2017.
- "Lagos Rail Mass Transit". Lagos Metropolitan Area Transport Authority. 2015. Archived from the original on 1 December 2016. Retrieved 23 September 2015.
- "Lagos light rail to commence operation 2022 – Official". Premium Times. 12 August 2018. Archived from the original on 4 July 2019. Retrieved 9 July 2019.
- "Economic corridor: Chinese official sets record straight". The Express Tribune. 2 March 2015. Archived from the original on 3 March 2015. Retrieved 8 August 2015.
- "Incheon International Airport (ICA/RKSI)". airport-technology.com. AirportTechnology. 25 July 2019. Archived from the original on 25 May 2019. Retrieved 24 July 2019.
- Unknown (2019). "Incheon starts 4th-stage expansion project for new runway". The Korean Times. Archived from the original on 24 July 2019. Retrieved 24 July 2019.
- "PM Modi inaugurates Hyderabad Metro Rail". The Times of India. 28 November 2017. Archived from the original on 28 November 2017. Retrieved 9 July 2019.
- https://www.thehindu.com/news/cities/Hyderabad/metro-rail-line-to-raidurg-another-two-years-away/article21292572.ece
- Narendra Shah (17 April 2019). "Hyderabad Metro to Complete JBS-MGBS Metro Corridor by Nov 2019". Metro Rail News. Archived from the original on 17 April 2019. Retrieved 9 July 2019.
- Aneesh Phadnis (8 June 2019). "L&T; set to construct Navi Mumbai airport, likely to finish by mid-2020". Business Standard. Archived from the original on 7 August 2019. Retrieved 9 July 2019.
- "::: Welcome to Delhi Mumbai Industrial Corridor :::". delhimumbaiindustrialcorridor.com. Archived from the original on 19 March 2016. Retrieved 5 July 2017.
- "THE CONSTITUTION (AMENDMENT)". indiacode.nic.in. Archived from the original on 21 August 2016. Retrieved 5 July 2017.
- "Make in India: Delhi-Mumbai Industrial Corridor to invite first anchor investors in August", The Economic Times, 16 February 2016, archived from the original on 27 March 2019, retrieved 11 July 2020
- "JICA presents draft report on bullet train project to joint committee". timesofindia-economictimes. Archived from the original on 27 August 2016. Retrieved 11 July 2020.
- "Bharat Mala: PM Narendra Modi's planned ₹14,000 crore (US$2.0 billion) road from Gujarat to Mizoram", The Economic Times, New Delhi, 29 April 2015, archived from the original on 17 September 2016, retrieved 11 July 2020
- "Vision Ministry of Shipping, GOI, Government of India". SagarMala. 8 June 2018. Archived from the original on 17 October 2018. Retrieved 1 November 2018.
- "SagarMala – Concept & Objectives Ministry of Shipping, GOI, Government of India". sagarmala.gov.in. Archived from the original on 25 September 2018. Retrieved 1 November 2018.
- "India's hyperloop plans were all talk—until now". Quartz India. 2 September 2016. Archived from the original on 22 June 2020. Retrieved 11 July 2020.
- technology, BENGALURU (7 December 2016). "India in talks to build Hyperloop; two Indian companies involved in the project". ET online. Archived from the original on 6 December 2016. Retrieved 7 December 2016.
- "DGWHyperloop – Overview" (PDF). 29 October 2016. Archived from the original (PDF) on 4 November 2016. Retrieved 14 January 2017.
- Flora, Ian Ocampo (6 February 2020). "P175-B mega bridge project to connect CL, Southern Tagalog". Sun Star Pampanga. Archived from the original on 28 June 2020. Retrieved 25 June 2020.
- "About Us – MRT3 Stations". Metro Rail Transit. Archived from the original on 22 January 2013. Retrieved 8 June 2014.
- "Major infrastructure projects lined up". BusinessWorld. Archived from the original on 23 September 2015. Retrieved 6 July 2015.
- Esguerra, Darryl John. "Construction of Makati City subway system to start in December". Archived from the original on 19 September 2018. Retrieved 19 September 2018.
- "Malaysian firm waits NEDA's nod for P60-B MRT-9 project". ptvnews.ph. Archived from the original on 10 July 2018. Retrieved 10 July 2018.
- Tycoons unsolicited PPP projects bolster "Build, Build, Build". Archived 22 December 2019 at the Wayback Machine Inquirer.net. Retrieved 22 December 2019.
- News, Inquirer. "Metro Manila to kick off construction of P350-B subway in January". The Inquirer. Archived from the original on 27 December 2018. Retrieved 28 December 2018.
- "San Miguel, DOTr sign deal to build new Bulacan airport". ABS-CBN News. 18 September 2019. Archived from the original on 20 September 2019. Retrieved 18 September 2019.
- Camus, Miguel R. "DOTr plans to integrate new railway lines". The Inquirer. Archived from the original on 16 February 2019. Retrieved 16 February 2019.
- "DOF seals loan from China for PNR South Long Haul Project". Manila Bulletin Business. Archived from the original on 14 January 2020. Retrieved 14 January 2020.
- "Mindanao Railway project specs altered". BusinessWorld Online. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
- بازدید اعضای محترم کمیسیون عمران مجلس شورای انقلاب اسلامی از منطقه یک آزادراه تهران [Distinguished members of the Civil Commission of the Islamic Revolutionary Assembly visit District One of Tehran Freeway] (in Persian). Archived from the original on 13 December 2018.
- Unknown (2019). "Kuwait International Airport Passenger Terminal 2". GC Kuwait. Gulf Consults. Archived from the original on 24 July 2019. Retrieved 24 July 2019.
- "Qatar Expressway Program: One of the World's Largest Road and Infrastructure Projects" (PDF). KBR. Archived (PDF) from the original on 20 August 2018. Retrieved 20 August 2018.
- "Al Maktoum International Airport". Zawya.com. Archived from the original on 6 March 2012. Retrieved 30 March 2013.
- "Línea 2 del Metro iniciará operaciones a partir del 15 de enero". La Estrella. 3 June 2018. Archived from the original on 30 July 2018. Retrieved 1 November 2018.
- "Lo Bueno Avanza Metro de Panamá a 4 años de gestión del Presidente Varela". El Metro de Panama. 12 July 2018. Archived from the original on 17 October 2018. Retrieved 1 November 2018.
- Navigable Danube-Thessaloniki river link a project of 'huge significance', Tsipras and Vucic agree
- "European mega-project collaboration deal". tunneltalk.com. TunnelTalk. 11 October 2016. Archived from the original on 9 August 2017. Retrieved 9 August 2017.
- Herr, Roland (29 June 2016). "Megaprojects in Europe – Crossing Borders, Connecting Markets". tunnelingonline.com. Tunnel Business News. Archived from the original on 9 August 2017. Retrieved 9 August 2017.
- "Transit in Athens". Attiko Metro. Archived from the original on 19 June 2018. Retrieved 18 August 2018.
- "Funding". Attiko Metro. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
- "Tendering". Attiko Metro. Archived from the original on 20 August 2018. Retrieved 20 August 2018.
- Egnatia Odos. "The Construction of the Egnatia Motorway". www.egnatia.eu. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
- "Egnatia Railway". ec.europa.eu. Archived from the original on 15 January 2019. Retrieved 25 February 2019.
- "Greece Infrastructure". Foreign Policy. Archived from the original on 25 February 2019. Retrieved 25 February 2019.
- Nea Odos. "Financing the Project". www.neaodos.gr. Archived from the original on 19 August 2018. Retrieved 18 August 2018.
- "Χρηματοδότηση – ΑΤΤΙΚΟ ΜΕΤΡΟ Α.Ε." [Funding – Attiko Metro] (in Greek). Attiko Metro. 3 August 2019. Archived from the original on 3 August 2019. Retrieved 17 August 2019.
- "Στα 1,25δισ.ευρώ το κόστος της νέας σιδηροδρομικής γραμμής Θεσσαλονίκη-Καβάλα-Ξάνθη" (in Greek). Archived from the original on 24 June 2019. Retrieved 24 June 2019.
- ErgOSE. "TITHOREA – DOMOKOS". www.ergpse.gr. Archived from the original on 5 July 2018. Retrieved 18 August 2018.
- "Αθήνα – Θεσσαλονίκη σε λιγότερο από 3,5 ώρες, Της Αλεξάνδρας Κασσίμη". www.kathimerini.gr. Archived from the original on 30 January 2019. Retrieved 31 January 2019.
- "RESOLUTION NO 173/2017 OF THE COUNCIL OF MINISTERS of 7 November 2017 on the adoption of the Investment Preparation and Implementation Concept: Solidarity Airport – Central Transport Hub for the Republic of Poland" (PDF). Archived (PDF) from the original on 8 July 2019. Retrieved 8 July 2019.
- Pitcher, Greg (12 November 2020). "Head of Irish Sea crossing review team moots tunnel rather than bridge". The Architects’ Journal. Retrieved 29 December 2020.
- "Top 100: Canada's Biggest Infrastructure Projects for 2017". top100projects.ca. TOP100 Projects. Archived from the original on 1 September 2017. Retrieved 31 August 2017.
- Kate Porter (18 June 2019). "RTG promises to hand over LRT to city in August". CBC News. Archived from the original on 26 June 2019. Retrieved 9 July 2019.
- "Initial Investment | Project Connect by Capital Metro". Default. Retrieved 19 January 2021.
- "Project Connect Program Sequence". CapMetro. Retrieved 19 January 2021.
- "CREATE". www.nscorp.com. Archived from the original on 6 February 2018. Retrieved 5 February 2018.
- "Crescent Freight Corridor, United States of America". railway-technology.com. Archived from the original on 8 August 2017. Retrieved 8 August 2017.
- "Estimated cost of constructing Ohio River Bridges reduced in updated financial report to Federal Highway Administration | Ohio Bridges". kyinbridges.com. Archived from the original on 29 July 2017. Retrieved 29 July 2017.
- "Cross River Rail". Queensland Government. Archived from the original on 1 October 2017. Retrieved 29 September 2017.
- "OneSKY Project". Airservices. Archived from the original on 30 April 2018. Retrieved 30 April 2018.
- "Suburban Rail loop". Victorian Government. Archived from the original on 7 March 2019. Retrieved 5 March 2019.
- "Sydney Central Station Airspace Redevelopment, NSW". Webb Australia. Archived from the original on 28 February 2014. Retrieved 24 February 2014.
- "Work on Sydney Harbour tunnels to start". 25 June 2017. Archived from the original on 25 June 2017. Retrieved 3 March 2019.
- Abdel bary, Hossam (26 September 2015). "Eastown & Westown Egypt". slideshare.net. Solidere. Retrieved 2 November 2017.
- Unknown (2019). "GALALA CITY". sitesint.com. Sites International. Retrieved 24 July 2020.
- Ricardo Reboredo (6 March 2019). "What a failed futuristic smart-city in Modderfontein tells us about African mega-cities". The Citizen. Zambia. Archived from the original on 16 May 2019. Retrieved 16 May 2019.
- "Shanghai Zendai Plans $7.8 Billion 'New York of Africa'". Bloomberg. Archived from the original on 6 March 2016. Retrieved 13 January 2016.
- "Work begins on South Africa's R84bn smart city". Brand South Africa. Archived from the original on 2 January 2016. Retrieved 13 January 2016.
- "World's Fastest Growing Cities are in Asia and Africa". Euromonitor. 2 March 2010. Archived from the original on October 2015. Retrieved 26 October 2015.
- "Get To Know Abuja". Abuja City. Archived from the original on 23 September 2015. Retrieved 27 September 2015.
- "Asokoro Island". asokoroisland.com. Archived from the original on 9 August 2017. Retrieved 8 August 2017.
- "Asokoro Island: Abuja's new, exclusive destination for luxury living". Market Watch. 30 September 2014. Archived from the original on 14 May 2016. Retrieved 29 April 2016.
- "FG urges Nigerians in Diaspora to invest in Centenary City". Vanguard Newspapers. 26 July 2013. Archived from the original on 1 October 2013. Retrieved 8 October 2013.
- "Centenary City Abuja – What to Expect". Estate Intel. 18 August 2014. Archived from the original on 19 September 2014. Retrieved 22 February 2012.
- Njoku, Jude (16 September 2014). "FG, developer sign deal on Festac Phase 2". Vanguard. Retrieved 23 December 2015.
- "Nigeria: Development Plan Dismisses Threats to Lekki/Victoria Island's Real Estate Prospects". allafrica.com. 6 July 2015. Archived from the original on 22 December 2015. Retrieved 15 December 2015.
- Appraisal of City Development Plan – Navi Mumbai Archived 15 September 2012 at the Wayback Machine. National Institute of Urban Affairs, 2008.
- "10 infrastructure projects India can be proud of". ArabianIndustry.com. Archived from the original on 6 September 2014. Retrieved 6 September 2014.
- "Concept – GIFT Gujarat, Gujarat International Tec City, Gujarat International Finance Tec-City (GIFT)". giftgujarat.in.
- "Capital Development Authority". Archived from the original on 12 May 2016.
- toot. "About Bahria Town Karachi – Bahria Town – Your Lifestyle Destination". bahriatown.com. Archived from the original on 11 May 2017. Retrieved 12 May 2017.
- "Sustainable Transportation in DHA City Karachi (DCK) – All You Need To Know!". DHA Today. 14 April 2014. Archived from the original on 9 September 2015. Retrieved 8 October 2015.
- "Pakistan Defence Officers Housing Authority, Karachi". DHA Karachi. Archived from the original on 7 September 2015. Retrieved 11 September 2015.
- rasheed (22 September 2013). "$10 Billion Ravi River Front Project Launched". PKPolitics Discuss. Archived from the original on 25 June 2014. Retrieved 8 October 2015.
- "Home". Oman Tribune. Archived from the original on 18 August 2014. Retrieved 8 October 2015.
- Noor Aftab (20 January 2014). "New city project in Lahore suburbs on the anvil". The News International. Archived from the original on 5 August 2014. Retrieved 8 October 2015.
- "Launch of LDA City delayed". Dawn. 9 January 2015. Archived from the original on 28 September 2015. Retrieved 27 September 2015.
- "Colombo Port City: White Elephant? Affront to human rights? – Sri Lanka Campaign for Peace and Justice". Sri Lanka Campaign for Peace and Justice. Archived from the original on 26 September 2015. Retrieved 30 October 2015.
- Ragananthini, V. (18 July 2017). "Ekovest lines up RM16.5b worth of projects within KL River City". The Sun Daily. Archived from the original on 16 August 2017. Retrieved 15 August 2017.
- "Iran Mall". Archived from the original on 31 May 2020. Retrieved 17 July 2020.
- "Jordan's $5 billion Abdali project: serious investment potential". Archived from the original on 23 September 2015. Retrieved 21 August 2015.
- "Shiny new downtown launched in Amman". Archived from the original on 29 May 2019. Retrieved 21 August 2015.
- Zareva, Teodora (1 November 2017). "Saudi Arabia Is Building a $500-Billion New Territory Based on Tech and Liberal Values". bigthink.com. bigthink. Archived from the original on 1 November 2017. Retrieved 2 November 2017.
- "Welcome to Neom, Saudi Arabia's city of the future". arabianbusiness.com. arabianBusiness. Archived from the original on 29 October 2017. Retrieved 2 November 2017.
- "kentsel_donusumun_maliyeti_ne_kadar_ konut insaat 1543567 html Haberleri ve kentsel_donusumun_maliyeti_ne_kadar_ konut insaat 1543567 html Geli艧meleri – Milliyet". milliyet.com.tr. Archived from the original on 29 October 2013. Retrieved 4 October 2013.
- "Kentsel Dönüşümün Maliyeti Ne Kadar?". eypyapi.com. Archived from the original on 8 February 2015. Retrieved 4 October 2013.
- "Kentsel dönüşüm için 400 proje". ekonomi.haberturk.com. 18 May 2012. Archived from the original on 5 October 2013. Retrieved 4 October 2013.
- "T.C. ÇEVRE ve ŞEHİRCİLİK BAKANLIĞI – Altyapı ve Kentsel Dönüşüm Hizmetleri Genel Müdürlüğü". csb.gov.tr. Archived from the original on 31 August 2012. Retrieved 4 October 2013.
- ABDULKADİR CEMBEKLİ (7 September 2013). "Fikirtepe'de 40 milyar liralık kentsel dönüşüm başlıyor". ZAMAN. Archived from the original on 5 October 2013.
- Linda Poon (19 May 2016). "Sweden Is Moving an Entire City". The Atlantic. Archived from the original on 8 September 2017. Retrieved 7 September 2017.
- Lambert, Fred (19 October 2017). "Europe's Nortvolt battery gigafactory lands in Sweden". Electrek. Archived from the original on 13 December 2017. Retrieved 12 December 2017.
- www.fosterandpartners.com, Foster + Partners /. "New Slussen Masterplan | Foster + Partners". www.fosterandpartners.com. Archived from the original on 16 September 2019. Retrieved 25 November 2019.
- "Brickell Key on Claughton Island". Archived from the original on 2 March 2017. Retrieved 1 March 2017.
- "FMC Technologies breaks ground on corporate campus". HoustonChronicle.com. 6 May 2014. Retrieved 29 July 2020.
- "City Living: Battery Park City". Archived from the original on 27 December 2014. Retrieved 1 March 2017.
- "America Rebuilds: A Year at Ground Zero". Archived from the original on 5 August 2017. Retrieved 3 September 2017.
- "53 West 53rd". The Skyscraper Center. Archived from the original on 9 July 2019. Retrieved 9 July 2019.
- "Queen's Wharf Brisbane". Destination Brisbane Consortium. Archived from the original on 25 February 2018. Retrieved 29 September 2017.
- Brasília in the World Archived 15 July 2014 at the Wayback Machine (in English)
- Brasília, 50 Years as the Capital Archived 24 February 2017 at the Wayback Machine (in English)
- "- badagry-port.com". www.badagry-port.com. Archived from the original on 12 February 2018. Retrieved 14 April 2017.
- "Ambode Revs up $2.3bn Badagry Deep Sea Port Project". This Day Live. 8 October 2016. Archived from the original on 15 April 2017. Retrieved 14 April 2017.
- "Lekki Port". www.lekkiport.com. Archived from the original on 11 March 2019. Retrieved 17 July 2020.
- Ebosele, Moses (20 May 2015). "Contractor pledges to deliver $1.65b Lekki deep seaport in 41 months". The Guardian. Archived from the original on 16 May 2017. Retrieved 10 August 2017.
- Chang, Gordon G. (8 January 2014). "China's Water Crisis Made Worse by Policy Failures". World Affairs. Archived from the original on 23 July 2019. Retrieved 23 November 2018.
- "Sagarmala Programme". pib.nic.in. Retrieved 25 April 2017.
- Macguire, Eoghan (20 November 2013). "Cuba libre: Could port herald new economic age for communist island?". CNN. Archived from the original on 14 August 2017. Retrieved 14 August 2017.
- McDonald, Michael D (17 March 2016). "China Slowdown Not Holding Back Nicaragua Canal, Contractor Says". BloombergBusiness. Archived from the original on 22 March 2016. Retrieved 21 March 2016.